We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Res Regulatory News (BZT)

Share Price Information for Bezant Res (BZT)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.021
Bid: 0.018
Ask: 0.024
Change: 0.00 (0.00%)
Spread: 0.006 (33.333%)
Open: 0.021
High: 0.021
Low: 0.021
Prev. Close: 0.021
BZT Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

New Mining Study Commissioned, Mankayan Project

28 Nov 2018 09:00

RNS Number : 7447I
Bezant Resources PLC
28 November 2018
 

28 November 2018

Bezant Resources Plc

("Bezant" or the "Company")

New Mining Study Commissioned, Mankayan Project, Philippines

Bezant (AIM: BZT), the copper-gold exploration and development company, is pleased to announce that it has commissioned a new mining study to be conducted by Mining Plus Pty Limited ("Mining Plus") in order to examine mining options in relation to distinct high grade areas within the Mankayan copper-gold project, located on the Island of Luzon in the Philippines (the "Mankayan Project").

 

New Mining Study

Mining Plus, a mining technical services provider, has been appointed as an independent consultancy group to undertake a mining study on the Mankayan Project (the "Mining Study") based on their strong international reputation and prior experience with the project. The Board notes that Mining Plus' involvement in an historic study, alongside TWP Australia (Pty) Ltd ("TWP"), was limited in scope by the then specified mining method, production rate and other parameters.

 

Following analysis of higher grade areas and engineering concepts by the Company, the new study will look to examine the viability of new, scalable mining options for the Mankayan Project. One of the objectives of the study is to determine economically viable alternative mining processes, within the Lift 1 area of the historic Scoping Study, to traditional block caving. Block caving typically requires high levels of initial capital expenditure before first production commences.

 

The new Mining Study will comprise a high-level desktop review, which will not require additional drilling, and is expected to be completed during Q1 2019.

 

The Mining Study will consider the economics of various mining options, which may include:

· High-grade focussed block caving

· Alternative production rates

· Staged production rate ramp-ups

 

The existing block cave model, based on the historic studies completed in 2011 and 2014, includes various scenarios built around a two lift sequence including, at a run rate of 20 million tonnes per annum ("Mtpa"), a US$739m net present value ("NPV") with a 21 per cent. internal rate of return ("IRR"), production costs of US$17.31/t, mining capex of US$217m and infrastructure capex of US$796m. Following analysis of certain high-grade areas, including 'open' sections in the JORC (2004) resource, the single lift scenario offers the potential to move from a block cave system to a different mine plan with significantly reduced capital expenditure. It is anticipated than any new alternate mining scenario resulting from the new study would sit alongside the full 20 Mtpa block cave model, thereby allowing the Company distinct options to progress its Mankayan Project.

 

As the new Mining Study will include geological block model analysis, it will assist the Company in determining further target areas where higher grades of copper and gold may exist within the current JORC (2004) resource area defined by Snowden Mining Industry Pty Limited in 2009. The Board notes that this previously reported resource estimate excludes the results of hole BRC-60, a 1,491m diamond drill hole completed by Gold Fields Netherlands Services BV ("Gold Fields"), which were announced on 12 February 2014, which confirmed that the Mankayan deposit is open at depth and increased the previously known depth extent of the mineralisation on the eastern part of the deposit by over 200m.

 

Commenting today Laurence Read, CEO of Bezant, said:

"

"As CEO, I am pleased that we shall be progressing the Mankayan copper gold project following the results of extensive in-house geological and engineering work over the course of the last year. 

 

"Our understanding of Mankayan has grown significantly and the potential for exploiting high grade resource areas needs to be independently examined. While the current, 20 Mtpa economic scenario for Mankayan is highly robust and comparable to a series of successful, currently operating, third party projects we believe that there may well be a viable alternate mining system that can be implemented within the Lift 1 area of the existing model.

 

"Mankayan is a significant potential source of long-term copper gold-supply and the results of the new Mining Study may allow Bezant to pursue new avenues for the project if production scenarios, with reduced upfront capital expenditure, can be determined.

 

"Mining Plus is a major, internationally recognised mining services provider who have successfully worked with a host of mining companies to deliver projects into first production and I look forward to working with them."

 

 

 

For further information, please contact:

 

Bezant Resources Plc

Laurence Read

Chief Executive Officer

Colin Bird

Executive Chairman

 

Tel: +44 (0)20 3289 9923

 

 

Strand Hanson Limited (Nomad)

James Harris / Matthew Chandler / James Dance

 

Tel: +44 (0)20 7409 3494

 

Novum Securities Limited (Broker)

Jon Belliss

 

Tel: +44 (0)20 7399 9400

 

or visit http://www.bezantresources.com

 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.

 

Notes to Editors:

Mining Plus

Mining Plus (www.mining-plus.com) in an international mining services provider specialising in geology, mining engineering, and geotechnical engineering, covering a broad range of mineral commodities and project types, enhanced by strategic alliances in other core disciplines. Mining Plus has advised on over 1,850 projects for 630 customers in 40 countries over a range of different commodities.

 

The Mankayan Project, Philippines

The Mankayan deposit is principally hosted by a 900m long by 400m wide north-south striking intrusive stock complex composed largely of quartz diorite porphyry. The igneous rocks have intruded a thick sequence of andesitic volcanics and a basement of biotitequartz schists and mafic flows. The size, grade and mineralogy of the Guinaoang deposit are typical of porphyry copper deposits.

