Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.1025    0.0075 (7.89%)
Bid:
0.095
Ask:
0.11
Spread: 0.015 (15.789%)
Market Cap: £22.41m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Resource Update

21 Jul 2008 07:00

RNS Number : 4646Z
Bezant Resources PLC
21 July 2008
 



Bezant Resources Plc ("Bezant" or the "Company")

RESOURCE UPDATE, MANKAYAN PROJECT, PHILIPPINES

3.06 billion pounds (1.39 million tonnes) Copper and 3.8 million ounces Gold

Highlights:

Independent Inferred Resource estimate, reported by Snowden Mining Industry Consultants Pty Limited, in accordance with the 2004 JORC Code;

277.7 million tonnes Inferred Resource; 

0.50% copper and 0.42 g/t gold (0.73% copper equivalent*) grade containing at a 0.4% Cu copper cut-off;

- 3.06 billion pounds (1.39 million tonnes) of copper; and, 

 - 3.8 million ounces of gold.

Bezant (AIM: BZT), the AIM listed gold and copper exploration and development company operating in the Philippines and Tanzania, today announces that Snowden Mining Industry Consultants Pty Ltd ("Snowden") of West Perth Australia, has recently completed a resource estimate dated 06 July 2008, in relation to the Company's Mankayan Project. At a 0.4% copper cut-off, the Inferred Resource is approximately 277.7 million tonnes grading at 0.50% copper and 0.42 g/t gold. This independent resource estimate serves to support the Company's belief that its Mankayan Project represents a world-class copper and gold deposit, containing approximately 3.06 billion pounds (1.39 million tonnes) of copper and 3.8 million ounces of gold (within the Inferred Resource estimated at 277.7 million tonnes grading at 0.73% copper equivalent*).

The Inferred Resource was prepared by Snowden in relation to the copper-gold porphyry at the Company's Mankayan Project, located 260km north of Manila in the Philippines. The Inferred Resource estimate was based solely upon the historical results from approximately 45,000 metres of diamond drilling previously conducted over 48 holes at the Project, but does not include the assay data currently being generated from the Company's ongoing 11,000m diamond drilling programme.

Snowden have also commented that they are confident that Bezant should be in a position to upgrade various areas of the deposit to an Indicated Resource, as a result of the Company's ongoing additional 11,000 metre drilling programme and further consolidation of the historical data.

The independent resource estimate was undertaken and completed in conformance with the terms and guidelines of The Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2004 edition).

Gerry Nealon, Executive Chairman, commented: 

"We believe that Snowden's Inferred Resource estimate serves to independently verify the significance of the Mankayan Project, as a world class copper and gold deposit. We shall now endeavour to further upgrade the resource with data from our ongoing 11,000m drilling programme and thereafter, seek to progress the project into the pre-feasibility stage."

*Copper equivalent values are estimated, by the Company, using long-term metal prices including: Cu at USD$1.2 per pound and Au at USD$450 per ounce. CuEQ equals Cu per cent plus Au grams per tonne times 14.47 / (1.20 (x) 22.05). Metallurgical and mining recoveries are not considered and adjustment factors to account for differences in relative metallurgical recoveries for gold and copper will depend upon the completion of definitive metallurgical testing. 

Dr. Bernard Olivier, Executive Director, has reviewed and approved the technical information contained within this press release in his capacity as a competent person, as required under the AIM rules. Dr. Olivier is a Member of the Australasian Institute of Mining and Metallurgy. 

For further information, please contact:

Gerry Nealon

Executive Chairman, Bezant Resources Plc

Tel: +61 41 754 1873

Bernard Olivier

Executive Director, Bezant Resources Plc

Tel: +61 40 894 8182

James Harris / Matthew Chandler

Strand Partners Limited

Tel: +44 (0) 20 7409 3494

Laurence Read / Beth Harris

Threadneedle Communications (UK)

Email: Laurence.Read@threadneedlepr.co.uk

Tel: +44 (0)20 7936 9696

Mob: +44 (0)7979 955 923

or visit http://www.bezantresources.com

Notes for editors:

The Mineral and Production Sharing Agreement covers a total of 534 hectares in the Guinaoang area of the Philippines (the "Mankayan Project"). This is located in the Mankayan-Lepanto mining district, an area of porphyry copper belts in the Philippines and is similar to several deposits that have already been developed, such as the St Thomas deposit near Baguio City. The site is adjacent to the copper/gold mine owned and run by Lepanto Consolidated Mining Company. The Mankayan-Lepanto area has been mined for centuries and is readily accessible by both road and air. The Mankayan deposit was discovered in the early 1970s and since then has been extensively drilled, with four historical programmes being completed covering more than 45,000 metres of diamond drilling over 48 holes - being the subject of the current Inferred Resource estimate. 

