focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 18.75
Bid: 18.00
Ask: 19.50
Change: 1.00 (5.41%)
Spread: 1.50 (8.333%)
Open: 18.50
High: 19.50
Low: 19.50
Prev. Close: 18.50
BKY Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Quarterly Report

29 Jan 2010 08:34

RNS Number : 3332G
Berkeley Resources Limited
29 January 2010
 



29 January 2010

BERKELEY RESOURCES LIMITED

Quarterly Activities Report - December 2009

PERTHWestern Australia: Berkeley Resources Limited ('Berkeley' or 'Company') (ASX: BKY, AIM: BKY) is pleased to present its quarterly report for the period ended 31 December 2009. The Company's primary focus during the period was advancing its Salamanca Uranium Project, in Spain. The quarter's highlights include:

1) The Salamanca Uranium Project Scoping Study released in December 2009, strongly demonstrating the technical and economic viability of the Project. The Company is now moving forward into a Definitive Feasibility Study (DFS) phase commencing early 2010. 

Highlights of the Scoping Study include-

Annual production of 2.1mlbs over life of mine (+16 years).

Various processing options considered including use of the existing Quercus tank leach Plant.

Satellite heap leach operations at Retortillo and Santidad.

Cash operating costs under the scenarios in the Study ranged from US$26.15 - $29.65 per lb of U3O8 produced, including rehabilitation cost allowance.

Capital costs to re-commission the Quercus plant - fully loaded with a 20% contingency and based on all new equipment - range from US$51.3m for the heap leach scenarios, to US$88.9m for the tank leach scenarios.

2) JORC compliant resources for the near surface open-pittable deposits at Alameda, Sageras and Mina D are on target to be reported in Q1 2010. The drilling and assay results to date confirm strong correlation with the historical information and lend considerable confidence to the above Study parameters.

3) The exploration potential of the project area has developed as more data is gathered. Recent results of "extended" drill holes undertaken during the confirmatory drilling campaign have indicated significant upside potential.

4) The Company has also been strengthening the management team at Berkeley, recruiting local and international mining professionals of various disciplines that will allow the Company to progress with the DFS.

Key Developments

Mr Ian Stalker, appointed as the new Managing Director and Chief Executive Officer. 

Restructure of royalty arrangements with the original founders and vendors of Berkeley's Spanish subsidiary, Minera de Rio Alagon (MRA).

Enquiries - Managing Director: Ian Stalker Tel: +34 608 221 497

RBC Capital Markets: Martin Eales  Tel: +44 20 7029 7881

 

Salamanca Uranium Project

Introduction

Berkeley's Salamanca Uranium Project is located in Salamanca ProvinceSpain, approximately 250km west of Madrid, near the Portuguese border.

The Project comprises a number of State Reserve licenses and the previously licensed Quercus uranium processing plant, presently owned by ENUSA Industrias Avanzadas SA (ENUSA), the Spanish state uranium company, as well as Berkeley's own extensive tenement holdings in the area.

Berkeley has agreed to acquire a 90% interest in the ENUSA assets after completion of a feasibility study on the Project. Berkeley will pay ENUSA €20m, and a royalty as well as leasing the Quercus plant. For further details of the Co-operation Agreement, please see the Berkeley announcement dated 10 December 2008.

Under the Agreement, the feasibility study is scheduled to be completed by November 2010. The Scoping Study has reviewed the ENUSA information pertaining to the historic exploration and operations on the State Reserves and assessed the various processing options and demonstrated the potential Project viability.

Scoping Study - Conclusions

Processing Options

The Salamanca Uranium Project Scoping Study considered 4 different scenarios, with a view to firstly, verify the potential value of the ENUSA assets and secondly, to compare the likely processing alternatives. The first 3 scenarios considered mining only the Mina D, Sageras and Alameda South deposits and then 3 different processing alternatives.

Tank leaching all ore produced at the Quercus plant, with ore from Alameda South trucked to the Quercus plant on a purpose built haul road,

Tank leaching all ore produced at the Quercus plant, with ore from Alameda South transported to the Quercus plant on a purpose built conveyor belt,

Heap leaching all ore produced and transporting pregnant solution to the Quercus plant for processing, extraction and packaging.

The fourth scenario also considered mining and heap leaching Berkeley's more distant Retortillo and Santidad deposits.

4. Heap leaching Mina D, Sageras, Alameda South, Retortillo and Santidad and processing solution at the Quercus plant.

For further details see Berkeley's announcement dated 2 December 2009.