 

From October 2011 to January 2014, the Mankayan Project was held under option by Gold Fields for a total exercise price of US$70m (of which US$9.5m was received by the Company by way of initial non-refundable option payments). The option ultimately lapsed, as Gold Fields began new operations in Australia, and all exploration data, including the results of the high-grade BR 60 drill hole completed by Gold Fields during the option period, was transferred to Bezant.

 

Historic Studies

In 2011, TWP was commissioned by Bezant to undertake a Conceptual Study on the Mankayan Project comprising an undeveloped underground mine, for which a conceptual mining, extraction and processing method was to be determined. This study was conducted within +35% to -30% limits of accuracy. In 2014, GHD Group Pty. Limited ("GHD") and Mining Plus were commissioned to conduct a desktop review of TWP's report and update the capital and operating expenditure assumptions.

 

· Project's estimated return (US$3.00/lb, Cu and US$1,250/oz Au):

- post-tax NPV of approximately US$739 million at an 8% discount rate

- post-tax IRR of 21%

- post-tax net cashflow of approximately US$3.7 billion

· Total capital investment cost of approximately US$1 billion over the duration of the project at 20 Mt per annum and over a 28-year mine life

· US$17.31 costs per ore tonne, including all royalties, taxes, capital costs, equipment ownership, operating and processing costs and administrative and technical services costs

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDZMMZMRRMGRZG
Date   Source Headline
2nd Jan 20204:26 pmRNSForm 8.3 - Bezant Resources PLC Replacement
2nd Jan 20204:23 pmRNSForm 8.3 - Brezant Resources PLC Replacement
2nd Jan 20204:21 pmRNSForm 8.3 - Bezant Resources PLC Replacement
2nd Jan 20204:17 pmRNSForm 8.3 - Brezant Resources PLC Replacement
2nd Jan 20203:04 pmRNSForm 8.3 - Bezant Resources PLC
2nd Jan 20203:04 pmRNSForm 8.3 - Bezant Resources PLC
2nd Jan 20203:04 pmRNSForm 8.3 - Bezant Resources PLC
2nd Jan 20203:03 pmRNSForm 8.3 - Bezant Resources PLC
2nd Jan 20203:02 pmRNSForm 8.3 - Bezant Resources PLC
5th Dec 201911:30 amRNSPlacing to raise £350,000 (gross)
18th Nov 20198:00 amRNSCompletion of disposal of 80% of Mankayan Project
13th Nov 20191:40 pmRNSUpdate re disposal of 80% of Mankayan Project
31st Oct 20192:05 pmRNSSecond Price Monitoring Extn
31st Oct 20192:00 pmRNSPrice Monitoring Extension
30th Oct 201910:30 amRNSResult of General Meeting
11th Oct 20197:00 amRNSPosting of Circular and Notice of General Meeting
7th Oct 201912:30 pmRNSHolding(s) in Company
7th Oct 20197:00 amRNSProposed Disposal of 80% of Mankayan project
30th Sep 20197:00 amRNSInterim Results for Six Months Ended 30 June 2019
23rd Sep 20199:15 amRNSHolding(s) in Company
8th Aug 20197:00 amRNSCu-Au Assays from Buffalo Project, Zambia
15th Jul 20199:15 amRNSEIA Baseline Study Completed, Mankayan Cu Project
10th Jul 20197:00 amRNSCompletion of Exploration Review - Buffalo Project
14th Jun 20197:00 amRNSFly-through video for the Mankayan Project
24th May 201911:52 amRNSResult of Annual General Meeting
20th May 20197:00 amRNSUpdated EIA Approvals Granted for Eureka Project
1st May 20197:30 amRNSFinal Results and Notice of AGM
23rd Apr 20197:00 amRNSOption Agreement for Buffalo Copper / Gold Project
12th Feb 20197:00 amRNSResults of New Mining/Economic Study for Mankayan
28th Nov 20189:00 amRNSNew Mining Study Commissioned, Mankayan Project
1st Oct 20187:00 amRNSBlock Model Analysis-Mankayan Project, Philippines
28th Sep 20188:00 amRNSInterim Results
23rd Aug 20183:30 pmRNSGrant of Share Options
22nd Jun 201812:00 pmRNSResult of AGM
31st May 20187:00 amRNSEquity Fundraising to raise £800,000 (gross)
30th May 20187:00 amRNSFinal Results
29th May 20187:00 amRNSRenewal of MPSA exploration period for Mankayan
10th May 20187:00 amRNSCopper-Gold Strategic Review Results
26th Apr 201810:00 amRNSUS$500,000 Disposal of Choco Project, Colombia
9th Apr 20188:25 amRNSChange of Broker
22nd Mar 20187:00 amRNSStrategic Review and Issue of Equity
7th Mar 20189:33 amRNSHolding(s) in Company
2nd Mar 201811:15 amRNSStatement re: Broker
1st Mar 201810:30 amRNSResult of General Meeting and Board Changes
12th Feb 201811:00 amRNSPosting of Circular and Notice of General Meeting
6th Feb 201811:00 amRNSPrice Monitoring Extension
5th Feb 20187:00 amRNSEquity Fundraising to raise £600,000 (gross)
15th Jan 20187:00 amRNSDirectorate Change and CEO Appointment
3rd Jan 20187:00 amRNSFinal Option Payment re Colombia
6th Dec 20172:15 pmRNSEquity fundraising to raise £550,000 gross

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.