Operational Update

9 May 2018 07:00

RNS Number : 4206N
Caspian Sunrise plc
09 May 2018
Β 

Caspian Sunrise PLC

("Caspian Sunrise" or the "Company")

Β 

Operational update

Β 

Introduction

Β 

Caspian Sunrise the Central Asian oil and gas company, with a focus on Kazakhstan, is pleased to update the market with news at the BNG Contract Area of progress at its Deep and Shallow Wells.

Β 

Deep Wells

Β 

As previously reported we got off to a slow start in January and February following a prolonged period of exceptionally cold weather when little meaningful work was possible on our deep wells, A5, 801 and A6.

Β 

Deep Well A5

Β 

This well had been on a 90-day flow test at the end of Q4 2017 with flow rates reaching 3,800 bopd using a 16mm choke. Blockages in the well led us to reduce the choke size to 6mm and flow rates fell to some 1,000 bopd.

Β 

To maximise the results of the flow test and supply the best information on which to calculate reserves we decided to suspend the flow test and clean out the well.

Β 

The cheapest and potentially quickest way to accomplish this was by use of coil tubing equipment. However, after considerable time and effort was expended we decided coil tubing was unlikely to produce the outcome desired. Accordingly, the coil tubing operation has been discontinued.

Β 

A rig has been mobilised to remove the entire tubing string from the well. This is a more expensive but more certain solution but one that would have been difficult to use earlier in the year in the extreme low temperatures.

Β 

Pressure in the well remains high at 300 bar at the wellhead, which suggests there is still good communication throughout the length of the well.

Β 

Our expectation is that, if successful, the well could be flowing and be ready to be put back on a new 90-day test.

Β 

Deep Well 801

Β 

As previously announced our plan to bring Deep Well 801 into production was by drilling a side track of between 450 - 500 meters from a starting depth of 4,501 meters. After weather delays and initial difficulties in drilling through the metal pipes and casing the recent progress of the side track has been encouraging.

Β 

To date we have drilled 132 meters of the total but expect to increase significantly the pace of drilling such that we would reach total depth in Q2 2018, following which this well would also be ready for a 90-day flow test.

Β 

As with well A5 the pressure in Well 801 remain high.

Β 

Deep Well A6

Β 

Our plan with Deep well A6 remains to re-perforate the well using more powerful explosive charges.

Β 

The drill pipes to be used in this operation are currently in use at Deep Well 801 and work at Deep well A6 will not commence until the pipes at Deep Well 801 are released.

Β 

Shallow wells

Β 

MJF

Β 

We continue to produce from 4 of the six wells drilled at the MJF structure. The aggregate production from wells 141, 143, 144 & 145 has over the past three months averaged 1,900 bopd.

Β 

The issue at wells 142 and 146 is the proportion of water produced with the oil. We intend to engage a leading international contractor to isolate the water from both wells so that they might each produce at the rate of some 200 bopd.

Β 

The Company's management consider the probability of success at Well 142 high as it has already demonstrated that it is capable of sustained production at economic rates.

Β 

Soviet Era wells

Β 

As previously reported, in July 2017 well 54 was successfully re- completed.

Β 

The previous average daily oil production from sandstone of the middle Jurassic was some 90 bopd. In addition wells 805, 806 & 807 also had a combined production rate of 110 bopd form the same Jurassic sandstone intervals.

Β 

Examination of the core and logs from these wells indicates that although individual production zones are relatively thin at c 5 meters, the potential for multiple pay intervals, high reservoir quality and high oil saturation makes these potentially good reservoirs to consider for exploration by horizontal drilling.

Β 

In additional to the known Jurassic sandstone reservoirs additional prospectivity exists with a thin (10 meter) but laterally extensive dolomite interval within the late Jurassic sandstone section.

Β 

A pilot study to test the viability of horizontal drill programme to produce from these intervals is planned to begin in 2019.

Β 

Move to full production licence

Β 

As previously announced we are able from 1 July 2018 to apply to move individual structures to a full production licence under which we would expect to double the price achieved per barrel for oil produced.

Β 

The MJF structure will be the first of the BNG structures to apply for full production status. Recent changes to Kazakh regulations have abolished the bonus payment typically made to the state on such a move, which is likely to save some $6 million.

Β 

Comment

Β 

Clive Carver, Chairman said:

Β 

"Progress in Q1 2018 was slow, partly through weather related delays and partly through equipment failures. Encouragingly progress in Q2 has picked up so that we have expectations of the blockages currently in Deep Wells A5 and 801 being cleared to allow 90-day flow tests to resume later in Q2.

