Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

Share Price is delayed by 15 minutes
Get Live Data
2.10    0.00 (0.00%)
Bid:
2.00
Ask:
2.20
Spread: 0.20 (10.00%)
Market Cap: £49.48m
CASP Live PriceLast checked at - London Stock Exchange

Intraday Caspian Sunrise Share Chart

Operational Update

15 Nov 2010 07:00

RNS Number : 1246W
Roxi Petroleum Plc
15 November 2010
 



For immediate release 15 November 2010

 

Roxi Petroleum plc

 

Operational Update

 

Roxi Petroleum plc ("Roxi" or the "Company")(ticker: RXP) is the Central Asian oil and gas company with a focus on Kazakhstan.

 

BNG (Roxi Interest 23.41%)

Well 806

The Company has completed testing the first of two test intervals in well 806, drilled in August-September 2010 to appraise the Middle Jurassic and Lower Cretaceous accumulations. Good quality Jurassic sands were perforated over an interval of 2255-2260m (measured depth). After perforating the well did not flow naturally, however after swabbing, an inflow of 40m3 of formation water was recorded, confirming the interpretation of an immovable residual oil column in the reservoir. 

Testing the Lower Cretaceous. Dolomites in well 806 is now planned for January/February 2011, and will be commenced following delivery of a pump (originally procured in August under new procurement and tender regulations) to fully evaluate the interval. The same stratigraphic horizon was tested in August with intermittent oil flow in well 805. Swabbing the well confirmed the potential for commercial flow on pump. If the Lower Cretaceous test on 806 confirms commercial production rates BNG will apply to have these reserves added to the South Yelemes C1 Reserves for Pilot Production .

SNGS ZJ40 rig has been moved to the 135 well pad, and is currently being winterised and upgraded, including the installation of a third pump and new Shale Shakers. Exploration well 135 is planned to drill to a total depth of 2950m (drilled depth) in 42 days, and is targeting 4 way dip closure in stacked reservoirs in the Lower Cretaceous Dolomite and Middle Jurassic sandstones. The well is also planned to penetrate the top of the Triassic interval.

Following recent successful meeting of the "Central Exploration and Development Committee", application for Pilot Production consent will move to the "State Geological Committee" for the next stage of approval. BNG still anticipates receiving Pilot Production consent from the Ministry of Oil and Gas before the year end. However, following recent changes in the procedure for Emissions Permitting, full Pilot Production of South Yelemes is now expected to start during the second half of 2011. Despite this, the initial oil sales are expected to start in January, with oil from the 90 day testing of well 805, covered by separate applications and emissions permits.

Galaz (Roxi Interest 34.22%)

Roxi remains optimistic that drilling activity will recommence on the Galaz contract area before the end of the calendar year, once the LGI purchase of 40% of "Galaz and Company LLP" has been concluded, as well as placing the existing wells onto production on receipt of the Pilot Production Approval from the authorities.

Commenting on the announcement, David Wilkes, CEO of Roxi, said:

" Although this is a disappointing result from the testing of the middle Jurassic reservoirs of well 806, we remain optimistic that the South Yelemes field will move to pilot production in 2011 based on the preliminary results from the existing wells already drilled on the field. Our focus will now shift to North Yelemes and some of the deeper prospects that we are identifying from the recent 3D seismic work undertaken."

 

 

Qualified Person

 

Duncan McDougall, consultant to the Company and a Fellow in the Geological Society, London, has reviewed and approved the technical disclosure in this announcement. He holds a BSc in Geology and has 25 years international experience of exploration, appraisal, and development of oilfields in a variety of environments

 

Enquiries

 

Roxi Petroleum plc

David Wilkes, Chief Executive Officer +7 727 244 0920

 

Matrix Corporate Capital LLP (NOMAD and broker)

Louis Castro / Alastair Stratton +44 (0) 203 206 7000

 

Buchanan Communications (Financial PR)

Tim Thompson / Ben Romney / Chris McMahon +44 (0) 207 466 5000

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBLBDBLGBBGGD
Date   Source Headline
1st Dec 202011:05 amRNSSecond Price Monitoring Extn
1st Dec 202011:00 amRNSPrice Monitoring Extension
1st Dec 20207:00 amRNSOperational, financial & regulatory updates
19th Oct 20207:00 amRNSCompletion - acquisition of the Caspian Explorer
12th Oct 20207:47 amRNSOperational update & shareholder questions
18th Sep 20204:41 pmRNSSecond Price Monitoring Extn
18th Sep 20204:35 pmRNSPrice Monitoring Extension
18th Sep 20209:05 amRNSSecond Price Monitoring Extn
18th Sep 20209:00 amRNSPrice Monitoring Extension
18th Sep 20207:00 amRNSInterim Results
21st Aug 20209:59 amRNSAppointment of Director
6th Aug 20207:00 amRNSPlacing to Raise £1 million
29th Jul 202011:50 amRNSAGM Voting
15th Jul 20207:00 amRNSCaspian Explorer & AGM Updates
14th Jul 20205:02 pmRNSDirectors Dealings and Salary & Fee Sacrifices
8th Jul 202010:57 amRNSDirectors Dealings and Salary & Fee Sacrifices
26th Jun 20203:25 pmRNSNotice of AGM
25th Jun 20207:00 amRNSAnnual Report and Financial Statements
14th May 202010:50 amRNSAmended: BNG April 2020 production numbers
14th May 202010:10 amRNSBNG April 2020 Production Numbers
4th May 20207:00 amRNSOperational and Financial Update
27th Apr 20207:00 amRNSBNG Operational Update
6th Apr 20207:00 amRNSBNG Operational Update & March Production Numbers
30th Mar 20207:00 amRNSBNG Operational Update & Increase in Production
18th Mar 20208:34 amRNSOperational Update
11th Mar 202010:08 amRNSFebruary 2020 Production & Operational Summary
9th Mar 20202:05 pmRNSSecond Price Monitoring Extn
9th Mar 20202:01 pmRNSPrice Monitoring Extension
9th Mar 20209:06 amRNSSecond Price Monitoring Extn
9th Mar 20209:00 amRNSPrice Monitoring Extension
13th Feb 202012:56 pmRNSResult of General Meeting
10th Feb 20209:05 amRNSSecond Price Monitoring Extn
10th Feb 20209:00 amRNSPrice Monitoring Extension
10th Feb 20207:00 amRNSBNG Update and January 2020 Production
21st Jan 202010:25 amRNSAcquisition of the Caspian Explorer
8th Jan 202012:02 pmRNSBNG Update and December Production
2nd Jan 20202:00 pmRNSPrice Monitoring Extension
2nd Jan 202011:05 amRNSSecond Price Monitoring Extn
2nd Jan 202011:00 amRNSPrice Monitoring Extension
2nd Jan 20209:05 amRNSSecond Price Monitoring Extn
2nd Jan 20209:00 amRNSPrice Monitoring Extension
2nd Jan 20207:00 amRNSBNG Success at Deep Well A5
10th Dec 20197:00 amRNSBNG Operational Update & Production Numbers
27th Nov 20191:00 pmRNSOperational Update
19th Nov 20194:35 pmRNSPrice Monitoring Extension
19th Nov 20192:05 pmRNSSecond Price Monitoring Extn
19th Nov 20192:00 pmRNSPrice Monitoring Extension
6th Nov 20199:04 amRNSOperational Update and BNG production numbers
7th Oct 20197:00 amRNSBNG Monthly Production Numbers
30th Sep 20199:03 amRNSBNG Operational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.