Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBotswana Diam Regulatory News (BOD)

Share Price Information for Botswana Diam (BOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.325
Bid: 0.30
Ask: 0.35
Change: 0.00 (0.00%)
Spread: 0.05 (16.667%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.325
BOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on South African Exploration Projects

6 Jun 2018 07:00

RNS Number : 4123Q
Botswana Diamonds PLC
06 June 2018
 

 

6 June 2018

Botswana Diamonds PLC

("Botswana Diamonds" or the "Company")

 

Update on South African Exploration Projects

 

The board of Botswana Diamonds (AIM: BOD) are pleased to provide an update on the Company's exploration projects in South Africa. 

 

Headlines:

· Botswana Diamonds has been awarded the priority 2.5 hectare Mooikloof kimberlite pipe concession close to De Beers' flagship Venetia Mine.

· The Technical and Economic Study on Thorny River is completed and Botswana Diamonds is now evaluating its options for the project.

· Drilling shows Ontevreden kimberlite pipe to be smaller than expected. No further work is warranted, as we have higher potential targets.

 

Mooikloof

The award of the Mooikloof Prospecting Licence is an important development for Botswana Diamonds. Mooikloof is a known 2.5 hectare diamondiferous kimberlite pipe last prospected in 1986. The adjacent Oaks mine was owned and successfully operated by De Beers. The Oaks mine had a grade of 53 carats per hundred tonne of ore ("cpht") at a value of $156 per carat. The large flagship Venetia mine, operated by De Beers, is close by and in the same general geology.

 

Based on our experience elsewhere, we suspect that past explorers may have systematically under-estimated the kimberlite pipe size, grade and diamond quality of the Mooikloof kimberlite. We will deploy state-of-the-art exploration techniques to reassess the Mooikloof kimberlite, and maybe open another by-passed kimberlite pipe development.

 

Thorny River

The company has now received the Technical Economic Evaluation Report ("TEE Report") on the Thorny River Project. The deposit is between 1.2 and 2 million tons, the grade is between 46 and 74 cpht and carat values between US$120 and US$220 per carat. The TEE Report indicated positive economics could potentially be achieved using the top end of the grade and value ranges, assuming additional kimberlite volume of similar grade and value can be defined with further exploration.

 

While not a Scoping Study as the Company had previously envisaged in the announcements dated 15 February 2018 and 21 March 2018, the TEE Report has provided the Company's Directors with sufficient information to conclude that the Thorny River Project requires further investigation. Consequently, the directors are considering the Company's various technical and commercial options, which will be studied simultaneously with ongoing exploration.

 

Ontevreden Exploration

Drilling at Ontevreden confirmed the existence of a kimberlite pipe, but showed the pipe to be smaller than the previously indicated geophysical anomaly. Given our attractive priorities elsewhere, we now propose no further work on Ontevreden.

 

John Teeling, Chairman, commented: "Significant progress has been made on our joint venture projects in South Africa.

 

"We are pleased to finally be awarded the Mooikloof concession. This was discovered and explored in the 1980s by De Beers who went on to develop the Oaks mine next door. The pipe is historically estimated at 2.5 hectares in size and contains diamonds. Using recently developed exploration techniques we will re-assess this high potential pipe.

 

"Analysis shows that a mine on the Thorny River deposit could be profitable assuming positive results from additional exploration. Now we must refine the volume, grade and value estimates while working on the mining model.

 

"But modern mineral exploration technology is not a magic bullet. Modern geophysics indicated a 0.7 hectare pipe at Ontevreden. Our drilling confirmed a smaller pipe, which is not currently commercial".

 

 

 

This release has been approved by James Campbell, Managing Director of Botswana Diamonds plc, a qualified geologist (Pr.Sci.Nat), a Fellow of the South African Institute of Mining and Metallurgy, a Fellow of the Institute of Materials, Minerals and Mining with over 32-years' experience in the diamond sector.

