Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Goudron Drilling Update

4 Aug 2014 07:34

RNS Number : 1303O
Leni Gas & Oil PLC
04 August 2014
 

For Immediate Release

4 August 2014

 

 

Leni Gas & Oil PLC

("LGO" or the "Company")

 

Goudron Drilling Update, Trinidad

 

LGO is today pleased to announce the results of the evaluation of the electric logs in well GY-667, the fourth of its planned 30 new development wells at the Goudron Field in Trinidad, and the third well from this drill pad.

 

Evaluation of the electric logs has shown the presence of 219 feet of net oil pay in the Gros Morne Sandstone, including a thick massive sandstone interval of 130 foot at a depth of 2,596 feet MD. Pressure data indicates that the Gros Morne at this location is at primary pressure and is therefore expected to give excellent free flowing oil production.

 

Neil Ritson, LGO's Chief Executive, commented:

 

"Well GY-667 appears to be our best well so far in the drilling campaign and has a really excellent oil pay in the Gros Morne. The rig will now move to the final location from the current pad and spud the fifth well of the program, following which we will be able to put on production this well along with the others on the pad. We are very encouraged by the results we are obtaining at Goudron and look forward to the rest of this year's drilling there."

 

The Lower Cruse Sandstone are encountered cleaner and better developed than seen in nearby wells with a total of 28 feet of net oil pay encountered in two distinct layers. Further investigation of the Lower Cruse will continue during the current phase of drilling; during which the primary reservoir target will remain the Gros Morne Sandstone.

 

In addition to electric logs and downhole pressure data, sidewall cores were collected in the Gros Morne and Lower Cruse and these will be analysed for porosity and permeability to aid in ongoing development studies now underway with Senergy (GB) Limited.

 

In addition, as previously announced, GY-667 contains 187 feet of net oil pay in the Goudron sandstones.

 

The well will now be cased and the rig skidded to the final location on the current pad, which is expected to be designated GY-668. A summary of the drilling program results to date is given in the Appendix below.

 

 

Competent Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for Leni Gas & Oil Plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

 

Enquiries:

Leni Gas & Oil plc

David Lenigas

Neil Ritson

+44 (0)20 7440 0645

 

Beaumont Cornish Limited

Nomad and Joint Broker

Rosalind Hill Abrahams

Roland Cornish

+44(0) 20 7628 3396

 

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

+44(0) 20 7493 8188

 

Pelham Bell Pottinger

Financial PR

Mark Antelme

 +44 (0) 20 7861 3232

Henry Lerwill

 

 

Appendix:

Well

Name

Spud

Date

Total Depth

(MD feet)

Date Total Depth Reach-ed

 

Goudron

Net Oil Pay

(feet)

Gros Morne

Net Oil Pay

(feet)

Lower Cruse Net Oil Pay

(feet)

Compl-etion Date

Completion Formation

Completed Interval (feet)

Initial Production Rate

(bopd)

1

GY-664

28 April

4212

13 May

192

300

79

30 May

Gros Morne

278

240

2

GY-665

27 May

2750

8 June

195

256

np

3

GY-666

16 June

3357

1 July

185

209

28

4

GY-667

10 July

4006

30 July

187

219

28

5

GY-668

All depths are quoted as measured depth in feet below Kelly bushing

np = not penetrated

 

Glossary:

Pay: A reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay.

MD: Measured Depth

TD: Total Depth

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUSONRSRAWRRR
Date   Source Headline
18th Sep 20157:00 amRNSUnaudited Interim Results
7th Sep 201510:30 amRNSDrilling update, Trinidad
28th Aug 20159:00 amRNSInitial production rates Pad-5, Goudron
21st Aug 20157:00 amRNSSPA signed in 2014, Tabaquite Block, Trinidad
20th Aug 20157:00 amRNSInitial Production Rate Well GY-675, Goudron Field
17th Aug 20157:00 amRNSDrilling Update, Trinidad
12th Aug 20157:00 amRNSDrilling Update, Trinidad
6th Aug 20153:06 pmRNSTotal Voting Rights
29th Jul 20157:01 amRNSOperational Update
16th Jul 201510:17 amRNSGoudron Pad 4 Testing Update, Trinidad
9th Jul 201510:01 amRNSCedros Peninsula Update, Trinidad
7th Jul 20151:42 pmRNSResult of AGM
6th Jul 20157:00 amRNSGoudron Drilling Update
29th Jun 20157:00 amRNSGoudron Pad 4 Testing
24th Jun 20157:00 amRNSUpgraded Resource Assessment, Trinidad
17th Jun 20157:00 amRNSGoudron Pad 4 Testing and Infrastructure
15th Jun 201510:44 amRNSGoudron Pad 5 Drilling Update, Trinidad
11th Jun 20159:46 amRNSGoudron Drilling Update, Trinidad
2nd Jun 20157:00 amRNSReport and Accounts and Notice of AGM
28th May 20159:23 amRNSChange of Registered Office
22nd May 20157:00 amRNSGoudron Drilling Update, Trinidad
30th Apr 20158:00 amRNSGoudron Drilling and Field Update
15th Apr 20157:00 amRNSGoudron Drilling and Field Update
31st Mar 20154:18 pmRNSTotal Voting Rights
17th Mar 201510:13 amRNSUS$11.78 million drawn, and Goudron Field update
24th Feb 20158:00 amRNSIssue of Debt
24th Feb 20157:37 amRNSIssue of Equity
23rd Feb 20154:56 pmRNSProposed placing to raise at least £4m (US$6m)
19th Feb 201510:01 amRNSFTG Survey Completion
18th Feb 20159:46 amRNSGoudron Operational Update
26th Jan 201510:00 amRNSFlow rate of well GY-669 and Goudron Field update
15th Jan 20157:00 amRNS£1 million raised for Goudron, and Cedros update
6th Jan 20157:00 amRNSGroup Production and Goudron Field Update
5th Jan 20157:00 amRNSAppointment of Joint Broker
31st Dec 20148:00 amRNSTotal Voting Rights
22nd Dec 20147:00 amRNSBoard appointment
15th Dec 20147:00 amRNSFlow rate of Goudron well GY-670 exceeds 1,000bopd
8th Dec 20147:00 amRNSDrilling Update, Rig Secured and CPR Commissioned
4th Dec 201411:18 amRNSGroup Production Update
1st Dec 20148:00 amRNSDirector Option Awards and Share Issue
27th Nov 20149:47 amRNSAgreement to acquire BOLT deep rights
24th Nov 20147:00 amRNSGoudron Drilling and Production Update, Trinidad
19th Nov 20147:00 amRNSGoudron Drilling Update, Trinidad
11th Nov 201410:59 amRNSReplacement: Goudron Drilling Update
11th Nov 20147:00 amRNSGoudron Drilling Update
4th Nov 20142:25 pmRNSChange of Name
30th Oct 20146:17 pmRNS£2.3 million raised for Cedros, Trinidad
30th Oct 20149:48 amRNSSurvey and Cedros Update, Trinidad
29th Oct 20149:46 amRNSGoudron Drilling Update
20th Oct 201410:47 amRNSGoudron Drilling Update, GY-669

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.