Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.095    -0.0075 (-7.32%)
Bid:
0.09
Ask:
0.10
Spread: 0.01 (11.111%)
Market Cap: £20.77m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Resource Update

21 Jul 2008 07:00

RNS Number : 4646Z
Bezant Resources PLC
21 July 2008
 



Bezant Resources Plc ("Bezant" or the "Company")

RESOURCE UPDATE, MANKAYAN PROJECT, PHILIPPINES

3.06 billion pounds (1.39 million tonnes) Copper and 3.8 million ounces Gold

Highlights:

Independent Inferred Resource estimate, reported by Snowden Mining Industry Consultants Pty Limited, in accordance with the 2004 JORC Code;

277.7 million tonnes Inferred Resource; 

0.50% copper and 0.42 g/t gold (0.73% copper equivalent*) grade containing at a 0.4% Cu copper cut-off;

- 3.06 billion pounds (1.39 million tonnes) of copper; and, 

 - 3.8 million ounces of gold.

Bezant (AIM: BZT), the AIM listed gold and copper exploration and development company operating in the Philippines and Tanzania, today announces that Snowden Mining Industry Consultants Pty Ltd ("Snowden") of West Perth Australia, has recently completed a resource estimate dated 06 July 2008, in relation to the Company's Mankayan Project. At a 0.4% copper cut-off, the Inferred Resource is approximately 277.7 million tonnes grading at 0.50% copper and 0.42 g/t gold. This independent resource estimate serves to support the Company's belief that its Mankayan Project represents a world-class copper and gold deposit, containing approximately 3.06 billion pounds (1.39 million tonnes) of copper and 3.8 million ounces of gold (within the Inferred Resource estimated at 277.7 million tonnes grading at 0.73% copper equivalent*).

The Inferred Resource was prepared by Snowden in relation to the copper-gold porphyry at the Company's Mankayan Project, located 260km north of Manila in the Philippines. The Inferred Resource estimate was based solely upon the historical results from approximately 45,000 metres of diamond drilling previously conducted over 48 holes at the Project, but does not include the assay data currently being generated from the Company's ongoing 11,000m diamond drilling programme.

Snowden have also commented that they are confident that Bezant should be in a position to upgrade various areas of the deposit to an Indicated Resource, as a result of the Company's ongoing additional 11,000 metre drilling programme and further consolidation of the historical data.

The independent resource estimate was undertaken and completed in conformance with the terms and guidelines of The Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2004 edition).

Gerry Nealon, Executive Chairman, commented: 

"We believe that Snowden's Inferred Resource estimate serves to independently verify the significance of the Mankayan Project, as a world class copper and gold deposit. We shall now endeavour to further upgrade the resource with data from our ongoing 11,000m drilling programme and thereafter, seek to progress the project into the pre-feasibility stage."

*Copper equivalent values are estimated, by the Company, using long-term metal prices including: Cu at USD$1.2 per pound and Au at USD$450 per ounce. CuEQ equals Cu per cent plus Au grams per tonne times 14.47 / (1.20 (x) 22.05). Metallurgical and mining recoveries are not considered and adjustment factors to account for differences in relative metallurgical recoveries for gold and copper will depend upon the completion of definitive metallurgical testing. 

Dr. Bernard Olivier, Executive Director, has reviewed and approved the technical information contained within this press release in his capacity as a competent person, as required under the AIM rules. Dr. Olivier is a Member of the Australasian Institute of Mining and Metallurgy. 

For further information, please contact:

Gerry Nealon

Executive Chairman, Bezant Resources Plc

Tel: +61 41 754 1873

Bernard Olivier

Executive Director, Bezant Resources Plc

Tel: +61 40 894 8182

James Harris / Matthew Chandler

Strand Partners Limited

Tel: +44 (0) 20 7409 3494

Laurence Read / Beth Harris

Threadneedle Communications (UK)

Email: Laurence.Read@threadneedlepr.co.uk

Tel: +44 (0)20 7936 9696

Mob: +44 (0)7979 955 923

or visit http://www.bezantresources.com

Notes for editors:

The Mineral and Production Sharing Agreement covers a total of 534 hectares in the Guinaoang area of the Philippines (the "Mankayan Project"). This is located in the Mankayan-Lepanto mining district, an area of porphyry copper belts in the Philippines and is similar to several deposits that have already been developed, such as the St Thomas deposit near Baguio City. The site is adjacent to the copper/gold mine owned and run by Lepanto Consolidated Mining Company. The Mankayan-Lepanto area has been mined for centuries and is readily accessible by both road and air. The Mankayan deposit was discovered in the early 1970s and since then has been extensively drilled, with four historical programmes being completed covering more than 45,000 metres of diamond drilling over 48 holes - being the subject of the current Inferred Resource estimate. 

