Goudron Drilling Update

11 Nov 2014 07:00

RNS Number : 6613W
LGO Energy PLC
11 November 2014
 

For Immediate Release, 7 am

11 November 2014

 

 

 

LGO ENERGY PLC

("LGO" or the "Company")

 

Goudron Drilling Update

 

LGO is today pleased to announce that well GY-670, the seventh of its planned 30 new development wells at the Goudron Field in Trinidad, is drilling ahead in the Gros Morne Sandstones at a depth of approximately 2,750 feet measured depth ("MD") after the setting of the planned intermediate 9 5/8-inch casing at 2,394 feet MD. A total of 206 feet of net oil pay were identified on electric logs in the Goudron Sandstone formation.

 

Well GY-670 was originally planned to test the Goudron and Gros Morne Sandstone reservoirs to a total depth ("TD") of at least 3,100 feet TVDss (equivalent to 3,305 feet measured depth ("MD")) however, following further analysis of the recent well, GY-669, it has been decided to deepen the well to drill the entire high pressure Lower Cruse section and to reach the pre-Cruse at a new estimated TD of 4,250 feet MD.

 

Analysis of the sixth new Goudron well, GY-669, which reached a TD of 3,505 feet MD has now been completed. The net pay in the Gros Morne Sandstone and Lower Cruse, which grade into one another with no defined lithological boundary, has been measured as 248 feet. The previous use of the term C-sands to encompass undifferentiated sands between the pre-Mayaro unconformity (the base Goudron Sands) and the pre-Cruse seems to be appropriate to well GY-669 and may be adopted for future simplicity.

 

A minor re-evaluation of the fault configuration following the results of GY-669 has led to the conclusion that the previously planned Goudron Sandstone well, anticipated to be the fourth from Pad 3, is not ideally situated and the drilling of that well may be deferred until 2015. Three wells from Pad 3, all targeting the Gros Morne (C-sands), will be drilled and completed by end 2015.

 

Optimisation of the production from Pad 2 is awaiting approval to recomplete well GY-667 in the more extensive and productive Gros Morne reservoir which was recorded to have 219 feet of net oil pay from electric logging. That approval is now thought to be imminent and recompletion will start immediately that approval is received.

 

Neil Ritson, LGO's Chief Executive, commented:

"The development drilling has continued to produce results in line with or ahead of expectations and GY-670 is progressing to plan and will be deepened to intersect with all likely oil bearing reservoirs. Once GY-670 reaches TD the third and final Gros Morne well on Pad 3, GY-671, will be drilled and then it is expected to complete all three wells as producers by end year. This will lead to a further significant increase in production as we go into 2015."

 

A summary of the drilling program results to date is given in the Appendix below.

 

Competent Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for LGO Energy Plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

Enquiries:

LGO Energy plc

Neil Ritson

+44 (0)20 7440 0645

 

Beaumont Cornish Limited

Nomad and Joint Broker

Rosalind Hill Abrahams

Roland Cornish

+44(0) 20 7628 3396

 

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

+44(0) 20 7493 8188

 

Pelham Bell Pottinger

Financial PR

 +44 (0) 20 3772 2500

Henry Lerwill

 

 

Appendix:

Well

Name

Spud

Date

Total Depth

(MD feet)

Date Total Depth Reached

Goudron

Net Oil Pay

(feet)

Gros Morne

Net Oil Pay

(feet)

Lower Cruse Net Oil Pay

(feet)

1

GY-664

28 April

4212

13 May

192

300

79

2

GY-665

27 May

2750

8 June

195

256

np

3

GY-666

16 June

3357

1 July

185

209

28

4

GY-667

10 July

4006

30 July

187

219

28

5

GY-668

9 August

3026

27 August

191

254

np

6

GY-669

5 October

3505

24 October

229

248

**

7

GY-670

28 October

206

na

na

All depths are quoted as measured depth in feet below Kelly bushing

** = undifferentiated from Gros Morne

na = not yet available

np = not penetrated

 

Glossary:

Pay: A reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay.

