SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Asia Metals Regulatory News (CAML)

Share Price Information for Central Asia Metals (CAML)

Share Price is delayed by 15 minutes
Get Live Data
140.00    3.80 (2.79%)
Bid:
139.40
Ask:
140.00
Spread: 0.60 (0.43%)
Market Cap: £238.57m
CAML Live PriceLast checked at - London Stock Exchange

Intraday Central Asia Metals Share Chart

Q1 2024 Operations Update

9 Apr 2024 07:00

RNS Number : 7458J
Central Asia Metals PLC
09 April 2024
 

 

09 April 2024

 

CENTRAL ASIA METALS PLC

('CAML' or the 'Company')

Q1 2024 Operations Update

Central Asia Metals plc (AIM: CAML) provides a Q1 2024 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in North Macedonia ('Sasa').

Summary

- Zero lost time injuries ('LTIs') at Kounrad or Sasa

- Kounrad copper production of 3,120 tonnes

- Sasa zinc in concentrate production of 4,741 tonnes

- Sasa lead in concentrate production of 6,529 tonnes

 

Outlook

- Full year 2024 guidance

Copper: 13,000 to 14,000 tonnes

Zinc in concentrate: 19,000 to 21,000 tonnes

Lead in concentrate: 27,000 to 29,000 tonnes

 

CAML production summary

Metal production (tonnes)

Q1 2024

Q1 2023

Copper

3,120

3,336

Zinc

4,741

4,917

Lead

6,529

6,618

Nigel Robinson, Chief Executive Officer, commented:

"We have had a good start to 2024 with no LTIs and a solid first quarter of production at both sites despite some challenging winter weather conditions and the continued construction activity on site at Sasa. We have made significant progress towards the completion of the infrastructure required to transition to paste fill mining and remain on track for completion during H2 2024.

"Once the construction activity has been completed it will enable the site team to focus on the operational management of the transition to paste fill mining and this will facilitate the higher levels of production planned for H2 2024.

"During the quarter, we were pleased to have been able to announce our intention to invest up to £5 million in Scottish copper and nickel explorer, Aberdeen Minerals."

Health and Safety

In Q1 2024, there were no LTIs at either Kounrad or Sasa.

Kounrad

Production and sales update

Kounrad Q1 2024 copper production was 3,120 tonnes and copper sales during Q1 2024 were 2,998 tonnes.

Sasa

Production and sales update

In Q1 2024, mined ore and processed ore were 184,127 tonnes and 184,079 tonnes respectively. The average head grades for the period were 3.00% zinc and 3.75% lead. Q1 2024 metallurgical recoveries were 85.9% for zinc and 94.7% for lead. 

Sasa produces a zinc concentrate and a separate lead concentrate. In Q1 2024, 9,494 tonnes of concentrate containing 49.9% zinc and 9,177 tonnes of concentrate containing 71.1% lead were produced.

Sasa typically receives from smelters approximately 84% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q1 2024 payable production was 3,982 tonnes of zinc and 6,202 tonnes of lead. Payable base metal in concentrate sales for the quarter were 3,840 tonnes of zinc and 6,382 tonnes of lead.

During Q1 2024, Sasa sold 89,933 ounces of payable silver to Osisko Gold Royalties, in accordance with its streaming agreement. 

Units

Q1 2024

Q1 2023

Ore mined

t

184,127

196,503

Plant feed

t

184,079

195,968

Zinc grade

%

3.00

2.95

Zinc recovery

%

85.9

85.2

Lead grade

%

3.75

3.59

Lead recovery

%

94.7

94.2

Zinc concentrate

t (dry)

9,494

9,716

- Grade

%

49.9

50.6

- Contained zinc

t

4,741

4,917

Lead concentrate

t (dry)

9,177

9,282

- Grade

%

71.1

71.3

- Contained lead

t

6,529

6,618

Capital projects - the transition to paste fill mining

During Q1 2024, the Paste Backfill Plant has operated consistently with the ongoing placement of paste fill between the 990 and 910 metre levels. The training of employees for long hole stoping has also been completed.

The construction of the Dry Stack Tailings Plant remains on track with dry commissioning and the initial placement of filter cake on the engineered landform scheduled for H2 2024.

A total of 2,894 metres of the Central Decline have now been developed and connection to the 750 metre level is planned for Q4 2024.

