Sapan Gai, CCO at Sovereign Metals, discusses their superior graphite test results. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Res Regulatory News (BZT)

Share Price Information for Bezant Res (BZT)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.02
Bid: 0.017
Ask: 0.023
Change: 0.00 (0.00%)
Spread: 0.006 (35.294%)
Open: 0.02
High: 0.02
Low: 0.02
Prev. Close: 0.02
BZT Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

EIA Baseline Study Completed, Mankayan Cu Project

15 Jul 2019 09:15

RNS Number : 5141F
Bezant Resources PLC
15 July 2019
 

15 July 2019

Bezant Resources Plc

("Bezant" or the "Company")

EIA Baseline Study Completed, Mankayan Cu Project, Luzon, Philippines

Bezant (AIM: BZT), the copper-gold exploration and development company, is pleased to announce that it has completed a key component of the Environmental Impact Assessment ("EIA") baseline study required for the successful future completion of a pre-feasibility study. The dry season water quality baseline study at the Company's Mankayan copper-gold project, located in Luzon in the Philippines, has been undertaken in order to establish the monitoring levels for the potential development of a sustainable mining project. GHD Group Pty. Ltd ("GHD") were engaged to undertake the independent environmental survey work over the Mankayan Project's site covering an area of 533.4 hectares under the Mineral Production Sharing Agreement ("MPSA") Number 057-96-CAR.

The baseline water quality assessment comprised the following scope of work:

· Review of previous water quality baseline report and related documents

· Site reconnaissance, interview of personnel and documentation of the existing conditions of the 12 established sampling stations within and outside the MPSA area

· Surface and ground water quality sampling in the 12 abovementioned established stations

· Analytical testing (i.e. physico-chemical, microbiological and metals) of the collected surface and groundwater samples through a Department of Environment and Natural Resources ("DENR") recognised laboratory

· Analysis of in situ, physio-chemical, microbiological, and metal parameters based on laboratory results

· Preparation and submission of a report

A total of 12 sampling stations comprised of nine surface water and three groundwater-sampling stations were established for the baseline study. Water samples were analysed for physico-chemical (i.e. pH, total suspended solids, total dissolved solids, biological oxygen demand, chemical oxygen demand, oil and grease, nitrates and phosphates), microbiological (i.e. total coliform and faecal coliform) and metals (i.e. arsenic, cadmium, copper, chromium, lead, iron, mercury and zinc) parameters. The analytical results of the freshwater samples were compared to the prescribed criteria of the DENR Administrative Order No. 2016-08 (DAO 2016-08) Water Quality Guidelines (WQG) for Class A waters, while the analytical results for groundwater were compared to the Philippine National Standard for Drinking Water (PNSDW) 2017 values.

Summary

All baseline conditions for dry season water measurement have now been collected and processed within the independent July 2019 report submitted to the Company by GHD. Alongside further environmental studies required for the EIA in due course, the baseline study will allow informed development decisions to be made, working closely with local stakeholders and in full compliance with the laws and regulations of the Philippines. The findings of GHD's report will be communicated to local stakeholders through community engagement. This baseline component has been concluded to a level compliant with local and global reporting standards.

Laurence Read, CEO of Bezant, commented:

"Ensuring the correct environmental baseline studies are in place for a major copper-gold development project, especially in respect to water, is essential. The results of this independent study will be communicated to local and governmental stakeholders and form a key part of the pre-feasibility study programme to ensure that informed, sustainable decisions are made in the future potential construction, consultation and planning stages of Mankayan. Operating within an existing mining area our intention is to support the potential future development of an underground, modern mining operation where ongoing environmental monitoring is in place at all stages in the project's lifespan."

 

For further information, please contact:

Bezant Resources plc

Laurence Read

Chief Executive Officer

 

Colin Bird

Executive Chairman

 

Strand Hanson Limited (Nomad)

James Harris / Matthew Chandler / James Dance

 

Novum Securities Limited (Broker)

Jon Belliss

 

or visit http://www.bezantresources.com

 

Tel: +44 (0)20 3289 9923

 

 

 

 

 

 

Tel: +44 (0)20 7409 3494

 

 

Tel: +44 (0)20 7399 9400 

 

 

 

Qualified Person's Statement

In accordance with the AIM Note for Mining and Oil & Gas Companies, June 2009 (the "Guidance Note"), Colin Bird, CEng, FIMMM, a South African and UK Certified Mine Manager and Executive Chairman of Bezant, with more than 40 years relevant experience, is the qualified person who has reviewed and approved the technical information contained herein.

 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.

 

 

Notes to Editors:

 

Mankayan Cu-Au Project, Philippines

Fly-through videos for the Company's Mankayan copper-gold project located north of Manilla on Luzon island are hosted on "Youku" in both Standard Chinese and English.

菲律Mankayan铜金矿生产开拓计划

The Chinese version can be accessed via the following link: https://v.youku.com/v_show/id_XNDIyNTAwNTc0OA==.html

 

The English version and can be accessed via the following link: https://v.youku.com/v_show/id_XNDIyNTM2MjA3Ng==.html

 

Mankayan has a copper-gold resource estimate completed by Snowden Mining Industry Pty Limited ("Snowden") in 2009 under JORC (2004) which defined an indicated resource of 1.1 million tonnes of contained copper and 3.7 million ounces of contained gold and an inferred resource of 0.2 million tonnes of contained copper and 0.6 million ounces of contained gold.

