Less Ads, More Data, More Tools Register for FREE

Pin to quick picksDCP.L Regulatory News (DCP)

  • There is currently no data for DCP

Trading Statement

25 Oct 2007 07:30

Diamondcorp Plc25 October 2007 DiamondCorp plc ("DiamondCorp" or the "Company") Trading Update for the three months ending 30 September 2007 25 October 2007 Highlights • Lace mine diamond recovery plant commissioned.• 9,290 carats of diamonds recovered during commissioning from 120,399 tonnes of tailings, including a 17.72 carat stone and a 13.81 carat stone.• 5,412 carats sold at tender for US$261,105.• More than 80% of the diamonds recovered to date are gem quality, including a high proportion of clear white stones, a significant proportion of fancy yellow stones, as well as more than 300 small pink and vivid purple diamonds and one small intense blue diamond.• As a result of the high quality of the diamonds recovered from the tailings, a programme for accelerated development of the Lace underground mine has been adopted.• After the quarter, the Company's option to purchase Sonop was terminated. As a result, trading in the Company's shares was restored on AIM.• Management worked with Investec Bank during the quarter to progress the process of obtaining a listing for DiamondCorp's shares on the JSE Limited. South African Operations - Lace Diamond Mine (DiamondCorp 74%) During the quarter, commissioning of a 1.6 million tonne per annum dense mediaseparation plant was completed at the Company's 74% owned Lace diamond mine,near Kroonstad, 200km southwest of Johannesburg. During commissioning, 120,399tonnes of tailings were treated for the recovery of 9,290 carats of diamonds,representing a recovered grade of 7.72 carats per hundred tonnes (cpht). Approximately 40% of the tailings treated during commissioning have beenstockpiled awaiting re-crushing to liberate additional diamonds locked up in+6mm to 28mm kimberlite particles. This material is currently being processedthrough the recrush circuit which was not operational during commissioning.Since commencement of the recrush circuit, the recovered grade of run of minetailings has been in excess of the budgeted 10.8 cpht. The recrush material willnow be treated in a campaign to clear the stockpile. Once this is cleared, theplant should achieve a steady state production of approximately 4,000 tonnes oftailings material per day. During the period, 5,412 carats recovered during commissioning were sold attender for proceeds of US$261,105. DiamondCorp will hold another tender of Lacediamonds before the end of the year. In assessing the first tender parcel, the company's independent diamond advisersWWW International Diamond Consultants noted that the colour of the Lace diamondswas above world average and the better-quality parcels contained a healthyproportion of well formed crystal and octahedron sawable shapes. More than 80% of the production is gem quality, and management is pleased withthe significant proportion of fancy coloured stones in the production. More than7% of production comprises fancy intense yellow stones, and to date more than300 small intense pink and vivid purple diamonds have been recovered. One smallintense blue diamond has also been recovered. Commenting on the production, DiamondCorp's managing director Paul Loudon said:"The quality of the stones is exceeding our expectations and the significantproportion of fancy coloured stones including the rarest diamond of them all -an intense blue diamond - augurs well for high quality production fromunderground at Lace. As a result, management has formulated an accelerateddevelopment plan which aims to introduce pipe material into the mine plan by thethird quarter of next year." The accelerated plan involves a sinking decline shaft into the unmined portionof the Lace satellite pipe which was only mined by open pit methods to a depthof 50m. Bulk testing followed by trial underground mining of the satellite pipekimberlite via the decline shaft will be undertaken simultaneously with therefurbishment of the existing 360m deep 4.6m x 2.7m vertical shaft whichaccesses the main Lace pipe. Snowden Mining Industry Consultants