Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

Share Price is delayed by 15 minutes
Get Live Data
2.10    0.00 (0.00%)
Bid:
2.00
Ask:
2.20
Spread: 0.20 (10.00%)
Market Cap: £49.48m
CASP Live PriceLast checked at - London Stock Exchange

Intraday Caspian Sunrise Share Chart

Operational Update

15 Dec 2014 11:18

RNS Number : 7615Z
Roxi Petroleum Plc
15 December 2014
 



 

Roxi Petroleum PLC

 

("Roxi" or the "Company")

 

Operational Update

 

Roxi, the Central Asian oil and gas company with a focus on Kazakhstan, is pleased to further update the market with news of progress at its BNG asset.

 

BNG

 

Background 

 

The BNG Contract Area is located in the west of Kazakhstan 40 kilometers southeast of Tengiz on the edge of the Mangistau Oblast, covering an area of 1,561 square kilometers of which 1,376 square kilometers has 3D seismic coverage acquired in 2009 and 2010. 

 

Roxi has a 58.41 per cent interest in the BNG Contract Area.

 

Deep Well 801

 

Roxi is pleased to confirm that Deep Well 801 has been spudded as planned.

 

The well is to be drilled to a total depth of 4,700 meters targeting the Lower Carboniferous. The well is expected to reach Total Depth by mid April 2015. The well is being drilled on a turnkey basis by Sinopec, the Chinese multinational, at a fixed cost of $11 million.

 

Deep Well 801 is located approximately 8 kilometres from Deep Well A5 and will be targeting the same structure as Deep Well A5 in the Lower Carboniferous.

 

Deep Well A5

 

Well Status update

 

As previously announced the well was drilled to a total depth of 4,442 meters. Casing was set to a depth of 4,077 meters and the core sampling revealed the existence of a gross oil-bearing interval of at least 105 meters from 4,332 meters to at least 4,437 meters.

 

Also as previously announced due to the high pressure in the well, the coil tubing equipment has become stuck at a depth of 2,996 meters. This has delayed the commencement of the 30-day flow test.

 

Current position

 

Work continues to remove the excess drilling fluids and stuck core-tubing equipment. Encouragingly, despite the blocked well,oil continues to flow to the surface under its own pressure.

 

It remains the position that we expect to defer commencement of the 30-day well test until February 2015.

 

 

 

Comment:

 

Clive Carver, Chairman said

 

"It is always exciting to spud a new well, particularly a deep well. We look forward to working with Sinopec on this drill.

 

As regards Deep Well A5 our plan is to work in a cost effective manner using the simpler and cheaper techniques available to us to clean up the well for testing rather than moving directly to the more expensive and time-consuming procedures. We will continue to update the market with progress as it occurs."

 

 

 

Enquiries:

 

Roxi Petroleum PLC Clive Carver, Chairman

+7 727 375 0202

 

WH Ireland Ltd James Joyce / James Bavister

+44 (0) 207 220 1666

 

 

Qualified Person

 

Mr. Nurlybek Ospanov, Roxi's senior geologist who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBBBDDRBBBGSU
Date   Source Headline
8th Nov 20177:00 amRNSInvestor Evening
27th Oct 20177:00 amRNSBNG Contract Area Early Licence Renewal
23rd Oct 20177:00 amRNSBNG Operational Update
2nd Oct 20177:00 amRNSOperational Update
20th Sep 20177:00 amRNSInterim Results
30th Aug 201711:32 amRNSShareholding Update
8th Aug 20177:00 amRNSBNG Operational Update
4th Aug 20174:12 pmRNSShareholding Update
3rd Jul 20177:00 amRNSOperational Update
13th Jun 20172:15 pmRNSResult of AGM
1st Jun 20179:27 amRNSNotification of Major Interest in Shares
1st Jun 20177:00 amRNSCompletion of the Baverstock Merger
26th May 20177:00 amRNSBaverstock Merger Completion
15th May 20177:00 amRNSFinal Results
12th May 20171:13 pmRNSFinal Approval Received for Baverstock Merger
10th May 201710:27 amRNSOperational Update - Spudding of Well 144
8th May 20177:00 amRNSBNG Operational Merger / Baverstock Merger Update
6th Apr 20177:00 amRNSBNG Operational Update
28th Mar 20172:19 pmRNSChange of Name and Launch of New Website
24th Mar 20171:15 pmRNSGeneral Meeting Results
27th Feb 20177:00 amRNSProposed Merger and Notice of General Meeting
17th Jan 20177:00 amRNSBNG Operational Update
12th Jan 20179:52 amRNSDirector/PDMR Shareholding
10th Jan 20177:00 amRNSBNG Operational Update
28th Oct 20167:00 amRNSOperational Update
19th Oct 20168:43 amRNSReplacement: Operational Update
19th Oct 20167:00 amRNSOperational Update
28th Sep 20167:00 amRNSInterim Results
5th Sep 20167:00 amRNSHoldings in Company
2nd Sep 20167:00 amRNSReserve Update
16th Aug 20167:00 amRNSSpudding Shallow Well 141
5th Jul 20168:44 amRNSDirector/PDMR Shareholding
29th Jun 20164:07 pmRNSResult of AGM
29th Jun 20167:00 amRNSAGM Statement
14th Jun 20169:06 amRNSDirector/PDMR Shareholding
3rd Jun 20167:00 amRNSFinal Results
3rd May 20168:29 amRNSHolding(s) in Company
11th Apr 20167:00 amRNSOperational Update
6th Apr 20164:41 pmRNSReplacement: Exercise of Options
29th Mar 20163:20 pmRNSExercise of Options
29th Feb 20164:02 pmRNSOperational Update
19th Feb 20161:21 pmRNSExercise of Options
11th Feb 201612:25 pmRNSExercise of Options
27th Jan 20167:00 amRNSAppointment of GCA to update technical estimates
21st Jan 201610:23 amRNSExtension to the BNG Contract Area
13th Jan 20167:00 amRNSOperational Update
21st Dec 20158:52 amRNSHolding(s) in Company
4th Dec 20155:45 pmRNSHolding(s) in Company
3rd Dec 20157:00 amRNSUpdate on Operations at BNG
16th Nov 20153:32 pmRNSExercise of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.