Goudron Drilling Update

11 Nov 2014 07:00

RNS Number : 6613W
LGO Energy PLC
11 November 2014
 

For Immediate Release, 7 am

11 November 2014

 

 

 

LGO ENERGY PLC

("LGO" or the "Company")

 

Goudron Drilling Update

 

LGO is today pleased to announce that well GY-670, the seventh of its planned 30 new development wells at the Goudron Field in Trinidad, is drilling ahead in the Gros Morne Sandstones at a depth of approximately 2,750 feet measured depth ("MD") after the setting of the planned intermediate 9 5/8-inch casing at 2,394 feet MD. A total of 206 feet of net oil pay were identified on electric logs in the Goudron Sandstone formation.

 

Well GY-670 was originally planned to test the Goudron and Gros Morne Sandstone reservoirs to a total depth ("TD") of at least 3,100 feet TVDss (equivalent to 3,305 feet measured depth ("MD")) however, following further analysis of the recent well, GY-669, it has been decided to deepen the well to drill the entire high pressure Lower Cruse section and to reach the pre-Cruse at a new estimated TD of 4,250 feet MD.

 

Analysis of the sixth new Goudron well, GY-669, which reached a TD of 3,505 feet MD has now been completed. The net pay in the Gros Morne Sandstone and Lower Cruse, which grade into one another with no defined lithological boundary, has been measured as 248 feet. The previous use of the term C-sands to encompass undifferentiated sands between the pre-Mayaro unconformity (the base Goudron Sands) and the pre-Cruse seems to be appropriate to well GY-669 and may be adopted for future simplicity.

 

A minor re-evaluation of the fault configuration following the results of GY-669 has led to the conclusion that the previously planned Goudron Sandstone well, anticipated to be the fourth from Pad 3, is not ideally situated and the drilling of that well may be deferred until 2015. Three wells from Pad 3, all targeting the Gros Morne (C-sands), will be drilled and completed by end 2015.

 

Optimisation of the production from Pad 2 is awaiting approval to recomplete well GY-667 in the more extensive and productive Gros Morne reservoir which was recorded to have 219 feet of net oil pay from electric logging. That approval is now thought to be imminent and recompletion will start immediately that approval is received.

 

Neil Ritson, LGO's Chief Executive, commented:

"The development drilling has continued to produce results in line with or ahead of expectations and GY-670 is progressing to plan and will be deepened to intersect with all likely oil bearing reservoirs. Once GY-670 reaches TD the third and final Gros Morne well on Pad 3, GY-671, will be drilled and then it is expected to complete all three wells as producers by end year. This will lead to a further significant increase in production as we go into 2015."

 

A summary of the drilling program results to date is given in the Appendix below.

 

Competent Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for LGO Energy Plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

Enquiries:

LGO Energy plc

Neil Ritson

+44 (0)20 7440 0645

 

Beaumont Cornish Limited

Nomad and Joint Broker

Rosalind Hill Abrahams

Roland Cornish

+44(0) 20 7628 3396

 

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

+44(0) 20 7493 8188

 

Pelham Bell Pottinger

Financial PR

 +44 (0) 20 3772 2500

Henry Lerwill

 

 

Appendix:

Well

Name

Spud

Date

Total Depth

(MD feet)

Date Total Depth Reached

Goudron

Net Oil Pay

(feet)

Gros Morne

Net Oil Pay

(feet)

Lower Cruse Net Oil Pay

(feet)

1

GY-664

28 April

4212

13 May

192

300

79

2

GY-665

27 May

2750

8 June

195

256

np

3

GY-666

16 June

3357

1 July

185

209

28

4

GY-667

10 July

4006

30 July

187

219

28

5

GY-668

9 August

3026

27 August

191

254

np

6

GY-669

5 October

3505

24 October

229

248

**

7

GY-670

28 October

206

na

na

All depths are quoted as measured depth in feet below Kelly bushing

** = undifferentiated from Gros Morne

na = not yet available

np = not penetrated

 

Glossary:

Pay: A reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay.