 

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

 

ENDS

 

 

Enquiries:

 

Botswana Diamonds PLC

John Teeling, Chairman

+353 1 833 2833

James Campbell, Managing Director

+27 83 457 3724

Jim Finn, Director

Northland Capital Partners Limited

David Hignell/Dugald J Carlean (Corporate Finance)

+44 (0) 203 861 6625

John Howes (Broking)

SVS Securities Plc

+44 (0) 203 700 0100

Tom Curran

Ben Tadd

Blytheweigh

+44 (0) 207 138 3204

Camilla Horsfall

+44 (0) 781 784 1793

Nick Elwes

+44 (0) 783 185 1855

Teneo PSG

Luke Hogg

+353 (0) 1 661 4055

Alan Tyrrell

+353 (0) 1 661 4055

 

www.botswanadiamonds.co.uk

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDUVRBRWWANRAR
Date   Source Headline
7th Oct 20157:00 amRNSExploration Update on Drilling in Orapa
11th Sep 20157:00 amRNSExploration Update
3rd Sep 20157:00 amRNSUpdate on Exploration in Botswana
19th Jun 20154:06 pmRNSCompany Presentation
18th Jun 20157:47 amRNSExploration Update - June 2015
1st May 201511:15 amRNSChange of Adviser
15th Apr 20157:00 amRNSCompany Expands Exploration with 3 New Licences
8th Apr 20152:53 pmRNSIssue of Shares and Directors' Dealings
31st Mar 201510:24 amRNSBotswana Diamonds Fundraising
27th Mar 20157:00 amRNSInterim Results
24th Mar 20157:00 amRNSNew Licence in Orapa, Botswana
11th Mar 20154:40 pmRNSSecond Price Monitoring Extn
11th Mar 20154:35 pmRNSPrice Monitoring Extension
5th Mar 20157:00 amRNSField Exploration Update - Orapa, Botswana
23rd Feb 20154:40 pmRNSSecond Price Monitoring Extn
23rd Feb 20154:35 pmRNSPrice Monitoring Extension
19th Dec 201412:39 pmRNSResult of AGM
24th Nov 20147:00 amRNSPreliminary Results for Year Ended 30 June 2014
2nd Oct 20147:00 amRNSDrilling Update at Orapa
18th Sep 20147:00 amRNSDrilling Update at Orapa
2nd Sep 201411:30 amRNSNon-Executive Director Appointment
13th Aug 20147:00 amRNSExploration in Orapa, Botswana
8th Aug 20147:00 amRNSDrilling Programme in Orapa
20th Jun 20147:00 amRNSIssue of Equity and Directors' Shareholding
5th Jun 20147:00 amRNSFirst results on PL117 exploration programme
2nd Jun 20147:00 amRNSLiquidation of Interest in Bugeco
27th May 20147:00 amRNSNew Licences awarded in Orapa region of Botswana
30th Apr 20147:00 amRNSInitial Outcome of Fieldwork at PL117 Licence
31st Mar 20147:00 amRNSInterim Results
26th Mar 20147:00 amRNSCompletion of initial fieldworks at PL117 licence
19th Feb 20147:00 amRNSAlrosa Geologists join Botswana team
4th Feb 201411:31 amRNSIssue of Equity
31st Jan 201410:03 amRNSTotal Voting Rights
30th Jan 20147:00 amRNSAppointment of Joint Broker
20th Jan 201412:11 pmRNSIssue of Equity
14th Jan 20147:00 amRNSPL117 Exploration Work Underway
2nd Jan 201410:50 amRNSTotal Voting Rights
20th Dec 201312:30 pmRNSResult of AGM
20th Dec 20137:00 amRNSAGM Statement
13th Dec 20137:00 amRNSFundraising of £740,000
22nd Nov 20137:00 amRNSPreliminary Results for the Year Ended 30 June 13
19th Aug 20137:00 amRNSJoint Venture in Botswana
7th Aug 20137:00 amRNSEversharp Investments Joint Venture Agreed
31st Jul 20137:00 amRNSBrightstone Joint Venture Agreed on 13 Licences
2nd May 20137:00 amRNSExtension of agreement on licences in Botswana
11th Apr 20137:00 amRNSOption agreement on prospecting licence
25th Mar 20137:00 amRNSInterim Results
19th Mar 20137:00 amRNSOption Agreement on two licences in Mozambique
12th Feb 20138:47 amRNSNew Broker in Botswana Appointed
5th Feb 20137:00 amRNSAgreement on 13 prospecting licences

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.