The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Res Regulatory News (BZT)

Share Price Information for Bezant Res (BZT)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.022
Bid: 0.019
Ask: 0.025
Change: 0.00 (0.00%)
Spread: 0.006 (31.579%)
Open: 0.022
High: 0.022
Low: 0.022
Prev. Close: 0.022
BZT Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Cu-Au Assays from Buffalo Project, Zambia

8 Aug 2019 07:00

RNS Number : 3208I
Bezant Resources PLC
08 August 2019
 

8 August 2019

Bezant Resources Plc

("Bezant" or the "Company")

Cu-Au Assays from Buffalo Project, Zambia

Highlights

·; Assay results from second round of composite rock chip sampling return high grade copper values with supporting silver from surface bedrock exposure

·; In situ sample results from the existing 12-15m wide pit face (BFR 2 and 3) range from 2.21% - 4.07% Cu

·; Sidewall mineralisation results (BFR 5 and 6) grading at 0.64% - 2.03% Cu significantly extend the potential width of the target zone

·; New outcrop discovery identifies extension of the copper zone 350m to the southwest

·; Further mapping and trenching work scheduled to define potential near surface drilling targets

Bezant (AIM: BZT), the copper-gold exploration and development company, is pleased to announce assay results returned from the Buffalo Project in Zambia showing the presence of high grade copper at surface.

The selected significant assay results below are from a total of 8 composite rock chip samples taken by the Company's geological survey team as part of its ongoing exploration work on the Buffalo project, a 398 hectare copper/gold asset situated in the Central Zambian iron oxide copper-gold ("IOCG") belt, over which the Company holds a conditional option to acquire a 50 per cent. interest (the "Buffalo Project").

Buffalo Project's Second Round Composite Rock Chip Samples - Selected Assay Results

Rock ID

Description

Assay values

Cu%

Ag ppm

Fe%

Au ppm

BFR 2

Red hematite breccia with malachite from pit face (LHS)

2.21

6.47

6.27

BFR 3

Red hematite breccia with malachite from pit face (RHS)

4.07

4.70

8.23

<0.01

BFR 4

Vuggy red mudstone with malachite in sidewall of ore zone (RHS)

1.16

4.47

4.94

<0.01

BFR 5

Banded grey siltstone with hematite & malachite in sidewall of ore zone (LHS)

0.64

8.96

1.37

0.02

BFR 6

Pale grey silicified mudstone breccia with disseminated malachite in matrix on LHS sidewall of pit

2.03

10.10

1.88

0.02

BFR 8

Silicified hematitic/limonitic breccia with vuggy texture

0.23

1.75

0.02

 

The sample results from BFR 2 and 3 confirm the tenor of strong copper grades obtained during an earlier reconnaissance visit to the site of the small-scale open pit at the Buffalo Project. Samples BFR 4 to 6 also demonstrate that copper mineralisation at potentially economic grades extends for some distance into the footwall and hangingwall margins of the 12-15m wide, near-vertical shear zone, thereby adding significantly to the width of the target for follow-up drilling.

Further encouragement was obtained from the sampling of a newly-discovered bedrock occurrence 350m directly along strike from the mineralised shear zone to the southwest. The outcrop exhibited iron-silica alteration and a rock chip sample (BFR 8) assayed 0.23% Cu, confirming the continuation of copper mineralisation into this area.

All of the samples were submitted for analysis to the SGS Kalulushi geochemical laboratory in Zambia. The laboratory is accredited to ISO/IEC 17025 standard for copper analysis.

Detailed mapping, sampling and trenching is planned in the next phase of work in order to define potential shallow, near-term drilling targets.

Overview

Bezant's exploration review has to date identified a zone of structural focus centred on a site of artisanal copper/gold mining activity within the Buffalo Project's open pit. This serves to support the prospective nature of a mineralised structure traversing the project's licence area which is seemingly open at depth.

