The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.45
Bid: 3.30
Ask: 3.60
Change: -0.20 (-5.48%)
Spread: 0.30 (9.091%)
Open: 3.65
High: 3.65
Low: 3.35
Prev. Close: 3.65
CASP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

BNG Operational Update

17 Jan 2017 07:00

RNS Number : 2954U
Roxi Petroleum Plc
17 January 2017
 

Roxi Petroleum Plc

 

Roxi Petroleum plc ("Roxi" or the "Company")

 

BNG Operational update

 

Introduction

 

Roxi, the Central Asian oil and gas company, with a focus on Kazakhstan, is pleased to update the market with news from its BNG Contract Area.

 

Background

 

Roxi has a 58.41% interest in the BNG Contract Area, which is located in the west of Kazakhstan 40 kilometers southeast of Tengiz on the edge of the Mangistau Oblast, covering an area of 1,702 square kilometres.

 

The block has both shallow and deep areas of interest.

 

MJF structure

 

The MJF structure is to date the most promising of the shallow areas of interest at BNG on which three wells with depths between 2,480 and 2,750 meters have been drilled at costs of less than $2 million per well.

 

Well 142

 

Since our last update, an interval between 2,201 meters and 2,208 meters has been perforated and from which the well is testing at a rates between of 215 and 290 bopd using a 8 mm choke.

 

As previously announced Well 142 is a material step out well, located 1.8 km to the north east of well 143 and therefore it has potential to confirm a significantly larger scale for the MJF structure.

 

Importantly, the interval perforated is in the same horizon as those producing at wells 141 and 143. We therefore believe the structure at MJF extends to an area of approximately 10 km2.

 

The two wells previously drilled and testing on the MJF structure, 143 and 141, are respectively producing at the rates of 479 bopd and 631 bopd using 6 mm and 7 mm chokes. Aggregate gross production from the MJF is therefore up to approximately 1,400 bopd. In total production from BNG, is now up to approximately 1,567 bopd.

 

The price at which we are able to sell our oil under the provisions of our licence has also increased (compared to the low point of some $10 per barrel) by some 60% to approximately $16 per barrel. Income from oil sales is being used to fund the drilling and testing programme at BNG.

 

 Well 808

 

Roxi is also pleased to announce the spudding of well 808, a shallow well on a potentially new structure North of the South Yelemes portion of the BNG Contract area, on which wells 805, 806 & 807 have already been drilled and are producing. The new well is expected to take 2 months to drill.

 

The well is planned for a total depth of 2,750 meters targeting Cretacious, Jurassic and possibly Triassic horizons. The cost of the well is expected to be $2.5 million.

 

Bavistock Merger

 

Further to interim results announcement on 28 September 2016, the Company is pleased to confirm that it expects to post a circular to shareholders in connection with the proposed merger with Baverstock in the coming weeks.

 

Clive Carver, Executive Chairman said

 

"These results from 142 and previously from 141 are exactly as the Company had hoped for. At an appropriate juncture these results will be passed onto Gaffney Cline so that they may review their reserves estimate attributable to the MJF structure."

 

 

 

Comments:

 

Roxi Petroleum plc +7 727 375 0202

Clive Carver

Executive Chairman

 

 

WH Ireland, Nominated Adviser & Broker +44 (0) 207 220 1666

James Joyce

James Bavister

 

Abchurch +44 (0) 2017 398 7700

Tim Thompson / George Robinson / Rebecca Clube

 

Qualified Person

Mr. Nurlybek Ospanov, Roxi's senior geologist who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

This announcement has been posted to: www.roxipetroleum.com/roxi/en/investors.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBFMRTMBABBJR
Date   Source Headline
26th Jun 20203:25 pmRNSNotice of AGM
25th Jun 20207:00 amRNSAnnual Report and Financial Statements
14th May 202010:50 amRNSAmended: BNG April 2020 production numbers
14th May 202010:10 amRNSBNG April 2020 Production Numbers
4th May 20207:00 amRNSOperational and Financial Update
27th Apr 20207:00 amRNSBNG Operational Update
6th Apr 20207:00 amRNSBNG Operational Update & March Production Numbers
30th Mar 20207:00 amRNSBNG Operational Update & Increase in Production
18th Mar 20208:34 amRNSOperational Update
11th Mar 202010:08 amRNSFebruary 2020 Production & Operational Summary
9th Mar 20202:05 pmRNSSecond Price Monitoring Extn
9th Mar 20202:01 pmRNSPrice Monitoring Extension
9th Mar 20209:06 amRNSSecond Price Monitoring Extn
9th Mar 20209:00 amRNSPrice Monitoring Extension
13th Feb 202012:56 pmRNSResult of General Meeting
10th Feb 20209:05 amRNSSecond Price Monitoring Extn
10th Feb 20209:00 amRNSPrice Monitoring Extension
10th Feb 20207:00 amRNSBNG Update and January 2020 Production
21st Jan 202010:25 amRNSAcquisition of the Caspian Explorer
8th Jan 202012:02 pmRNSBNG Update and December Production
2nd Jan 20202:00 pmRNSPrice Monitoring Extension
2nd Jan 202011:05 amRNSSecond Price Monitoring Extn
2nd Jan 202011:00 amRNSPrice Monitoring Extension
2nd Jan 20209:05 amRNSSecond Price Monitoring Extn
2nd Jan 20209:00 amRNSPrice Monitoring Extension
2nd Jan 20207:00 amRNSBNG Success at Deep Well A5
10th Dec 20197:00 amRNSBNG Operational Update & Production Numbers
27th Nov 20191:00 pmRNSOperational Update
19th Nov 20194:35 pmRNSPrice Monitoring Extension
19th Nov 20192:05 pmRNSSecond Price Monitoring Extn
19th Nov 20192:00 pmRNSPrice Monitoring Extension
6th Nov 20199:04 amRNSOperational Update and BNG production numbers
7th Oct 20197:00 amRNSBNG Monthly Production Numbers
30th Sep 20199:03 amRNSBNG Operational Update
17th Sep 20197:00 amRNSInterim Results
12th Sep 201910:35 amRNSAmendment: BNG Operational Update
12th Sep 20197:41 amRNSBNG Operational Update and Production Numbers
2nd Sep 20197:21 amRNSPurchase of equipment and the issue of shares
21st Aug 20198:39 amRNSBNG Operational Update and Production Numbers
6th Aug 20197:00 amRNSMonthly production numbers
26th Jul 20197:00 amRNSInvestor and Analyst Conference Call
12th Jul 20197:00 amRNSBNG Operational Update
11th Jul 20198:58 amRNSMJF Licence Upgrade Signed
21st Jun 20194:50 pmRNSResult of AGM
21st Jun 20197:00 amRNSMJF Licence Update
19th Jun 20197:00 amRNSBNG Operational Update
7th Jun 20197:00 amRNSBNG Operational Update
5th Jun 201912:08 pmRNSAward of long-term incentives
4th Jun 20197:00 amRNSOperational Update & Production Report
29th May 201910:00 amRNSBNG operational update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.