MD: Measured Depth

psi: pounds per square inch

TD: Total Depth

TVDss: True Vertical Depth sub sea

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDMMMMZGDGDZZ
Date   Source Headline
10th Oct 20147:00 amRNSGoudron Update, Trinidad
2nd Oct 20147:00 amRNSDrilling Update,Trinidad
29th Sep 201410:00 amRNSGoudron Field Update
26th Sep 20144:27 pmRNSUnaudited Interim Results to 30 June 2014
25th Sep 20141:00 pmRNSRecord Oil Production and Well Update
17th Sep 20147:00 amRNSInitial Flow Rate GY-665
8th Sep 20147:00 amRNSPresentation at Proactive Investor Forum
1st Sep 20147:00 amRNSGoudron Drilling Update, GY-668
27th Aug 20147:00 amRNSBoard Changes
21st Aug 20147:00 amRNSGoudron Drilling Update, GY-668
11th Aug 20147:00 amRNSDrilling Report
7th Aug 20147:00 amRNSDirectorate Change
4th Aug 20147:34 amRNSGoudron Drilling Update
31st Jul 201411:56 amRNSTotal Voting Rights
31st Jul 20149:02 amRNSGoudron Well GY-667 Reaches Total Depth
31st Jul 20147:00 amRNSSettlement of Litigation Costs
22nd Jul 20147:00 amRNSGoudron Drilling Update
17th Jul 20147:00 amRNSLGO raises £7 million
16th Jul 20147:00 amRNSPotential Acquisition of Producing Oil Field
11th Jul 20147:00 amRNSGoudron Drilling and Infrastructure Update
7th Jul 20146:18 pmRNSExercise of Warrants and Total Voting Rights
7th Jul 20142:32 pmRNSResult of AGM
3rd Jul 20147:00 amRNSGoudron Well GY-666 Reaches Total Depth
30th Jun 20142:33 pmRNSTotal Voting Rights
24th Jun 20147:11 amRNSGoudron Drilling Update
19th Jun 20145:10 pmRNSAnnual Financial Report - Replacement
17th Jun 20146:20 pmRNSExercise of Warrants and Total Voting Rights
17th Jun 20147:00 amRNSGoudron Development Drilling Update
13th Jun 20144:38 pmRNSAnnual Financial Report
11th Jun 201412:42 pmRNSGoudron Drilling Update
9th Jun 20147:00 amRNSGoudron Drilling Update
4th Jun 20149:34 amRNSTalks on potential partnership in Spain terminated
3rd Jun 20143:03 pmRNSLGO Fully Closes YAGM Equity Swap
3rd Jun 201411:47 amRNSGY-665 Drilling Update
2nd Jun 201411:28 amRNSTotal Voting Rights
2nd Jun 20147:00 amRNSGY-664 Production and GY-665 Update
28th May 20147:00 amRNSGoudron Drilling Update
27th May 20148:30 amRNSReserves Clarification, Trinidad
27th May 20147:00 amRNSGoudron Update
19th May 20147:00 amRNSGoudron Development Update, Trinidad
14th May 20147:00 amRNSWell GY-664 Update, Trinidad
12th May 20147:00 amRNSProduction and Drilling Update, Trinidad
6th May 20147:01 amRNSUpdate on GY-664 Goudron, Trinidad
1st May 20147:00 amRNSDrilling Report
28th Apr 20149:31 amRNSGoudron Drilling
25th Apr 20146:19 pmRNSFunding and New Trinidad producing fields review
24th Apr 20149:00 amRNSCompany Update
17th Apr 20147:00 amRNSRig Mobilisation, Goudron Field, Trinidad
10th Apr 201412:11 pmRNSUpdate Maxim Joint Venture in Trinidad
3rd Apr 201411:48 amRNSLitigation Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.