 

Following the Mining Plus Pty Limited independent economic study completed in February 2019, the Mankayan copper-gold porphyry supports different robust routes for potential future development, including, a Sub-Level Caving ("SLC") 'stepping stone' scenario, with two main Block Caving ("BC") routes identified for progression, from a total of 11 scenarios assessed, with both supporting an average production grade in excess of 0.64% copper equivalent ("CuEq"). 

 

5 year lead time to production: Under all four of the representative options selected for further analysis in the study, the time to initial production was approximately five years and the first five years of production are sequenced in order to deliver production from the higher grade areas of the deposit, in some cases demonstrating average grades achievable of up to 0.77% CuEq* during this initial period.

 

The three main representative options summarised below, taken from the 11 modelled scenarios, comprise two BC scenarios and one SLC 'stepping stone' scenario (the option numbers being those used in the study)

 

The two preferred BC scenarios

Option 4: medium production rate with lower start-up costs than those associated with higher production rate models

US$1,181m net present value ("NPV")*, US$11,647m total revenue, US$19.1/t average cost, 27% internal rate of return before tax and royalty ("IRR"), US$896m start-up Capex

 

Option 8: lower start-up costs, coupled with a good overall project value maintained by ramping-up the production rate after the first footprint

US$797m NPV*, US$11,473m total revenue, US$19.7/t average cost, 21% IRR, US$633m start-up Capex

 

SLC intermediary route

Option 9: a more flexible/low start-up cost SLC method has been determined as an intermediary step towards full block caving scenarios, with start-up Capex of US$529m, a slightly reduced time to first production, a first phase period into higher grade core and US$19.9/t average cost

 

Note:

* The NPV calculated is for comparative purposes only, as full financial analysis was not undertaken for the study. A mean copper price scenario of US$3/lb was used and all costs are mine and processing combined. Due to the current uncertainty surrounding the Philippine tax/royalty rates, neither have been included in the comparison. Inclusion of tax and royalty would reduce the NPV and IRR, but it is expected that the relative economic merits of each scenario would not change significantly.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLEAPXSFELNEEF
Date   Source Headline
6th May 20114:41 pmRNSSecond Price Monitoring Extn
6th May 20114:37 pmRNSPrice Monitoring Extension
27th Apr 20114:40 pmRNSSecond Price Monitoring Extn
27th Apr 20114:35 pmRNSPrice Monitoring Extension
20th Apr 20114:41 pmRNSSecond Price Monitoring Extn
20th Apr 20114:35 pmRNSPrice Monitoring Extension
19th Apr 201111:00 amRNSIssue of Equity
30th Mar 20117:16 amRNSInterim Results
25th Feb 20117:00 amRNSPlacement
19th Jan 20117:00 amRNSPositive Scoping Study at Mankayan Project
12th Jan 20117:00 amRNSChange of Broker
17th Dec 20107:00 amRNSResource Update
10th Dec 201012:35 pmRNSResult of Annual General Meeting
7th Dec 20107:00 amRNSAcquisition
18th Nov 20105:26 pmRNSFinal Results
8th Oct 20104:40 pmRNSSecond Price Monitoring Extn
8th Oct 20104:35 pmRNSPrice Monitoring Extension
23rd Aug 20107:00 amRNSScoping Study Commissioned
18th May 20107:00 amRNSIssue of Equity
17th May 201011:30 amRNSResult of General Meeting
4th May 20107:00 amRNSNotice of General Meeting
25th Mar 20102:31 pmRNSHalf Yearly Report
20th Jan 20107:00 amRNSHolding in Company
24th Dec 200912:00 pmRNSPlacing
22nd Dec 200911:07 amRNSResult of AGM
26th Nov 20097:01 amRNSNotice of AGM 2009
26th Nov 20097:00 amRNSFinal Results for the Year Ended 30 June 2009
5th Nov 20094:40 pmRNSSecond Price Monitoring Extn
5th Nov 20094:35 pmRNSPrice Monitoring Extension
15th Oct 20091:50 pmRNSChange of Name of Nominated Adviser and Broker
27th Aug 20097:00 amRNSHolding in Company & Change of Registered Address
28th Jul 200911:32 amRNSResult of AGM
13th Jul 20097:00 amRNSResource Upgrade, Mankayan Project
3rd Jul 20097:00 amRNSNotice of AGM
30th Jun 20097:00 amRNSMetallurgical Testwork Results, Mankayan Project
23rd Jun 20098:00 amRNSMankayan Project
31st Mar 20097:45 amRNSInterim Results
21st Jan 20097:00 amRNSMankayan Project
9th Jan 20091:38 pmRNSHolding(s) in Company
5th Jan 20097:00 amRNSHolding in Company
23rd Dec 20087:00 amRNSAnnual Report and Accounts
19th Dec 20087:00 amRNSNotice of Substantial Share Holder
4th Dec 20087:00 amRNSChange of Directors and Change of Advisor
8th Oct 200811:50 amRNSResult of AGM
6th Oct 20087:00 amRNSDrilling Results for Mankayan Project
17th Sep 200811:19 amRNSNotice of AGM
21st Jul 20087:00 amRNSResource Update
15th Jul 20087:00 amRNSDrilling Report for Mankayan
11th Jun 20087:00 amRNSMankayan Project
6th May 20087:02 amRNSMemorandum of Understanding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.