Glossary of technical terms: 

"Indicated Mineral Resource"

That part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

"Inferred Mineral Resource"

That part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

"JORC"

The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLFLBLVDBLBBE
Date   Source Headline
1st May 202612:14 pmRNSTotal Voting Rights
8th Apr 20267:00 amRNSHope & Gorob Project-New Mineral Resource Estimate
31st Mar 20267:00 amRNSFundraising, Directors' Dealing and TVR
30th Mar 20269:31 amRNSHope & Gorob Copper-Gold - Mine Development Update
30th Mar 20267:00 amRNSExercise of Warrants, Total Voting Rights
24th Mar 20261:24 pmRNSAdditional 20% interest in Hope and Gorob
11th Mar 202611:00 amRNSAppointment of mining and logistics contractor
11th Mar 202611:00 amRNSAppointment of mining and logistics contractor
10th Mar 20267:00 amRNSNLZM Mining Licence Renewed, Warrants Exercise TVR
10th Mar 20267:00 amRNSNLZM Mining Licence Renewed, Warrants Exercise TVR
3rd Mar 20262:11 pmRNSGrant of Options and Director/PDMR Shareholding
23rd Jan 202610:47 amRNSExercise of Warrants and TVR
14th Jan 202610:34 amRNSExercise of Warrants, Total Voting Rights
8th Jan 202610:53 amRNSExercise of Warrants, Total Voting Rights
29th Dec 20255:00 pmRNSDirector/PDMR Shareholding
29th Dec 20255:00 pmRNSDirector/PDMR Shareholding
24th Dec 20259:23 amRNSDirector/PDMR Shareholding
24th Dec 20259:23 amRNSDirector/PDMR Shareholding
17th Dec 20257:00 amRNSCompletion of NLZM Processing Plant Acquisition
8th Dec 20253:08 pmRNSResult of General Meeting
8th Dec 202510:23 amRNSExercise of Warrants, Total Voting Rights
4th Dec 20257:00 amRNSExercise of Warrants, Total Voting Rights
2nd Dec 202511:08 amRNS-RGeneral Meeting Presentation
19th Nov 20257:00 amRNSCircular re Proposed Acquisition and Notice of GM
12th Nov 202512:36 pmRNSHolding(s) in Company
6th Nov 20252:04 pmRNSExercise of Warrants and TVR
3rd Nov 20257:00 amRNSExercise of Warrants and Total Voting Rights
31st Oct 202512:37 pmRNSTotal Voting Rights
31st Oct 202511:37 amRNSPrepayment Facility and concentrate offtake agreed
30th Oct 20257:00 amRNSHope and Gorob Project Study Report
29th Oct 20252:39 pmRNSHope and Gorob Project Update
24th Oct 20257:00 amRNSExercise of Warrants, Total Voting Rights
16th Oct 20259:44 amRNSExercise of Warrants, Total Voting Rights
10th Oct 20259:01 amRNSBlackstone Investment - Mankayan Project Update
10th Oct 20257:00 amRNSExercise of Warrants, Total Voting Rights
2nd Oct 20259:21 amRNSHolding(s) in Company
2nd Oct 20257:00 amRNSUpdate on Blackstone Minerals Investment
30th Sep 20257:00 amRNSInterim Results for Six Months Ended 30 June 2025
17th Sep 202510:14 amRNSBlackstone Minerals - Mankayan Project Update
11th Sep 20251:03 pmRNSExercise of Warrants, Total Voting Rights
14th Aug 20257:00 amRNSProposed Acquisition of Processing Plant
29th Jul 20257:07 amRNSBlackstone Investment - Mankayan Project Update
25th Jul 202511:57 amRNSResult of AGM
14th Jul 202512:23 pmRNSBlackstone Investment - Mankayan Project Update
11th Jul 20252:46 pmRNSExercise of Warrants, Total Voting Rights
9th Jul 20252:50 pmRNSExercise of Warrants, Total Voting Rights
9th Jul 202511:14 amRNSMankayan Project Update
8th Jul 20258:03 amRNSHolding(s) in Company
2nd Jul 202511:08 amRNSMankayan Project Update
2nd Jul 20257:00 amRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.