Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

Share Price is delayed by 15 minutes
Get Live Data
24.70    -0.70 (-2.76%)
Bid:
24.00
Ask:
25.40
Spread: 1.40 (5.833%)
Market Cap: £110.23m
BKY Live PriceLast checked at - London Stock Exchange

Intraday Berkeley Eng Share Chart

Quarterly Update

31 Jul 2007 08:36

Berkeley Resources Limited31 July 2007 QUARTERLY ACTIVITIES REPORT To the Australian Stock Exchange For the Quarter Ended 30th June 2007 KEY DEVELOPMENTS • Initial JORC compliant resource of 11.9 million lbs of U3O8 at a grade of 0.072% calculated for the Retortillo and Zona 7 Deposits in the Salamanca I license. • Initial drill testing extends the Retortillo mineralisation 400 m to the southeast. • Initial diamond drill testing of the Zona 7 mineralisation and its potential for extensions was commenced. • Extensions of the Zona 7 ground radiometric anomaly identified a significantly larger radiometric anomaly extending beyond the current tenements. New tenement applications have been made. • Positive results from initial metallurgical test work, with recoveries of U3O8 exceeding 90% on all samples. • Initial drill testing of the defined Saguazal prospect targets in Caceres III was completed. • Acquisition of five new exploration areas, increasing the Company's holding to over 208,000 ha. • Completed a placement of 12.5m shares at $1.85 per share, raising $23.1M (£9.65M), with institutional investors in North America, Europe and Australia. • Mr Scott Yelland joined the Company as Chief Operating Officer. Enquiries - Matt Syme Telephone: +61 417 906717 Managing Director Email: info@berkeleyresources.com.au ACN 052 468 569 Level 9, BGC Centre, 28 The Esplanade, Perth WA 6000 Tel: + 618 9322 6322, Fax: + 618 9322 6558 PO Box Z5083, Perth WA 6831,Australia 1. EXPLORATION SALAMANCA PROVINCE Following completion of the initial JORC compliant resource calculation of 11.9million lbs of U3O8 for the Retortillo and Zona 7 Deposits in the Salamanca Ilicense in early April, exploration in Salamanca Province focussed on drilltesting potential extensions to the southeast of the main Retortillo resourceand extending confirmatory drilling at the Zona 7 deposit. Results to dateconfirm significant extensions to the Retortillo deposits, including 400m alongstrike to the southeast. . Extensions of the ground radiometric survey at Zona 7 defined a largerradiometric anomaly extending >1km to the north of the Mina Cristina area.Historic radiometric data indicates that this anomaly extends for another 5kmto beyond the Salamanca I tenement, resulting in new ground acquisition.Assessment of low resolution regional radiometrics elsewhere in Salamanca alsoresulted in new tenement applications. SALAMANCA 1 Retortillo Re-interpretation of the historic JEN and ENUSA drill data, guided byconfirmatory Berkeley diamond drilling provided the basis of 3D models of theRetortillo and Zona 7 deposits and calculation of JORC compliant resourcesearly in the quarter. The results of this calculation are summarised in the following table. INFERRED RESOURCES AT RETORTILLO & ZONA 7 (200ppm cut-off) Ore Tonnes Grade Contained Resource (Mt) (ppm U3O8) (Mlb U3O8) Retortillo 6.8 720 10.8 Zona 7 0.62 760 1.1 TOTAL 7.42 723 11.9 Subsequent extension and confirmatory drilling at Retortillo was focussed inthe southeast sector. Eleven diamond holes (totalling 1053.3m), six RC holes(totalling 559m) and one roto-percussion hole and six pre-collars (totalling116m) were completed by the end of the Quarter. This work extended the southeastlimit of mineralisation by 400m and full details, including assays received todate, are attached as Appendix 1. Notable intersections (at a cut-off of 200ppm U3O8) include:- Hole RTO-018 3.00 metres @ 0.0696% U3O8 from 66.50m 9.50 metres @ 0.058% U3O8 from 83.00m Hole RTO-024 2.30 metres @ 0.035% U3O8 