Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBase Resources Regulatory News (BSE)

Share Price Information for Base Resources (BSE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 13.625
Bid: 13.50
Ask: 13.75
Change: 0.00 (0.00%)
Spread: 0.25 (1.852%)
Open: 13.625
High: 13.625
Low: 13.625
Prev. Close: 13.625
BSE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bumamani PFS supports extension to Kwale mine life

3 Sep 2021 07:49

BASE RESOURCES LIMITED - Bumamani PFS supports extension to Kwale mine life

BASE RESOURCES LIMITED - Bumamani PFS supports extension to Kwale mine life

PR Newswire

London, September 3

AIM and Media Release 

3 September 2021

BASE RESOURCES LIMITEDBumamani PFS supports extension of Kwale mine life to mid-2024

Key outcomes

The Bumamani PFS concludes that it is economically feasible to mine higher-grade subsets of the Bumamani and Kwale North Dune deposits concurrently with the Kwale South Dune deposit, which would extend the mine life of Kwale Operations by 7.5 months to July 2024. Estimated 11.4 million tonnes of material to be mined to produce an estimated 34,000 tonnes of rutile, 113,000 tonnes of ilmenite and 13,000 tonnes of zircon. The Bumamani PFS is a significant further forward step in achieving Base Resources’ goal of extending the mine life at Kwale, providing additional time to develop further opportunities within Kenya whilst maintaining operational continuity. A definitive feasibility study is now underway to improve the accuracy of project estimates.

African mineral sands producer and developer, Base Resources Limited (ASX & AIM: BSE) (Base Resources) has completed a pre-feasibility study on the potential for mining higher grade subsets of the Bumamani and Kwale North Dune deposits (Bumamani PFS) to extend mine life at its 100% owned and operated mineral sands operations in Kwale County, Kenya (Kwale Operations).

The Bumamani PFS has concluded that it is economically feasible to mine smaller, higher-grade subsets of the Bumamani deposit and the Kwale North Dune deposit (referred to as P199) concurrently with the Kwale South Dune deposit, which would extend the mine life of Kwale Operations by 7.5 months to July 2024. This extension would provide additional time for Base Resources to develop further opportunities within Kenya, and the region, while maintaining operational continuity. A definitive feasibility study is now underway to improve the accuracy of project estimates.

The Bumamani PFS was undertaken after an earlier pre-feasibility study on mining significantly larger subsets of the North Dune and Bumamani deposits concluded this was not viable due to the low combined heavy mineral grade, high upfront capital costs, elevated slimes content and associated tailings disposal costs1.

The North Dune Mineral Resources are estimated at 194 million tonnes (Mt) (119 Mt Measured, 73 Mt Indicated and 2 Mt Inferred) at an average heavy mineral (HM) grade of 1.5% for 2.9 Mt of contained HM, and the Bumamani Mineral Resources are estimated at 5.9 Mt (3.0 Mt Measured, 2.6 Mt Indicated and 0.3 Mt Inferred) at an average HM grade of 1.9% for 0.115 Mt of contained HM. The subsets of these Mineral Resource estimates considered for the Bumamani PFS totalled 11.4 Mt of material at an average HM grade of 2.3% for 0.26Mt of contained HM. Of this 11.4 Mt of material, 60% is categorised as Measured and 40% as Indicated.

The Bumamani and North Dune deposits are situated within Kwale Prospecting Licence PL/2018/0119 (PL119), but outside Special Mining Lease 23 (SML 23), which lies within PL119 – see Figure 1, which is included in the full PDF version of this announcement, available from Base Resources’ website: https://baseresources.com.au/investors/ announcements/. The Bumamani PFS assumes that mining tenure will be obtained by way of a further extension of SML 23 to incorporate the Bumamani deposit and the P199 section and that a royalty of 5% would be payable to the Government of Kenya.

Capital cost is estimated at US$13.6 million for the acquisition of land and the additional mine services and infrastructure that will be required. Mining operations would use existing hydraulic mining units relocated from the South Dune and the mined material would be processed through Kwale Operations’ existing concentrator and mineral separation plants.

To maximise mining rates and better manage tailings, it is envisaged that the Bumamani deposit and the P199 section would be mined concurrently with the South Dune deposit, commencing from early 2023, with all deposits then being depleted at approximately the same time in July 2024.

The majority of fine tailings would be accommodated within Kwale Operations’ current tailings storage facility while coarse tailings would be used for land rehabilitation across Kwale Operations. It is anticipated that approximately 25% of the fine tailings from all mining would be co-disposed with coarse tailings to create a water retention layer as part of land rehabilitation.

Set out below are the key outcomes and other key assumptions for the Bumamani PFS.

