Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCabot Energy Regulatory News (CAB)

  • There is currently no data for CAB

Drilling Operations Update

8 Mar 2018 07:00

RNS Number : 0487H
Cabot Energy PLC
08 March 2018
 

Prior to publication, the information contained within this announcement was deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR"). With the publication of this announcement, this information is now considered to be in the public domain.

 

 

Cabot Energy Plc

("Cabot Energy", the "Group" or the "Company")

Drilling operations update

Cabot Energy (AIM: CAB), the AIM quoted oil and gas company focused on production led growth, provides an update on the Company's first quarter winter work programme in Alberta, Canada, which comprises the drilling of four new sidetrack wells.

The work programme is ahead of schedule with three wells successfully drilled and tested and the fourth well scheduled to finish drilling shortly.

 

Summary results table

Sidetrack well

Test rate

(equivalent bopd)

Expected initial production rate

(bopd)

06-08

570

160

15-31

100

100

10-06

626

160

03-07

Currently drilling

 

06-08 sidetrack well

The well targeted a high porosity area within the reef using 3D seismic attribute analysis

Evidence of this high porosity was seen during drilling operations and confirmed by the well test result with an equivalent production rate of 570 bopd

Following completion, the well was put into production and is currently producing at a restricted rate of approximately 160 bopd to best manage the long term performance of the reservoir

15-31 sidetrack well

Following drilling, the well was tested over a short period at an equivalent rate of 100 bopd

During the test the overall fluid production rate was 300 barrels per day and the water cut was continuously reducing

Technical analysis indicated that reef porosity would be less than the other wells in the programme, but would still produce at a significant rate and the result supports that analysis

The well is expected to produce at an initial rate of 100 bopd with a low water cut

10-06 sidetrack well

The original vertical well drilled by the previous operator in 2009 produced little oil from the reef due to completion issues

The new 10-06 sidetrack well drilled 325 metres in the reservoir and tested at an equivalent rate of 626 bopd while still cleaning up

Following completion, the well is expected to be put on production at an initial rate of 160 bopd to manage the long term reservoir performance

03-07 - currently drilling

The 03-07 well has been drilled out of the existing well bore and is currently drilling in the reservoir

It is expected that drilling operations will finish within a week, after which the well will be tested and, if successful, put into production

 

All four wells are tied in via existing pipelines to the Company's 13-36 processing and sales facility. An operations and production update will be provided in April 2018 after the winter work programme completes.

 

Keith Bush, Chief Executive Officer of Cabot Energy, commented:

"The winter work programme is progressing well and each successful sidetrack well supports our technical approach to the redevelopment of the Rainbow region through the use of 3D seismic to identify the properties within each reef and target productive zones. With the completion of the fourth well likely to occur in the coming weeks, the programme will complete ahead of schedule and before the annual spring thaw, which is a credit to our operational team in Canada.

"These sidetrack wells provide excellent data reference points as we look to replicate this success in the summer programme and plan the ongoing development of production and reserves in the region next year."

For further information please contact:

Cabot Energy Plc

+44 (0)20 7469 2900

Keith Bush, Chief Executive Officer

Nick Morgan, Finance Director

SP Angel Corporate Finance LLP

+44 (0)20 3470 0470

Nominated Adviser and Joint Broker

Richard Morrison, Richard Redmayne, Charlie Bouverat

GMP FirstEnergy LLP

+44 (0)20 7448 0200

Joint Broker

Jonathan Wright, David van Erp

FTI Consulting

+44 (0)20 3727 1000 

Financial PR

Edward Westropp

 

In Accordance with AIM Rules - Guidance for Mining and Oil & Gas Companies, the information contained in this announcement has been reviewed and signed off by the CEO of Cabot Energy, Mr Keith Bush, who has 26 years' experience as a petroleum engineer. He has read and approved the technical disclosure in this regulatory announcement. The technical disclosure in this announcement complies with the SPE standard.

 

Note to Editors:

Cabot Energy is an oil and gas company focused on production led growth. The Company is building production from a redevelopment project in north west Alberta, Canada, and has a portfolio of exploration and appraisal opportunities in Italy. Comprehensive information on Cabot Energy and its oil and gas operations, including press releases, annual reports and interim reports are available from Cabot Energy's website: www.cabot-energy.com.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFKODDKBKBBNK
Date   Source Headline
23rd Jul 20072:00 pmPRNOttoland Well Testing - Progress Statement
11th Jul 20077:30 amPRNOttoland Progress Report
11th Jul 20077:02 amPRNHolding(s) in Company
11th Jul 20077:01 amPRNHolding(s) in Company
11th Jul 20077:00 amPRNHolding(s) in Company
3rd Jul 20077:00 amPRNOperations Update
28th Jun 20077:00 amPRNDirector/PDMR Shareholding
27th Jun 200711:09 amPRNResult of AGM
25th Jun 20079:34 amPRNAward of Two Offshore Licences
20th Jun 20077:00 amPRNOttoland Oil Drilling Successful
6th Jun 20077:00 amPRNNotification of Shareholding
31st May 20077:05 amPRNNotice of AGM
31st May 20077:00 amPRNTotal Voting Rights
24th May 20078:43 amPRNNotification of Shareholding
23rd May 20079:31 amPRNNotification of Shareholding
21st May 20078:16 amPRNAdditional Listing
16th May 20077:00 amPRNFinal Results
10th May 20072:30 pmPRNNotice of Results
8th May 200710:00 amPRNAppointment of Exploration and Technical Director
4th May 20077:00 amPRNNotification of Shareholding
30th Apr 200711:06 amPRNUtrecht Exploration Licence Awarded
30th Apr 20077:05 amPRNTotal Voting Rights
30th Apr 20077:00 amPRNNotification of Shareholding
27th Apr 200710:16 amPRNCorrection : Additional Listing
27th Apr 200710:11 amPRNNotification of Shareholding
27th Apr 20079:38 amPRNAdditional Listing
25th Apr 200710:24 amPRNNotification of Shareholding
23rd Apr 200711:01 amPRNNotification of Shareholding
23rd Apr 20077:00 amPRNAgreements with Dyas BV worth EUR32 million
18th Apr 200712:38 pmPRNCorrection : Notification of Shareholding
18th Apr 200711:23 amPRNNotification of Shareholding
3rd Apr 200712:00 pmPRNDirector Shareholding
2nd Apr 20077:00 amPRNWaalwijk Gas Storage Agreement with Star Energy
30th Mar 20077:00 amPRNAward of Exploration Licence and Drilling Update
27th Mar 20077:00 amPRNPurchase of Waalwijk Licence Interest
9th Mar 20074:18 pmPRNNotification of Shareholding
2nd Mar 200712:06 pmPRNNotification of Shareholding
1st Mar 20077:00 amPRNDirector/PDMR Shareholding
26th Feb 20077:00 amPRNFinal Decree of Three Offshore Italian licences
15th Feb 20073:00 pmPRNNetherlands - Development Update
6th Feb 200712:30 pmPRNNotification of Shareholding
17th Jan 200711:29 amPRNNetherlands Drilling Rig Contract Signed
11th Jan 20077:00 amPRNNotification of Shareholding
22nd Dec 20068:28 amPRNTotal Voting Rights
4th Dec 20067:00 amPRNNotification of Shareholding
28th Nov 200610:00 amPRNSeismic survey enhances offshore Sicily projects
13th Nov 20061:36 pmPRN
6th Nov 20061:14 pmPRNIssue of Warrants
1st Nov 20062:56 pmPRNAdditional Listing
31st Oct 20068:00 amPRNProvision of Finance Facility

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.