Glossary of technical terms: 

"Indicated Mineral Resource"

That part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

"Inferred Mineral Resource"

That part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

"JORC"

The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLFLBLVDBLBBE
Date   Source Headline
30th Jun 20257:00 amRNSFinal Results
27th Jun 20259:18 amRNSMankayan Project - Blackstone Shares & Corporate
26th Jun 20253:21 pmRNSHolding(s) in Company
25th Jun 20257:00 amRNSHope & Gorob Award of Mining Licence
18th Jun 20258:21 amRNSUpdate - Blackstone & IDM Merger Becomes Effective
17th Jun 20254:14 pmRNSMankayan Project Update - Blackstone & IDM Merger
10th Jun 20252:49 pmRNSMankayan Project Update - Blackstone & IDM Merger
21st May 20257:00 amRNSCompletion of disposal of Eureka Project
19th May 20257:00 amRNSIssue of Equity and TVR
1st May 202512:00 pmRNSProposed sale of Eureka Project in Argentina
16th Apr 202511:01 amRNSHolding(s) in Company
16th Apr 20257:02 amRNSProposed sale of Eureka Project in Argentina
3rd Apr 20255:04 pmRNSAward of Environmental Clearance Certificate
3rd Apr 202511:50 amRNSMankayan Project Update
2nd Apr 202510:27 amRNSHope & Gorob Approval of ECC
18th Mar 20255:20 pmRNSDirector/PDMR Shareholding
5th Mar 20259:11 amRNSMankayan Project Update - Visible Gold Discovered
27th Feb 20257:00 amRNSFunding Facility Repayment Extension
25th Feb 20257:45 amRNSProposed sale of Eureka Project in Argentina
21st Feb 20259:31 amRNSHolding(s) in Company
18th Feb 202510:40 amRNSHolding(s) in Company
12th Feb 20257:00 amRNSHope & Gorob Ore Sorting Optimisation
6th Feb 20258:44 amRNSMankayan Project Update
30th Jan 20257:00 amRNSHope & Gorob Mine Planning Update
2nd Jan 20253:31 pmRNSReplacement: Fundraising, Directors' Holdings, TVR
27th Dec 20247:00 amRNSReplacement: Fundraising, Directors' Holdings, TVR
24th Dec 202412:21 pmRNSFundraising, Directors' holdings, Fee shares, TVR
15th Nov 202411:04 amRNSHope & Gorob Mine Planning Update
7th Nov 20247:00 amRNSHope & Gorob Optimisation & Geotechnical Drilling
1st Nov 202410:10 amRNSHope & Gorob Gold Contribution Review
1st Nov 20249:30 amRNSTotal Voting Rights
30th Oct 20247:00 amRNSPCB Gold Project Update, Zambia
29th Oct 20249:11 amRNSHolding(s) in Company
16th Oct 20247:00 amRNSRe Granting of Mining Licence for Hope & Gorob
2nd Oct 20243:31 pmRNSFundraising, Issue of Equity and TVR
30th Sep 20247:00 amRNSUnaudited Interim Results
26th Sep 20247:00 amRNSHope & Gorob Copper-Gold Project Permitting Update
28th Aug 20247:00 amRNSHope & Gorob Copper-Gold Project Permitting Update
27th Aug 20247:00 amRNSGeophysical Surveying at Kanye Manganese Project
19th Aug 202411:26 amRNSDirector's Dealings
8th Aug 20247:00 amRNSPlacing Issue of Shares PDMR Shareholdings REPLACE
6th Aug 20242:16 pmRNSDirector's Dealings
31st Jul 20242:13 pmRNSResult of AGM
24th Jul 20247:45 amRNSLOI re sustainable energy supply for Hope & Gorob
16th Jul 20244:00 pmRNSIssue of Shares and TVR
8th Jul 20245:48 pmRNSNotice of AGM
2nd Jul 20247:00 amRNSMankayan Project Investment Update
28th Jun 20247:00 amRNSFinal Results
13th Jun 20247:00 amRNSHope & Gorob Copper - Gold Project, Namibia Update
10th Jun 20247:00 amRNSCollaboration Agreement re Zambian gold project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.