7,000m Drilling Programme

14 Feb 2025 07:00

RNS Number : 0811X
Blencowe Resources PLC
14 February 2025
 

Date: 14 February 2025

Blencowe Resources Plc

("Blencowe" or the "Company")

 

Blencowe Advances 7,000m Drilling Programme at Orom-Cross

 Expanded campaign targeting significant JORC Resource & Reserve upgrade

 

Blencowe Resources Plc (LSE: BRES) is pleased to provide an update on its 7,000 meter drilling programme, currently underway at the Orom-Cross graphite project in Uganda.

 

Drilling Programme Highlights:

· Geotechnical Drilling Completed at Camp Lode: Four holes drilled (70m per hole), providing critical data for mine design and safety parameters.

· Additional Drill Rig Mobilised: A second rig have arrived, with a third scheduled this week to accelerate the drilling campaign.

· Site Inspection by DGSM and EU: Ugandan Mines Inspectors and an EU representative visited Orom-Cross, evaluating the project's progress and potential funding support.

 

Blencowe has successfully completed all geotechnical holes at the Camp Lode deposit, a key requirements for finalising mining design parameters. Logging and sampling of three holes is also complete with all four holes confirming mineralisation over the majority of the length (70m per hole).

The drilling programme is structured in three phases:

1. Geotechnical drilling (now completed).

2. Infill drilling at the two existing deposits to increment Reserves (Camp Lode deposit and Northern Syncline deposit).

3. Step-out drilling to consider a newly identified potential higher grade deposit to the south (to increase the overall Resource size).

Blencowe aims to achieve a substantial increase to both JORC Resources and Reserves, positioning Orom-Cross for higher production levels as well as longer life of mine within the DFS.

With several new potential offtake opportunities opening, including the possibility of large volumes of graphite concentrate to be sold into the EU's SAFELOOP initiative, Blencowe is seeking to aggressively add to both Resource and Reserves at Orom-Cross to scale production. It is believed that this will make a substantial difference to the DFS outcome.

Government & EU Engagement

This past week, Orom-Cross hosted officials from the at the Ugandan Directorate of Geological Survey and Mines (DGSM), alongside a local government representative, who reviewed site progress and the overall work area. The DGSM expressed satisfaction with the project's advancement.

Additionally, a European Union Representative conducting a fact-finding mission to assess Uganda's critical mineral projects (including Orom-Cross) was hosted, which opens a new channel in relation to potential EU funding support for strategic raw materials.

 

Cameron Pearce, Executive Chairman, commented:

"We continue to make strong progress with this drilling campaign, a critical final step in delivering an expanded DFS for Orom-Cross. The infill drilling is expected to significantly upgrade our Reserves, while the step-out drilling in the south presents an exciting opportunity to materially expand our overall Resource base. We are particularly eager to test a completely new deposit in this region, which, if successful, could further demonstrate the immense scale and potential of the graphite mineralisation at Orom-Cross which has previously been estimated at 2-3 billion tonnes.

 

With increasing demand for graphite, particularly through initiatives like SAFELOOP, expanding our production capacity becomes a key focus. Graphite is recognised as a strategic and critical mineral worldwide, and Orom-Cross is positioned to play a significant role in global supply chains.

 

We have also included some photos and drone footage from site below, which we hope provides investors and stakeholders with valuable insight into the scale of the programme and the progress being made. With 7,000m of drilling planned, including 280m completed so far, we look forward to providing regular updates as the programme advances."

 

Figure 1: Core samples from Camp Lode deposit (Feb 2025)

 

Figure 2: Site visit from DGSM to better understand drilling program (Feb 2025)

 

Figure 3: Rig setup and drilling the 1st Geotechnical hole

 

Figure 4: Drill rig set up and drilling the 1st geotechnical hole

 

Figure 5: Access road to the Northern Syncline deposit

 

Figure 6: Exploration camp showing temporary tent accommodation and the area cleared in preparation of the permanent camp arrival in mid-February

 

 

 

For further information please contact:

 

Blencowe Resources Plc

Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

 

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

 

Tavira Financial 

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavira.group

 

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

 

 

 

 

 

 

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger coarse flakes within the deposit.

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit. Blencowe completed a successful Pre-Feasibility Study on the Project in July 2022 and is now within the Definitive Feasibility Study phase as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with an initial JORC Indicated & Inferred Mineral Resource of 24.5Mt @ 6.0% TGC (Total Graphite Content). This Resource has been defined from only ~2% of the total tenement area which presents considerable upside potential ahead. Development of the resource is expected to benefit from a low strip ratio and free dig operations together with abundant inexpensive hydro-electric power off the national grid, thereby ensuring low operating costs. With all major infrastructure available at or near to site the capital costs will also be relatively low in comparison to most graphite peers.

In 3Q 2024 Blencowe introduced a Joint Venture concept with experienced downstream graphite processing partners to ultimately produce upgraded 99.95% SPG in Uganda. This strategy has several key advantages plus substantial cost savings which will assist deliver a world class project once DFS is completed.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLSFEFWDEISEFE
Date   Source Headline
9th Oct 20204:03 pmRNSTR-1: Standard form notification of major holdings
7th Oct 20209:47 amRNSTR-1: Standard form notification of major holdings
6th Oct 202012:59 pmRNSIssue of Equity
21st Sep 20207:00 amRNSSamples Sent for Assay to Deliver Maiden Resource
18th Aug 20207:00 amRNSTR-1: Standard form notification of major holdings
17th Aug 202010:22 amRNSUpdated presentation on the company website
10th Aug 20207:00 amRNSFirst Stage Value-Add Completed at Orom-Cross
4th Aug 20207:00 amRNSAppointment of SGS Lakefield
20th Jul 20207:00 amRNSJORC Resource Drilling Program Completed
16th Jul 20203:57 pmRNSTR-1: Standard form notification of major holdings
2nd Jul 20207:00 amRNSPhase 1 Drilling Program Update
16th Jun 20207:00 amRNSUpdate on the High-Grade Graphite Zone
2nd Jun 20207:00 amRNSHalf-year Report
27th May 20207:00 amRNSNew High-Grade Graphite Zone Identified
11th May 20207:00 amRNSRecommencement of metallurgical test work
5th May 20201:32 pmRNSTR-1: Notification of major holdings
5th May 20207:00 amRNSNew Research Initiation
4th May 20209:29 amRNSDrill Programme to Restart at Orom-Cross Project
30th Apr 20205:31 pmRNSHolding(s) in Company
30th Apr 20203:58 pmRNSInitiation Report
28th Apr 20207:00 amRNSAcquisition of the Orom-Cross Graphite Project
23rd Apr 202010:42 amRNSResult of AGM
30th Mar 20204:37 pmRNSPublication of Prospectus & Notice of AGM
30th Jan 20202:54 pmRNSAnnual Financial Report
22nd Jan 20209:27 amRNSConditional Placing and Acquisition Update
28th Oct 20194:19 pmRNSAcquisition of the Orom Graphite Project in Uganda
30th Aug 20197:00 amRNSHalf-year Report
13th May 20197:30 amRNSSuspension - Blencowe Resources Plc
13th May 20197:30 amRNSProposed Acquisition Of Orom Graphite Project
23rd Apr 20197:00 amRNSHolding(s) in Company
18th Apr 20197:00 amRNSAdmission to Trading and First Day of Dealings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.