 

The Buffalo Project is located within a major east-northeast/west-southwest structural corridor in the Central Zambian IOCG province. Approximately 70km to the southwest along the structural corridor lies the Jifumpa copper mine, currently operated by a Chinese enterprise, Ruida Investments Limited. Deposits in this province are generally hosted at a higher stratigraphic level within the same rock package as the world-class Zambian copper belt deposits. The IOCG province was previously subject to only limited exploration due to the focus on the long-established projects located on the copper belt. Nevertheless, such historic exploration activity resulted in the discovery of several significant copper deposits, including the Kalengwa mine (production estimate of 1.9 million tonnes ("Mt") @ 9.44% Cu and 50 g/t Ag) and the Kitumba (Mumbwa) deposit with a reported JORC-compliant Indicated Mineral Resource estimate of 87.6Mt @ 1.17% Cu, including 29.8Mt @ 2.13% Cu. In other global mining districts, major projects have been brought into development hosted within similar IOCG structures including BHP's giant Olympic Dam mine located in South Australia.

 

 

Laurence Read, CEO of Bezant, commented:

"This latest round of rock chip sample results demonstrates the presence of principally one per cent or more copper located at surface. In addition to the recorded copper results the other information obtained from the assay results including the iron, silver and gold content adds valuable information informing the team as to how the mineralisation might be structured along strike and at depth. Adding this new data to the historic logs, we shall now seek to start generating initial drill targets, most probably near surface and along strike."

 

 

For further information, please contact:

Bezant Resources plc

Laurence Read

Chief Executive Officer

 

Colin Bird

Executive Chairman

 

Strand Hanson Limited (Nomad)

James Harris / Matthew Chandler / James Bellman

 

Novum Securities Limited (Broker)

Jon Belliss

 

or visit http://www.bezantresources.com

 

Tel: +44 (0)20 3289 9923

 

 

 

 

 

Tel: +44 (0)20 7409 3494

 

 

Tel: +44 (0)20 7399 9400 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.

 

Qualified Person's Statements

Geological information in this announcement relating to the licence area has been reviewed by Edward (Ed) Slowey, BSc, PGeo, a consultant to Bezant. Mr Slowey is a graduate geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and a qualified person under the AIM Rules. Mr Slowey has reviewed and approved the geological content of this announcement.

 

In accordance with the AIM Note for Mining and Oil & Gas Companies, June 2009 (the "Guidance Note"), Colin Bird, CEng, FIMMM, a South African and UK Certified Mine Manager and Executive Chairman of Bezant, with more than 40 years' relevant experience, is the qualified person who has reviewed and approved the technical information contained herein.

 

 

Note to Editors:

 

IOCG Province Zambia

 

Numerous copper occurrences are known throughout central and western Zambia, mostly as a result of prospecting in the early to mid-1900s. Much of the early exploration effort in this region was focused on the search for Copperbelt-style sediment-hosted deposits, but instead resulted in the discovery of vein and breccia-type copper showings and deposits often associated with iron concentrations and, in some instances, gold. Numerous copper-gold and iron oxide occurrences are known in the district and are noted on the Geological and Mineral Occurrence Map of Zambia. These types of deposit have come to be known as iron oxide copper-gold (IOCG) deposits, with the best known example being the Olympic Dam mine site in Australia.

 

IOCG deposits comprise a broad range of mineralisation styles, grouped together chiefly because they contain hydrothermal magnetite and/or specular haematite as major accompaniments (>20% Fe oxides) to copper sulphides.

 

Option Agreement

In April 2019, Bezant entered into an agreement with KPZ International Limited pursuant to which it was granted a conditional option to acquire a 50 per cent. interest in licence number 15164-HQ-SML in The Republic of Zambia which contains the Buffalo exploration project. 