MD: Measured Depth

psi: pounds per square inch

TD: Total Depth

TVDss: True Vertical Depth sub sea

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDMMMMZGDGDZZ
Date   Source Headline
18th Sep 20157:00 amRNSUnaudited Interim Results
7th Sep 201510:30 amRNSDrilling update, Trinidad
28th Aug 20159:00 amRNSInitial production rates Pad-5, Goudron
21st Aug 20157:00 amRNSSPA signed in 2014, Tabaquite Block, Trinidad
20th Aug 20157:00 amRNSInitial Production Rate Well GY-675, Goudron Field
17th Aug 20157:00 amRNSDrilling Update, Trinidad
12th Aug 20157:00 amRNSDrilling Update, Trinidad
6th Aug 20153:06 pmRNSTotal Voting Rights
29th Jul 20157:01 amRNSOperational Update
16th Jul 201510:17 amRNSGoudron Pad 4 Testing Update, Trinidad
9th Jul 201510:01 amRNSCedros Peninsula Update, Trinidad
7th Jul 20151:42 pmRNSResult of AGM
6th Jul 20157:00 amRNSGoudron Drilling Update
29th Jun 20157:00 amRNSGoudron Pad 4 Testing
24th Jun 20157:00 amRNSUpgraded Resource Assessment, Trinidad
17th Jun 20157:00 amRNSGoudron Pad 4 Testing and Infrastructure
15th Jun 201510:44 amRNSGoudron Pad 5 Drilling Update, Trinidad
11th Jun 20159:46 amRNSGoudron Drilling Update, Trinidad
2nd Jun 20157:00 amRNSReport and Accounts and Notice of AGM
28th May 20159:23 amRNSChange of Registered Office
22nd May 20157:00 amRNSGoudron Drilling Update, Trinidad
30th Apr 20158:00 amRNSGoudron Drilling and Field Update
15th Apr 20157:00 amRNSGoudron Drilling and Field Update
31st Mar 20154:18 pmRNSTotal Voting Rights
17th Mar 201510:13 amRNSUS$11.78 million drawn, and Goudron Field update
24th Feb 20158:00 amRNSIssue of Debt
24th Feb 20157:37 amRNSIssue of Equity
23rd Feb 20154:56 pmRNSProposed placing to raise at least £4m (US$6m)
19th Feb 201510:01 amRNSFTG Survey Completion
18th Feb 20159:46 amRNSGoudron Operational Update
26th Jan 201510:00 amRNSFlow rate of well GY-669 and Goudron Field update
15th Jan 20157:00 amRNS£1 million raised for Goudron, and Cedros update
6th Jan 20157:00 amRNSGroup Production and Goudron Field Update
5th Jan 20157:00 amRNSAppointment of Joint Broker
31st Dec 20148:00 amRNSTotal Voting Rights
22nd Dec 20147:00 amRNSBoard appointment
15th Dec 20147:00 amRNSFlow rate of Goudron well GY-670 exceeds 1,000bopd
8th Dec 20147:00 amRNSDrilling Update, Rig Secured and CPR Commissioned
4th Dec 201411:18 amRNSGroup Production Update
1st Dec 20148:00 amRNSDirector Option Awards and Share Issue
27th Nov 20149:47 amRNSAgreement to acquire BOLT deep rights
24th Nov 20147:00 amRNSGoudron Drilling and Production Update, Trinidad
19th Nov 20147:00 amRNSGoudron Drilling Update, Trinidad
11th Nov 201410:59 amRNSReplacement: Goudron Drilling Update
11th Nov 20147:00 amRNSGoudron Drilling Update
4th Nov 20142:25 pmRNSChange of Name
30th Oct 20146:17 pmRNS£2.3 million raised for Cedros, Trinidad
30th Oct 20149:48 amRNSSurvey and Cedros Update, Trinidad
29th Oct 20149:46 amRNSGoudron Drilling Update
20th Oct 201410:47 amRNSGoudron Drilling Update, GY-669

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.