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nigel Robinson

CEO

Gavin Ferrar

CFO

Louise Wrathall

louise.wrathall@centralasiametals.com

Director of Corporate Development

Emma Chetwynd Stapylton

emma.chetwyndstapylton@centralasiametals.com

Investor Relations Manager

 

 

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

 

David McKeown

Georgina Langoulant

 

 

 

BMO Capital Markets (Joint Broker)

Tel: +44 (0) 20 7236 1010

Thomas Rider

 

Pascal Lussier Duquette

 

 

 

BlytheRay (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

 

Megan Ray

 

 

Note to editors:

 

Central Asia Metals, an AIM-listed UK company based in London, owns 100% of the Kounrad SX-EW copper project in central Kazakhstan and 100% of the Sasa zinc-lead mine in North Macedonia. The CAML Exploration subsidiary was recently formed to progress early exploration opportunities in Kazakhstan.

For further information, please visit www.centralasiametals.com and follow CAML on Twitter at @CamlMetals and on LinkedIn at Central Asia Metals Plc

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFLFLRSDITIIS
Date   Source Headline
30th Sep 20255:28 pmRNSTotal Voting Rights
30th Sep 20257:00 amRNSTransaction in Own Shares
29th Sep 20252:14 pmRNSTR-1: Notification of major holdings
23rd Sep 20257:00 amRNSTransaction in Own Shares
22nd Sep 20257:00 amRNSTransaction in Own Shares
19th Sep 20257:00 amRNSTransaction in Own Shares
18th Sep 20257:00 amRNSTransaction in Own Shares
17th Sep 20257:00 amRNSTransaction in Own Shares
16th Sep 20257:00 amRNSTransaction in Own Shares
15th Sep 20257:00 amRNSTransaction in Own Shares
12th Sep 20257:00 amRNSTransaction in Own Shares
11th Sep 20257:00 amRNSTransaction in Own Shares
10th Sep 20257:01 amRNSInitiation of US$10m share buyback programme
10th Sep 20257:00 amRNSInterim Results for six months ended 30 June 2025
21st Aug 20257:00 amRNSNotice of Interim Results
21st Aug 20257:00 amRNSNon-Executive Director Board Changes
21st Jul 20257:00 amRNSUpdate on New World Resources acquisition
17th Jul 20257:24 amRNSCash Offer Price Increase for New World Resources
10th Jul 20257:00 amRNSH1 2025 Operations Update
7th Jul 20257:00 amRNSRevised off-market takeover agreement
30th Jun 20257:00 amRNSExecuted Third Deed of Variation
26th Jun 20259:41 amRNSAfter-market purchase and offer price increase
25th Jun 20254:11 pmRNSTR-1: Notification of major holdings
23rd Jun 20256:20 pmRNSExecuted Second Deed of Variation
20th Jun 202510:05 amRNSCAML on-market purchase and offer price increase
20th Jun 20257:00 amRNSRevised proposal with New World Resources Limited
30th May 20257:30 amRNSGrant of Long-Term Share Awards
27th May 202511:46 amRNSTR-1: Notification of major holdings
23rd May 20254:29 pmRNSTR-1: Notification of major holdings
21st May 20257:00 amRNSProposed acquisition of New World Resources
15th May 20251:00 pmRNSResults of 2025 Annual General Meeting
15th Apr 20259:22 amRNSAnnual Report and Accounts 2024 and Notice of AGM
15th Apr 20257:00 amRNSPublication of 2024 Sustainability Report
9th Apr 20257:00 amRNSDisposal of Copper Bay
8th Apr 20257:00 amRNSQ1 2025 Operations Update
1st Apr 20253:19 pmRNSDirector Shareholdings
20th Mar 20257:00 amRNS2024 Full-Year Results
27th Feb 20257:00 amRNSNotice of Results
20th Feb 202512:30 pmRNSTR-1: Notification of major holdings
9th Jan 20257:00 amRNS2024 Operations Update
9th Oct 20247:00 amRNSQ3 2024 Operations Update
1st Oct 20247:00 amRNSConfirmation of management changes
10th Sep 20247:00 amRNSInterim Results for Six Months Ended 30 June 2024
20th Aug 20247:00 amRNSNotice of Interim Results
11th Jul 20247:00 amRNSH1 2024 Operations Update
4th Jul 20247:00 amRNSSuccession Planning
2nd Jul 20247:00 amRNSCAML achieves conformance with GISTM
3rd Jun 20247:00 amRNSCompletion of Aberdeen Minerals Initial Investment
23rd May 20241:51 pmRNSOption Exercise by Directors
17th May 202410:29 amRNSResults of Annual General Meeting (‘AGM’)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.