Β 

Production at our shallow wells continues to fund the bulk of our day to day work at BNG where the price derived per barrel is set to double from Q3 2018."

Β 

Ends

Β 

Caspian Sunrise PLC

Β 

Clive Carver

Executive Chairman

+7 727 375 0202

Β 

Β 

WH Ireland, Nominated Adviser & Broker

Β 

James Joyce

Jessica Cave

James Sinclair-Ford

Β 

+44 (0) 207 220 1666

Yellow Jersey PR

Tim Thompson

Henry Wilkinson

Β 

+44 (0) 203 735 8825

Β 

Qualified Person

Β 

Mr. NurlybekOspanov, Caspian Sunrise PLC's Chief Geologist / Technical Director who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

Β 

This announcement has been posted to:

www.caspiansunrise.com/investors

Β 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

Β 

Β 

Β 

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
UPDZMGGKVRFGRZM
Date   Source Headline
1st Dec 202011:05 amRNSSecond Price Monitoring Extn
1st Dec 202011:00 amRNSPrice Monitoring Extension
1st Dec 20207:00 amRNSOperational, financial & regulatory updates
19th Oct 20207:00 amRNSCompletion - acquisition of the Caspian Explorer
12th Oct 20207:47 amRNSOperational update & shareholder questions
18th Sep 20204:41 pmRNSSecond Price Monitoring Extn
18th Sep 20204:35 pmRNSPrice Monitoring Extension
18th Sep 20209:05 amRNSSecond Price Monitoring Extn
18th Sep 20209:00 amRNSPrice Monitoring Extension
18th Sep 20207:00 amRNSInterim Results
21st Aug 20209:59 amRNSAppointment of Director
6th Aug 20207:00 amRNSPlacing to Raise £1 million
29th Jul 202011:50 amRNSAGM Voting
15th Jul 20207:00 amRNSCaspian Explorer & AGM Updates
14th Jul 20205:02 pmRNSDirectors Dealings and Salary & Fee Sacrifices
8th Jul 202010:57 amRNSDirectors Dealings and Salary & Fee Sacrifices
26th Jun 20203:25 pmRNSNotice of AGM
25th Jun 20207:00 amRNSAnnual Report and Financial Statements
14th May 202010:50 amRNSAmended: BNG April 2020 production numbers
14th May 202010:10 amRNSBNG April 2020 Production Numbers
4th May 20207:00 amRNSOperational and Financial Update
27th Apr 20207:00 amRNSBNG Operational Update
6th Apr 20207:00 amRNSBNG Operational Update & March Production Numbers
30th Mar 20207:00 amRNSBNG Operational Update & Increase in Production
18th Mar 20208:34 amRNSOperational Update
11th Mar 202010:08 amRNSFebruary 2020 Production & Operational Summary
9th Mar 20202:05 pmRNSSecond Price Monitoring Extn
9th Mar 20202:01 pmRNSPrice Monitoring Extension
9th Mar 20209:06 amRNSSecond Price Monitoring Extn
9th Mar 20209:00 amRNSPrice Monitoring Extension
13th Feb 202012:56 pmRNSResult of General Meeting
10th Feb 20209:05 amRNSSecond Price Monitoring Extn
10th Feb 20209:00 amRNSPrice Monitoring Extension
10th Feb 20207:00 amRNSBNG Update and January 2020 Production
21st Jan 202010:25 amRNSAcquisition of the Caspian Explorer
8th Jan 202012:02 pmRNSBNG Update and December Production
2nd Jan 20202:00 pmRNSPrice Monitoring Extension
2nd Jan 202011:05 amRNSSecond Price Monitoring Extn
2nd Jan 202011:00 amRNSPrice Monitoring Extension
2nd Jan 20209:05 amRNSSecond Price Monitoring Extn
2nd Jan 20209:00 amRNSPrice Monitoring Extension
2nd Jan 20207:00 amRNSBNG Success at Deep Well A5
10th Dec 20197:00 amRNSBNG Operational Update & Production Numbers
27th Nov 20191:00 pmRNSOperational Update
19th Nov 20194:35 pmRNSPrice Monitoring Extension
19th Nov 20192:05 pmRNSSecond Price Monitoring Extn
19th Nov 20192:00 pmRNSPrice Monitoring Extension
6th Nov 20199:04 amRNSOperational Update and BNG production numbers
7th Oct 20197:00 amRNSBNG Monthly Production Numbers
30th Sep 20199:03 amRNSBNG Operational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.