Upfront capitalUS$ millions13.6
Total rutile producedtonnes34,000
Total ilmenite producedtonnes113,000
Total zircon producedtonnes13,000
Mining - Operating costs inclusive of 5% royaltyUS/t mined4.83*
Production - Operating costs inclusive of 5% royaltyUS$/t produced261*
Rutile price – average over 2023/2024US$/t FOB$1,400
Ilmenite price – average over 2023/2024US$/t FOB$183
Zircon price – average over 2023/2024US$/t FOB$1,775

*Average operating costs for Kwale Operations from early 2023 to July 2024 following commencement of mining at the Bumamani deposit and assuming concurrent mining with the Kwale South deposit.

Operating cost per tonne mined is consistent with current Kwale Operations performance but operating costs per tonne produced will be higher as a consequence of the lower heavy mineral grade resulting in lower production. On the basis of the above outcomes, and subject to the above assumptions, the Bumamani PFS has forecast net post-tax cash flows totalling US$16.5 million.

Assumed average product prices were derived from Base Resources’ internal price forecasts, determined based on supply/demand analysis and taking into account relevant data from independent industry consultants, TZMI, and are not materially different to TZMI’s average forecast prices over the same period.

Following the completion of an Environmental and Social Impact Assessment, Base Resources’ wholly owned Kenyan subsidiary, Base Titanium Limited, has now received an Environmental Impact Assessment Licence from the National Environment Management Authority to extend mining activity into the Bumamani and P199 deposits once it has secured mining tenure over these areas.

A key risk identified for this Kwale mine life extension opportunity is the ability to secure mining tenure for the Bumamani and P199 deposits on reasonable terms by mid-2022, either by way of a variation to extend SML 23 or the grant of a new mining licence under the Kenyan Mining Act 2016 subject to an equivalent fiscal regime to the regime applicable to SML 23. Another key risk is the ability to complete the necessary land acquisitions at reasonable prices and in line with the proposed mine schedule. Failure to achieve either of these outcomes could impact the viability of this extension opportunity. While plans have been developed to actively manage and mitigate these issues to the extent possible, as they require engagement with and action by third parties, residual risk remains.

[Note (1): For further information, refer to Base Resources’ market announcement on 1 April 2021 “Kwale North Dune PFS outcomes” available at https://baseresources.com.au/investors/announcements/.]

Mineral Resources estimates and production and forecast financial information

The information included in this announcement about the estimated Mineral Resources for the Kwale North Dune and Bumamani deposits has been extracted from Base Resources’ ASX announcement titled “Updated Kwale North Dune and maiden Bumamani Mineral Resource estimates” dated 19 February 2021, which is available at https://baseresources.com.au/investors/announcements/. Base Resources confirms that it is not aware of any new information or data that materially affects the information included in this announcement and all material assumptions and technical parameters underpinning the estimate continue to apply and have not materially changed.

The information included in this announcement about the subsets of the estimated Mineral Resources for the Kwale North Dune and Bumamani deposits is based on, and fairly represents, information and supporting documentation prepared by Mr. Scott Carruthers. Mr. Carruthers is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Carruthers is employed by Base Resources, he holds equity securities in Base Resources, and is entitled to participate in Base Resources’ long-term incentive plan and receive equity securities under that plan. Details about that plan are included in Base Resources’ 2021 Annual Report. Mr. Carruthers has sufficient experience that is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as Competent Persons as defined in the JORC Code and is considered a Qualified Person for the purposes of the AIM Rules for Companies. Mr. Carruthers has reviewed this announcement and consent to the inclusion in this announcement of the information about the subsets of the estimated Mineral Resources for the Kwale North Dune and Bumamani deposits in the form and context in which the relevant information appears.

The estimated Mineral Resources underpinning the production and forecast financial information included in this announcement have been prepared by Competent Persons in accordance with the JORC Code.

Forward Looking Statements

The Bumamani PFS is based on technical, economic and other conditions and information as at the date of this announcement, which may be subject to change. Accordingly, the information and conclusions presented in this announcement should be viewed in this light. Information in this announcement should also be read in conjunction with other announcements made by Base Resources to ASX.

Certain statements in or in connection with this announcement contain or comprise forward looking statements. Such statements may include, but are not limited to, statements with regard to capital cost, operating cost, future production and available grades, product prices, and financial performance and may be (but are not necessarily) identified by the use of phrases such as “will”, “expect”, “anticipate”, “believe” and “envisage”. By their nature, forward looking statements involve risk and uncertainty because they relate to events and depend on circumstances that will occur in the future and may be outside Base Resources’ control. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in product prices and exchange rates and business and operational risk management. Some risks that could impact Base Resources' ability to achieve the outcomes or results expressed or implied by such statements are disclosed in this announcement. Subject to any continuing obligations under applicable law or relevant stock exchange listing rules, Base Resources undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events.

ENDS.

