Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCabot Energy Regulatory News (CAB)

  • There is currently no data for CAB

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Operations Update

8 Mar 2018 07:00

RNS Number : 0487H
Cabot Energy PLC
08 March 2018
 

Prior to publication, the information contained within this announcement was deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR"). With the publication of this announcement, this information is now considered to be in the public domain.

 

 

Cabot Energy Plc

("Cabot Energy", the "Group" or the "Company")

Drilling operations update

Cabot Energy (AIM: CAB), the AIM quoted oil and gas company focused on production led growth, provides an update on the Company's first quarter winter work programme in Alberta, Canada, which comprises the drilling of four new sidetrack wells.

The work programme is ahead of schedule with three wells successfully drilled and tested and the fourth well scheduled to finish drilling shortly.

 

Summary results table

Sidetrack well

Test rate

(equivalent bopd)

Expected initial production rate

(bopd)

06-08

570

160

15-31

100

100

10-06

626

160

03-07

Currently drilling

 

06-08 sidetrack well

The well targeted a high porosity area within the reef using 3D seismic attribute analysis

Evidence of this high porosity was seen during drilling operations and confirmed by the well test result with an equivalent production rate of 570 bopd

Following completion, the well was put into production and is currently producing at a restricted rate of approximately 160 bopd to best manage the long term performance of the reservoir

15-31 sidetrack well

Following drilling, the well was tested over a short period at an equivalent rate of 100 bopd

During the test the overall fluid production rate was 300 barrels per day and the water cut was continuously reducing

Technical analysis indicated that reef porosity would be less than the other wells in the programme, but would still produce at a significant rate and the result supports that analysis

The well is expected to produce at an initial rate of 100 bopd with a low water cut

10-06 sidetrack well

The original vertical well drilled by the previous operator in 2009 produced little oil from the reef due to completion issues

The new 10-06 sidetrack well drilled 325 metres in the reservoir and tested at an equivalent rate of 626 bopd while still cleaning up

Following completion, the well is expected to be put on production at an initial rate of 160 bopd to manage the long term reservoir performance

03-07 - currently drilling

The 03-07 well has been drilled out of the existing well bore and is currently drilling in the reservoir

It is expected that drilling operations will finish within a week, after which the well will be tested and, if successful, put into production

 

All four wells are tied in via existing pipelines to the Company's 13-36 processing and sales facility. An operations and production update will be provided in April 2018 after the winter work programme completes.

 

Keith Bush, Chief Executive Officer of Cabot Energy, commented:

"The winter work programme is progressing well and each successful sidetrack well supports our technical approach to the redevelopment of the Rainbow region through the use of 3D seismic to identify the properties within each reef and target productive zones. With the completion of the fourth well likely to occur in the coming weeks, the programme will complete ahead of schedule and before the annual spring thaw, which is a credit to our operational team in Canada.

"These sidetrack wells provide excellent data reference points as we look to replicate this success in the summer programme and plan the ongoing development of production and reserves in the region next year."

For further information please contact:

Cabot Energy Plc

+44 (0)20 7469 2900

Keith Bush, Chief Executive Officer

Nick Morgan, Finance Director

SP Angel Corporate Finance LLP

+44 (0)20 3470 0470

Nominated Adviser and Joint Broker

Richard Morrison, Richard Redmayne, Charlie Bouverat

GMP FirstEnergy LLP

+44 (0)20 7448 0200

Joint Broker

Jonathan Wright, David van Erp

FTI Consulting

+44 (0)20 3727 1000 

Financial PR

Edward Westropp

 

In Accordance with AIM Rules - Guidance for Mining and Oil & Gas Companies, the information contained in this announcement has been reviewed and signed off by the CEO of Cabot Energy, Mr Keith Bush, who has 26 years' experience as a petroleum engineer. He has read and approved the technical disclosure in this regulatory announcement. The technical disclosure in this announcement complies with the SPE standard.