from 60.90m 2.80 metres @ 0.049% U3O8 from 76.00m Hole RTOR-025 14.00 metres @ 0.0918% U3O8 from 20.00m Hole RTOR-026 11.00 metres @ 0.0547% U3O8 from 43.00m Hole RTO-027 2.00 metres @ 0.2467% U3O8 from 62.00m 2.00 metres @ 0.0904% U3O8 from 69.00m Hole RTO-033 2.05 metres @ 0.132% U3O8 from 63.30m Hole RTO -035 1.80 metres @ 0.048% U3O8 from 54.8m All holes were geologically and radiometrically logged before being sampled (1/4core) at approximately 1m intervals (intervals varied from 0.5 to 1.5m based ongeology) Duplicate 1/4 core samples and blank samples were included and allsamples were assayed for total uranium by the Delayed Neutron Count (DNC) methodat Activation Laboratories Limited in Ontario, Canada. Check assays at otherlaboratories (including ENUSA and ALS ChemEx), and acid soluble U assays and Thanalyses, are being completed on selected samples, based on an assessment of theinitial assay data. ALS Chemex analysed approx 5 % of the samples using XRF, andtheir results indicate acceptable repeatability and mean percentage differencesof < 6% for
Date   Source Headline
6th Jul 20177:00 amRNSSalamanca Capital costs reduced by 1% to EUR 82.3M
4th Jul 20175:04 pmRNSHolding(s) in Company
16th Jun 20179:32 amRNSInitial Director's Interest Notice
12th Jun 20177:00 amRNSCo-Founder of Majedie appointed as a Director
9th Jun 20177:02 amRNSInitial Director's Interest Notice
9th Jun 20177:00 amRNSFinal Director's Interest Notice
7th Jun 20177:00 amRNSFormer senior Rio Tinto executive appointed
5th Jun 20177:00 amRNSExploration Programme Targeting Zona 7 Deposits
26th May 20178:35 amRNSIssue of Shares and Appendix 3B
28th Apr 20177:00 amRNSMarch 2017 Quarterly Report
24th Apr 20177:00 amRNSPre-construction activities advancing at Salamanca
21st Mar 20177:00 amRNSHolding(s) in Company
21st Mar 20177:00 amRNSEU approval of Salamanca mine offtake contract
20th Mar 20174:05 pmRNSHolding(s) in Company
17th Mar 20177:00 amRNSHigh grade intercepts at Zona 7 & Exploration JV
15th Mar 20177:00 amRNSHalf-year Report
20th Feb 20179:34 amRNSHolding(s) in Company
8th Feb 201710:35 amRNSHolding(s) in Company
7th Feb 20177:00 amRNSDirector/PDMR Shareholding
31st Jan 20177:00 amRNSDecember 2016 Quarterly Report
23rd Dec 20167:00 amRNSIssue of shares and Appendix 3B
20th Dec 20163:58 pmRNSHolding(s) in Company
20th Dec 20167:00 amRNSBerkeley takes another step towards construction
19th Dec 20165:43 pmRNSHolding(s) in Company
16th Dec 20167:00 amRNSAppendix 3B
14th Dec 20167:00 amRNSResult of Meeting
6th Dec 20167:00 amRNSMajor land acquisition completed at Salamanca mine
28th Nov 20167:00 amRNSOfftake Agreement Concluded with Interalloys
22nd Nov 20168:27 amRNSResult of AGM
14th Nov 20163:58 pmRNSHolding(s) in Company
14th Nov 20167:00 amRNSNotice of General Meeting
11th Nov 20167:00 amRNSHolding(s) in Company
10th Nov 201612:10 pmRNSHolding(s) in Company
7th Nov 20165:33 pmRNSHolding(s) in Company
7th Nov 20165:29 pmRNSHolding(s) in Company
4th Nov 20162:07 pmRNSResults of Placing
4th Nov 20167:00 amRNSProposed Placing to raise US$25 to US$30 million
26th Oct 20167:00 amRNSSeptember 2016 Quarterly Report
21st Oct 20167:33 amRNSNotice of AGM and Annual Report
13th Oct 20161:04 pmRNSHolding(s) in Company
11th Oct 20167:00 amRNSInfrastructure development underway at Salamanca
28th Sep 20168:48 amRNSIssue of Ordinary Shares and Appendix 3B
27th Sep 20167:00 amRNSAmec Foster Wheeler appointed to Salamanca mine
26th Sep 20167:00 amRNSAnnual Financial Report
20th Sep 20167:00 amRNSLOI for first Million lbs of Salamanca Offtake
19th Sep 20167:00 amRNSAppointment of Peel Hunt as Joint Broker
8th Sep 201611:24 amRNSHolding(s) in Company
5th Sep 20167:00 amRNSHigh grade intercepts point to Z7 resource upgrade
16th Aug 20167:00 amRNSHolding(s) in Company
15th Aug 201612:04 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.