Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

Share Price is delayed by 15 minutes
Get Live Data
2.10    0.00 (0.00%)
Bid:
2.00
Ask:
2.20
Spread: 0.20 (10.00%)
Market Cap: £49.48m
CASP Live PriceLast checked at - London Stock Exchange

Intraday Caspian Sunrise Share Chart

Operational Update

15 Dec 2014 11:18

RNS Number : 7615Z
Roxi Petroleum Plc
15 December 2014
 



 

Roxi Petroleum PLC

 

("Roxi" or the "Company")

 

Operational Update

 

Roxi, the Central Asian oil and gas company with a focus on Kazakhstan, is pleased to further update the market with news of progress at its BNG asset.

 

BNG

 

Background 

 

The BNG Contract Area is located in the west of Kazakhstan 40 kilometers southeast of Tengiz on the edge of the Mangistau Oblast, covering an area of 1,561 square kilometers of which 1,376 square kilometers has 3D seismic coverage acquired in 2009 and 2010. 

 

Roxi has a 58.41 per cent interest in the BNG Contract Area.

 

Deep Well 801

 

Roxi is pleased to confirm that Deep Well 801 has been spudded as planned.

 

The well is to be drilled to a total depth of 4,700 meters targeting the Lower Carboniferous. The well is expected to reach Total Depth by mid April 2015. The well is being drilled on a turnkey basis by Sinopec, the Chinese multinational, at a fixed cost of $11 million.

 

Deep Well 801 is located approximately 8 kilometres from Deep Well A5 and will be targeting the same structure as Deep Well A5 in the Lower Carboniferous.

 

Deep Well A5

 

Well Status update

 

As previously announced the well was drilled to a total depth of 4,442 meters. Casing was set to a depth of 4,077 meters and the core sampling revealed the existence of a gross oil-bearing interval of at least 105 meters from 4,332 meters to at least 4,437 meters.

 

Also as previously announced due to the high pressure in the well, the coil tubing equipment has become stuck at a depth of 2,996 meters. This has delayed the commencement of the 30-day flow test.

 

Current position

 

Work continues to remove the excess drilling fluids and stuck core-tubing equipment. Encouragingly, despite the blocked well,oil continues to flow to the surface under its own pressure.

 

It remains the position that we expect to defer commencement of the 30-day well test until February 2015.

 

 

 

Comment:

 

Clive Carver, Chairman said

 

"It is always exciting to spud a new well, particularly a deep well. We look forward to working with Sinopec on this drill.

 

As regards Deep Well A5 our plan is to work in a cost effective manner using the simpler and cheaper techniques available to us to clean up the well for testing rather than moving directly to the more expensive and time-consuming procedures. We will continue to update the market with progress as it occurs."

 

 

 

Enquiries:

 

Roxi Petroleum PLC Clive Carver, Chairman

+7 727 375 0202

 

WH Ireland Ltd James Joyce / James Bavister

+44 (0) 207 220 1666

 

 

Qualified Person

 

Mr. Nurlybek Ospanov, Roxi's senior geologist who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBBBDDRBBBGSU
Date   Source Headline
9th Nov 20158:27 amRNSUpdate on Operations at BNG
3rd Nov 20157:00 amRNSUpdate on Operations at BNG
7th Oct 20159:40 amRNSDirector/PDMR Shareholding
6th Oct 20153:47 pmRNSExercise of Options
29th Sep 20153:59 pmRNSExercise of Options
29th Sep 20157:01 amRNSOperational Update
29th Sep 20157:00 amRNSInterim Results
4th Sep 20157:00 amRNSUpdate on operations at BNG
24th Jul 20153:53 pmRNSResults of AGM
24th Jul 20157:00 amRNSCancellation of Royalty
15th Jul 20157:00 amRNSUpdate on operations at BNG
3rd Jul 20157:00 amRNSExercise of Options
30th Jun 20157:00 amRNSOperational Update
26th Jun 201512:51 pmRNSPosting of Accounts and Notice of AGM
25th Jun 20157:01 amRNSExercise of Options
25th Jun 20157:00 amRNSThree year BNG Licence extension granted
23rd Jun 20157:00 amRNSFinal Results
19th Jun 20157:00 amRNSUpdate on the sale of Galaz
12th Jun 201511:05 amRNSUpdate on the sale of Galaz
1st Jun 20157:00 amRNSOperational Update
20th May 20151:30 pmRNSUpdate on the sale of Galaz
8th May 20157:34 amRNSExercise of Options
6th May 20157:02 amRNSExercise of Options
1st May 20157:00 amRNSUpdate on operations at BNG
30th Apr 20157:00 amRNSExtension to the completion date of the Galaz sale
17th Apr 20157:00 amRNSUSD20 million subscription
1st Apr 20159:30 amRNSDirector/PDMR Shareholding
1st Apr 20157:00 amRNSUpdate on operations at BNG, the sale of Galaz
24th Mar 20157:00 amRNSExercise of Options
12th Mar 201511:24 amRNSUpdate re Admission of New Shares
9th Mar 20157:00 amRNSOperational Update
24th Feb 20154:00 pmRNSUpdate re Admission of New Shares
19th Feb 20157:00 amRNSIssue of equity
13th Feb 20157:00 amRNSOperational Update
10th Feb 20151:29 pmRNSSale of interest in the Galaz Contract Area
2nd Feb 20157:00 amRNSProposed Sale of the Galaz Contract Area
23rd Jan 20158:11 amRNSDirector/PDMR Shareholding
20th Jan 20157:00 amRNSDrawdown on facility
8th Jan 20157:00 amRNSProposed Sale of the Galaz Contract Area
15th Dec 201411:18 amRNSOperational Update
1st Dec 20147:00 amRNSOperational Update
7th Nov 20147:00 amRNSOperational Update
15th Oct 20147:00 amRNSOperational Update
25th Sep 201410:12 amRNSAward of Options
23rd Sep 20147:00 amRNSInterim Results
8th Sep 20147:00 amRNSOperational Update
1st Sep 20147:00 amRNSFurther update on the Deep Discovery at BNG
27th Aug 201411:55 amRNSExercise of Options
19th Aug 20147:00 amRNSDeep Well Update
11th Aug 20147:01 amRNSExercise of options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.