 

Note to Editors:

Cabot Energy is an oil and gas company focused on production led growth. The Company is building production from a redevelopment project in north west Alberta, Canada, and has a portfolio of exploration and appraisal opportunities in Italy. Comprehensive information on Cabot Energy and its oil and gas operations, including press releases, annual reports and interim reports are available from Cabot Energy's website: www.cabot-energy.com.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFKODDKBKBBNK
Date   Source Headline
8th Dec 20117:00 amPRNSale of Interest in Vinkega Gas Field
6th Dec 201111:30 amPRNCompletion Of Seismic Survey
17th Nov 20113:50 pmPRNAppointment of Joint Broker
17th Nov 20112:30 pmPRNNotification of Shareholding
17th Nov 20117:00 amPRNNotification of Shareholding
16th Nov 20111:19 pmPRNNotification of Shareholding
9th Nov 20117:16 amPRNUpdate re Guyane Oil Discovery
4th Nov 20117:00 amPRNNotification of Shareholding
3rd Nov 201112:47 pmPRNNotification of Shareholding
3rd Nov 201112:41 pmPRNTotal Voting Rights
18th Oct 20117:00 amPRNAdditional Listing
30th Sep 20117:00 amPRNInterim Results
20th Sep 20117:00 amPRNAppointment of Executive Director
9th Sep 20117:05 amPRNNew Offshore Oil Basin Discovery
7th Sep 201112:36 pmRNSMarwells Wood-1 Testing Update
7th Sep 20117:00 amPRNOil Testing at Markwells Wood
2nd Sep 20118:37 amPRNNotification of Shareholding
30th Aug 20117:00 amPRNAppointment of Non Executive Director
26th Aug 20119:17 amPRNNotification of Shareholding
1st Aug 20117:00 amPRNTotal Voting Rights
29th Jul 20112:15 pmPRNAdditional Listing
29th Jul 20112:08 pmPRNExtension of Warrants
29th Jul 20117:00 amPRNTotal Voting Rights
28th Jul 20117:00 amPRNOperations Update - Southern Adriatic
21st Jul 20114:28 pmPRNNotification of Shareholding
13th Jul 20117:00 amPRNItalian Offshore Update
1st Jul 20114:00 pmPRNAdditional Listing
29th Jun 201111:54 amPRNResult of AGM
29th Jun 201111:36 amPRNAGM Statement
13th Jun 20114:35 pmRNSPrice Monitoring Extension
13th Jun 20111:30 pmPRNNotification of Shareholding
10th Jun 20117:00 amPRNNotification of Shareholding
8th Jun 20115:30 pmPRNAnnual Report and Notice of Annual General Meeting
8th Jun 20112:00 pmPRNCorrection - Audited Results for Y/E 31 December 2010
8th Jun 20117:00 amPRNAudited Results for the Year Ended 31 December 2010
7th Jun 20113:55 pmPRNNotification of Shareholding
7th Jun 20117:00 amPRNNotification of Shareholding
2nd Jun 20114:55 pmPRNNotification of Shareholding
27th May 20117:00 amPRNReserves and Production Operations Update
18th Apr 20117:00 amPRNNotification of Shareholding
8th Apr 20111:10 pmRNSNotification of Shareholding
5th Apr 20117:00 amPRNTransfer of Operatorship to Shell - Re-Release
4th Apr 20115:54 pmPRNTransfer of Operatorship to Shell
31st Mar 20117:00 amPRNTotal Voting Rights
30th Mar 20114:12 pmPRNAdditional Listing
30th Mar 20111:18 pmPRNAdditional Listing & Director's Shareholding
28th Mar 20112:00 pmPRNAdditional Listing
25th Mar 201111:00 amPRNNew partner for Southern Adriatic Permits
23rd Mar 201110:29 amPRNAdditional Listing
10th Mar 20117:00 amPRNWell spuds in potential new South American oil basin

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.