LGO is today pleased to announce that well GY-670, the seventh of its planned 30 new development wells at the Goudron Field in Trinidad, is drilling ahead in the Gros Morne Sandstones at a depth of approximately 2,750 feet measured depth ("MD") after the setting of the planned intermediate 9 5/8-inch casing at 2,394 feet MD. A total of 206 feet of net oil pay were identified on electric logs in the Goudron Sandstone formation.

 

Well GY-670 was originally planned to test the Goudron and Gros Morne Sandstone reservoirs to a total depth ("TD") of at least 3,100 feet TVDss (equivalent to 3,305 feet measured depth ("MD")) however, following further analysis of the recent well, GY-669, it has been decided to deepen the well to drill the entire high pressure Lower Cruse section and to reach the pre-Cruse at a new estimated TD of 4,250 feet MD.

 

Analysis of the sixth new Goudron well, GY-669, which reached a TD of 3,505 feet MD has now been completed. The net pay in the Gros Morne Sandstone and Lower Cruse, which grade into one another with no defined lithological boundary, has been measured as 248 feet. The previous use of the term C-sands to encompass undifferentiated sands between the pre-Mayaro unconformity (the base Goudron Sands) and the pre-Cruse seems to be appropriate to well GY-669 and may be adopted for future simplicity.

 

A minor re-evaluation of the fault configuration following the results of GY-669 has led to the conclusion that the previously planned Goudron Sandstone well, anticipated to be the fourth from Pad 3, is not ideally situated and the drilling of that well may be deferred until 2015. Three wells from Pad 3, all targeting the Gros Morne (C-sands), will be drilled and completed by end 2015.

 

Optimisation of the production from Pad 2 is awaiting approval to recomplete well GY-667 in the more extensive and productive Gros Morne reservoir which was recorded to have 219 feet of net oil pay from electric logging. That approval is now thought to be imminent and recompletion will start immediately that approval is received.

 

Neil Ritson, LGO's Chief Executive, commented:

"The development drilling has continued to produce results in line with or ahead of expectations and GY-670 is progressing to plan and will be deepened to intersect with all likely oil bearing reservoirs. Once GY-670 reaches TD the third and final Gros Morne well on Pad 3, GY-671, will be drilled and then it is expected to complete all three wells as producers by end year. This will lead to a further significant increase in production as we go into 2015."

 

A summary of the drilling program results to date is given in the Appendix below.

 

Competent Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for LGO Energy Plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

Enquiries:

LGO Energy plc

Neil Ritson

+44 (0)20 7440 0645

 

Beaumont Cornish Limited

Nomad and Joint Broker

Rosalind Hill Abrahams

Roland Cornish

+44(0) 20 7628 3396

 

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

+44(0) 20 7493 8188

 

Pelham Bell Pottinger

Financial PR

 +44 (0) 20 3772 2500

Henry Lerwill

 

 

Appendix:

Well

Name

Spud

Date

Total Depth

(MD feet)

Date Total Depth Reached

Goudron

Net Oil Pay

(feet)

Gros Morne

Net Oil Pay

(feet)

Lower Cruse Net Oil Pay

(feet)

1

GY-664

28 April

4212

13 May

192

300

79

2

GY-665

27 May

2750

8 June

195

256

np

3

GY-666

16 June

3357

1 July

185

209

28

4

GY-667

10 July

4006

30 July

187

219

28

5

GY-668

9 August

3026

27 August

191

254

np

6

GY-669

5 October

3505

24 October

229

248

**

7

GY-670

28 October

206

na

na

All depths are quoted as measured depth in feet below Kelly bushing

** = undifferentiated from Gros Morne

na = not yet available

np = not penetrated

 

Glossary:

Pay: A reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay.

MD: Measured Depth

psi: pounds per square inch

TD: Total Depth

TVDss: True Vertical Depth sub sea

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDMMMMZGDGDZZ
Date   Source Headline
15th Oct 20187:00 amRNSConditional placing to raise £2.5m
12th Oct 20184:46 pmRNSHolding(s) in Company
12th Oct 20184:22 pmRNSHolding(s) in Company
10th Oct 20187:00 amRNSBusiness, Operational and Financial Update Q3
8th Oct 20187:00 amRNSCompletion of Steeldrum Acquisition
27th Sep 20187:00 amRNSUnaudited Interim Results
10th Sep 20187:00 amRNSCory Moruga Block: Snowcap Licence Extension
6th Sep 20187:00 amRNSHolding(s) in Company
29th Aug 201810:24 amRNSPetrotin Restructuring
14th Aug 20188:34 amRNSIssue of Equity, TVR
13th Jul 20185:16 pmRNSResult of AGM
13th Jul 20187:00 amRNSAcquisition, New Convertible and Business Update
2nd Jul 20187:03 amRNSUpdate on Director remuneration and options
25th Jun 20187:00 amRNSSPA signed for 50% Interest in Icacos Field
12th Jun 20187:00 amRNSAccounts for year to 31 Dec 2017 and Notice of AGM
25th Apr 20187:00 amRNSHolding(s) in Company
16th Apr 20187:25 amRNSPotential acquisition of a 50% interest in Icacos
9th Apr 20188:25 amRNSQ1 Business, Operational and Financial Update
29th Mar 20187:00 amRNSUpdate on La Lora Concession
26th Mar 20187:00 amRNSBusiness Update - La Lora Concession in Spain
19th Mar 20187:00 amRNSRenegotiation of BOLT Transaction
22nd Feb 20187:00 amRNSBusiness update - La Lora Concession in Spain
5th Feb 20187:00 amRNSHolding(s) in Company
18th Jan 20187:00 amRNSHolding(s) in Company
17th Jan 20189:00 amRNSPrice Monitoring Extension
12th Jan 20187:00 amRNSHolding(s) in Company
27th Dec 20177:00 amRNSHolding(s) in Company
21st Dec 20177:00 amRNSOperational, Financial and Management Update
8th Nov 20174:26 pmRNSIssue of Equity and TVR
2nd Nov 20177:00 amRNSResult of Open Offer and Total Voting Rights
16th Oct 20177:00 amRNSHolding(s) in Company
16th Oct 20177:00 amRNSPosting of Open Offer Circular
10th Oct 20177:00 amRNSIssue of Equity and TVR
9th Oct 20177:00 amRNSPlacing, Subscription and Open Offer
29th Sep 20175:42 pmRNSTotal Voting Rights
19th Sep 20177:00 amRNSIssue of Equity and TVR
14th Sep 20172:10 pmRNSResult of AGM
13th Sep 20177:00 amRNSInterim Results for 6 months ended 30 June 2017
12th Sep 20177:00 amRNSGoudron Water Injection Pilot "A" - CEC issued
11th Sep 20177:00 amRNSRe-negotiation of Convertible Security Funding
1st Aug 20177:00 amRNSBoard Change, Notice of AGM and of Interim Results
10th Jul 20177:00 amRNSOperational and Business Update
15th Jun 20177:01 amRNSCompany Update
15th Jun 20177:00 amRNSDirectorate Change, Appointment of CFO
14th Jun 20174:54 pmRNSUpdate on Columbus Energy Resources plc
13th Jun 201712:34 pmRNSChange of name to Columbus Energy Resources plc
8th Jun 20172:45 pmRNSColumbus Energy Resources Launch Event
10th May 20177:00 amRNSDirectorate change, proposed company name change
5th May 20177:00 amRNSAnnual Financial Report
4th May 20177:00 amRNSInvestor Strategy Briefing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.