 

Under the terms of this agreement and as consideration for such potential 50 per cent. interest in the Buffalo project, Bezant is required to complete an initial assessment of the licence area at a cost of up to US$200,000 by 1 February 2020. Throughout this initial phase, Bezant retains the right, at its sole discretion, to cease expenditure on the initial assessment and withdraw from the option, whereupon all other obligations under the agreement would be terminated.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLCKODNFBKDCFK
Date   Source Headline
15th Mar 20247:00 amRNSGrant of Options - Directors/PDMRs Shareholdings
14th Mar 20247:00 amRNSUpdate on Hope & Gorob Copper – Gold Project
5th Mar 20247:00 amRNSFunding Facility Repayment Extension
9th Feb 20247:00 amRNSHope & Gorob Copper – Gold Project, Namibia Update
29th Dec 202311:16 amRNSTotal Voting Rights
19th Dec 20239:18 amRNSHolding(s) in Company
4th Dec 20237:00 amRNSPlacing, Issue of Shares, PDMR Shareholdings &TVR
17th Nov 20232:22 pmRNSHolding(s) in Company
10th Nov 20237:00 amRNSIssue of Shares and TVR
27th Oct 20237:00 amRNSHope & Gorob Updated Mineral Resource Estimate
29th Sep 20237:00 amRNSHalf-year Report
6th Sep 20237:00 amRNSUpdate on Projects
28th Jul 20231:17 pmRNSResult of AGM
24th Jul 20232:49 pmRNSKanye Project: Metallurgical Test Work Results
4th Jul 202310:00 amRNSNotice of AGM and 2022 Accounts
30th Jun 20237:00 amRNSFinal Results
15th Jun 20237:00 amRNSFunding Facility Extension, Issue of Shares, TVR
31st May 20232:41 pmRNSTotal Voting Rights
5th May 202311:33 amRNSIssue of Shares and TVR
4th May 20231:07 pmRNSTotal Voting Rights
12th Apr 20237:00 amRNSFund raise, Director fees, joint Broker and TVR
27th Mar 202311:53 amRNSMankayan Project Update
1st Mar 20232:49 pmRNSMankayan Project Update
9th Feb 20232:58 pmRNSMaiden Kanye Drill Programme, update Hope & Gorob
9th Jan 20237:00 amRNSIssue of Equity and TVR
15th Nov 20224:35 pmRNSPrice Monitoring Extension
26th Oct 202212:21 pmRNSMankayan Project Update
18th Oct 20221:56 pmRNSTermination by mutual consent of Cyprus JV
3rd Oct 20223:34 pmRNSStatement re Cyprus Joint Venture with Caerus
30th Sep 20227:00 amRNSInterim Results for Six Months Ended 30 June 2022
14th Sep 20227:00 amRNSUpdate on Kanye Manganese Project in Botswana
31st Aug 202212:01 pmRNSTotal Voting Rights
24th Aug 20227:00 amRNSResult of AGM
11th Aug 20223:37 pmRNSExercise of Warrants, Total Voting Rights
9th Aug 20227:00 amRNSHope and Gorob Project Update
29th Jul 20222:24 pmRNSTotal Voting Rights
29th Jul 202211:00 amRNSNotice of AGM
7th Jul 20221:58 pmRNSExercise of Warrants, Total Voting Rights
30th Jun 20226:09 pmRNSFinal Results and Publication of Annual Report
30th Jun 202211:21 amRNS£700,000 Drawdown under Funding Facility
14th Jun 20227:00 amRNSHope and Gorob Project Shallow Drilling Update
8th Jun 20227:00 amRNSCyprus Joint Venture Drilling Update
30th May 20224:27 pmRNSDirector's Dealing
30th May 202212:34 pmRNSDirector's Dealing
12th May 20223:02 pmRNSExercise of Warrants, Total Voting Rights
3rd May 20227:00 amRNSCyprus Joint Venture Drilling Update
27th Apr 20227:00 amRNSCyprus Joint Venture Update
7th Apr 20229:00 amRNSPrice Monitoring Extension
6th Apr 20227:00 amRNSMaiden Troulli Mineral Resource Estimate
6th Apr 20227:00 amRNSCyprus Joint Venture Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.