For further information contact:

James Fuller, Manager Communications and Investor RelationsUK Media Relations
Base ResourcesTavistock Communications
Tel: +61 (8) 9413 7426Jos Simson and Gareth Tredway
Mobile: +61 (0) 488 093 763Tel: +44 (0) 207 920 3150
Email: jfuller@baseresources.com.au 

About Base Resources

Base Resources is an Australian based, African focused, mineral sands producer and developer with a track record of project delivery and operational performance. The company operates the established Kwale Operations in Kenya and is developing the Toliara Project in Madagascar. Base Resources is an ASX and AIM listed company. Further details about Base Resources are available at www.baseresources.com.au

PRINCIPAL & REGISTERED OFFICELevel 3, 46 Colin StreetWest Perth, Western Australia, 6005Email: info@baseresources.com.auPhone: +61 (0)8 9413 7400Fax: +61 (0)8 9322 8912

NOMINATED ADVISORRFC Ambrian LimitedStephen AllenPhone: +61 (0)8 9480 2500

JOINT BROKERBerenbergMatthew Armitt / Detlir EleziPhone: +44 20 3207 7800

JOINT BROKERCanaccord GenuityRaj Khatri / James Asensio / Patrick DolaghanPhone: +44 20 7523 8000 

Date   Source Headline
14th Dec 20228:00 amPRNNotice of change of interests by Significant Shareholder
1st Apr 20228:12 amPRNFinal director’s interest and LTIP update
30th Mar 20227:00 amPRNChange of PDMR interests
16th Mar 20227:00 amPRNAmount of Interim Dividend in GBP
10th Mar 20229:04 amPRNChange of Director interests
4th Mar 20227:00 amPRNUpdated Securities Trading Standard
4th Mar 20227:00 amPRNLTIP performance rights update
28th Feb 20227:00 amPRNFY22 Half-Year Results
28th Feb 20227:00 amPRNFY22 Interim Dividend – Key dates and information
21st Feb 20227:00 amPRNFY22 half-year results investor webcasts
25th Jan 20227:00 amPRNQuarterly Activities Report – December 2021
13th Jan 20227:43 amPRNForfeiture of performance rights
3rd Dec 20217:00 amPRNModern Slavery Statement for FY21
2nd Dec 20217:00 amPRN2021 LTIP Cycle Performance Rights
26th Nov 20217:18 amPRNAmended Constitution
26th Nov 20217:18 amPRNResults of 2021 Annual General Meeting
26th Nov 20217:00 amPRNChair's Address to 2021 AGM
10th Nov 20217:00 amPRNTZMI Virtual Congress 2021 Presentation
27th Oct 20217:00 amPRNNotice of 2021 Annual General Meeting
26th Oct 20217:16 amPRN2021 LTIP cycle performance rights
22nd Oct 20217:00 amPRNBase Resources management change
22nd Oct 20217:00 amPRNBase Resources Chair and Board succession
19th Oct 20217:00 amPRNQuarterly Activities Report – September 2021
14th Oct 20217:38 amPRNLTIP performance rights update
7th Oct 20217:00 amPRNDisclosure under Guidance Note 20 - Equity Derivatives
5th Oct 202110:49 amPRNNotice of change of Significant Shareholder
1st Oct 20217:00 amPRN2021 Annual General Meeting details
30th Sep 20217:00 amPRNKwale lease extension & royalty discussions finalised
28th Sep 20217:01 amPRNNotice of change of Significant Shareholder
27th Sep 20218:12 amPRNDFS2 Enhances Scale and Economics of the Toliara Project
27th Sep 20217:00 amPRNUpdated Ranobe Resources and Reserves Estimates
15th Sep 20218:16 amRNSAmount of FY21 Final Dividend in GBP
7th Sep 202111:08 amPRNNotice of change of Significant Shareholder
3rd Sep 20219:40 amPRNFurther supporting information for Bumamani PFS
3rd Sep 20217:49 amPRNBumamani PFS supports extension to Kwale mine life
1st Sep 20217:00 amPRNPresentation - Africa Down Under
31st Aug 20217:00 amPRNFY21 Full-Year Dividend – Key dates and information
31st Aug 20217:00 amPRNAnnual Financial Report – period ended 30 June 2021
23rd Aug 20217:00 amPRNFY21 Full Year Results Investor Webcasts
20th Aug 20217:00 amPRNUpdated Kwale South Mineral Resources and Ore Reserves
20th Aug 20217:00 amPRN2021 Mineral Resources and Ore Reserves Statement
18th Aug 20218:55 amPRNNotice of change of Significant Shareholder
29th Jul 20217:00 amPRNQuarterly Activities Report – June 2021
14th Jul 20217:00 amPRNKwale SML 23 extension - update
16th Jun 202110:42 amPRN121 Mining Investment APAC Presentation
8th Jun 20217:00 amPRNAppointment of Canaccord Genuity as Joint Broker
21st May 202110:56 amPRNNotice of change of Significant Shareholder
13th May 20214:40 pmRNSSecond Price Monitoring Extn
13th May 20214:35 pmRNSPrice Monitoring Extension
30th Apr 20217:14 amPRNChange of Registered Office

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.