Pty Ltd hasbeen engaged to work with Lace management in completing a Scoping Study on theaccelerated development plan during the current quarter. Operations - Other During the quarter, the Company signed an option agreement to acquire SonopDiamond Mining (Pty) Limited, South Africa's largest private diamond miningcompany for 7.5 million DiamondCorp shares and US$45 million in cash. As aresult of signing the option, the company's shares were suspended from tradingon AIM. During October, DiamondCorp and Sonop mutually agreed to terminate theoption and, accordingly, DiamondCorp has requested that trading in its ordinaryshares on AIM be restored. DiamondCorp continues to evaluate the Sonop assets aspart of its ongoing programme to expand its diamond production base in SouthAfrica. During the quarter, management also assessed a number of other diamondproduction opportunities and several of these opportunities are beingprogressed. No activities were undertaken on the Company's explorationproperties during the quarter. Corporate Management worked with Investec Bank during the quarter to progress the processof obtaining a listing for DiamondCorp's shares on the JSE Limited. For further information, please contact: Paul Loudon, Managing Director and CEODiamondcorp plc+44 20 7256 2651 Joe Nally/Simon SouthwoodCenkos Securities plc+44 20 7397 8900 Robert Smith/Cindy StoutjesdykInvestec Bank Limited+27 11 286 7662 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
19th Oct 20163:20 pmRNSForm 8.3 - DiamondCorp Plc
19th Oct 20161:57 pmRNSForm 8.3 - DiamondCorp Plc
19th Oct 20167:13 amRNSForm 8.3 - Diamondcorp Plc
18th Oct 20162:40 pmRNSForm 8.3 - DiamondCorp Plc
18th Oct 201612:59 pmRNSForm 8.3 - Diamondcorp Plc
18th Oct 201612:17 pmRNSForm 8.3 - Diamondcorp Plc
18th Oct 20167:00 amRNSSTRATEGIC REVIEW
18th Oct 20167:00 amRNSMining Resumes at the Lace Diamond Mine
14th Oct 20167:00 amRNSFunding Update
13th Oct 201610:10 amRNSOPERATIONAL AND FINANCIAL UPDATE
12th Oct 20167:00 amRNSProject and Financial Update
20th Sep 201612:45 pmRNSUpdate on Diamond Sales from the Lace Diamond Mine
13th Sep 20167:00 amRNSInterim Results and Operational Update
9th Aug 20167:00 amRNSLace Diamond Mine Operational Update
26th Jul 20163:00 pmRNSLACE DIAMOND MINE UNDERGROUND MINING RESUMES
18th Jul 20167:00 amRNSLace Diamond Mine
14th Jul 20167:00 amRNSDirector/PDMR Shareholding & Amendment
12th Jul 20167:00 amRNSExercise of Broker Option and Directors' Dealings
7th Jul 20169:59 amRNSPlacing and Subscription & Broker Option
16th Jun 20167:50 amRNSResult of AGM
14th Jun 20167:00 amRNSLace Diamond Mine - Diamond Sales & Project Update
19th May 20167:00 amRNSAnnual Financial Report
4th May 20167:00 amRNSFinal Results
19th Apr 20167:00 amRNSPolished Diamond Sales and Project Update
5th Apr 20167:00 amRNSLace Diamond Mine - March Quarter Update
2nd Mar 20167:00 amRNSResource Statement
1st Feb 20167:00 amRNSDirectorate Change
26th Jan 20167:00 amRNSLace Diamond Mine Project Update
7th Jan 20161:30 pmRNSResult of General Meeting
23rd Dec 20157:00 amRNSPosting of Circular
22nd Dec 20157:00 amRNSAdditional Listing
16th Dec 20157:00 amRNSLace Mine Ramp Up Commences From Uk4 Block
3rd Dec 20154:20 pmRNSResults of Placing and Directors' Dealings
3rd Dec 20157:00 amRNSIDC Loan & £4m Proposed Placing
2nd Dec 20154:37 pmRNSIDC Loan & £4m Proposed Placing
20th Nov 20157:00 amRNSLace Mine - 290M Level Development Resumes
12th Nov 20157:00 amRNSConveyor Belt Commissioned
3rd Nov 20157:00 amRNSLace Diamond Mine Project Update
13th Oct 20157:00 amRNSConveyor Belt Installation Diamond Sales Valuation
1st Sep 20157:03 amRNSInterim Results
31st Jul 20157:00 amRNSLace Diamond Mine Project Update
9th Jul 20151:00 pmRNSDirector/PDMR Shareholding
6th Jul 20157:00 amRNSResult of Open Offer
26th Jun 20157:00 amRNSResult of AGM
17th Jun 20157:00 amRNSOpen Offer
5th Jun 20157:00 amRNSPlacing and Subscription to raise £3.18 million
3rd Jun 20157:44 amRNSAnnual Financial Report
26th May 20158:14 amRNSFinal Results
15th May 20157:00 amRNSChange of Registered Office
14th May 20158:30 amRNSAdditional Listing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.