 Conclusions

Cash operating costs under the various scenarios in the Study ranged from US$26.15 - $29.65 per lb of U3O8 produced over the life of the Project, including a very high standard of rehabilitation. 

Capital costs to re-commission the Quercus plant fully loaded with a 20% contingency and based on all new equipment - range from US$51.3m for the heap leach scenarios, to US$88.9m for the tank leach scenarios.

The Study is based on mining a number of deposits within the ENUSA State Reserves, which collectively have exploration targets ranging from 28.0-34.1Mt of ore at grades of 440-540 ppm of U3O8, as well as the Company's JORC resources in the area of 15.9m lbs.

Mining is relatively simple, shallow open pit mining with drill, blast, load and haul undertaken by local contractors. The average strip ratio for the various pits included in the Study ranges from 2.4:1 when including the Retortillo and Santidad deposits, or 1.9:1 without.

The Project is already served by all necessary major infrastructure requirements.

In order to allow comparison of the alternative scenarios, the Study assumed a uranium price of US$55/lb and production of 2.1m lbs pa of U3O8 over the Project life, effectively the permitted capacity of the Quercus Plant. Based on our current understanding, future modeling will also consider potential to increase the permitted capacity of the plant in order to optimize early cash flows. There are good reasons to expect the Project could ultimately produce for over 20 years, including feed from Retortillo and more distant or subsequent resources.

The Study has reviewed the environmental, permitting and social considerations for the Project and no substantial impediments have emerged. Discussions with various authorities indicate strong support for the Project at a local level. Permitting timelines indicate that Berkeley's objectives to re-commission production by 2012 are achievable.

Berkeley always aims at world's best practice for environmental management and rehabilitation. The Scoping Study assumes, inter alia, that all mining voids will be double lined, backfilled and rehabilitated.

NOTE - The ENUSA deposits have been extensively explored by ENUSA but are not classed as mineral resources. The quantity and grade of Berkeley's exploration targets for the ENUSA deposits are conceptual in nature and based on a review of the available data on the projects to date. As there has been insufficient exploration to estimate a Mineral Resource in accordance with the JORC Code, it is uncertain whether further exploration will result in the determination of a Mineral Resource.

 Geology and Resources

The current 60 hole diamond drilling campaign commenced in October 2009 and the planned 5,000m will be completed in February. The main objectives of the campaign are to confirm the historical drill data, provide geological and assay data to enable the calculation of JORC complaint resources and to produce representative material for metallurgical testwork.

Parallel to the diamond drilling campaign, Berkeley is re-probing those historic drill holes in the deposits which remain accessible. To date, over 150 roto percussion holes at Mina D and Sageras have been relogged and the comparison of the Berkeley equivalent uranium grades (eU3O8) with the historical eU3O8 grades is excellent.

The Scoping Study assessed all of the available historical data with detailed fieldwork checks completed at all of the Project deposits. In addition, an evaluation of the exploration potential was conducted for the remaining State Reserves. The main conclusions are:

High confidence in the quality of the historical data.

Confirmation of the historical exploration targets.

Excellent potential at Mina D, Sageras and Alameda South, for defining additional resources.

Strong exploration potential in a number of mineralised areas proximal to the main deposits.

29 diamond drills were drilled during the quarter.

Deposit

Number of Holes

Drill Metres

Mina D

15

1,505

Sageras

10

628

Alameda South

4

317

Total

29

2,450

Table 1 - Diamond Drilling current status

  

Deposit

Hole ID

Interval (m)

eU3O8

(ppm)

Alameda

ASD-001

3.2

5,904

Alameda

ASD-002

47.5

2,120

Alameda

ASD-003

26.7

495

Alameda

ASD-003

36.8

539

Mina D

MDD-003

31.2

446

Mina D

MDD-007

7.8

3,104

Mina D

MDD-011

9.9

1,579

Sageras

SGD-001

27.5

707

Sageras

SGD-002

21.9

587

Sageras

SGD-003

49.5

1,225

Sageras

SGD-007

66.7

391

Sageras

SGD-009

38.4

848

Sageras

SGD-010

35.8

508

Table 2 - Significant intersections from drilling to date

Full tables of eU3O8 intersections are included in the Appendix. The intersections have been calculated using a nominal 200ppm lower cutoff and a minimum thickness of at least 1 metre. All of the intersections correlate well with the historical drill hole data in both thickness, location down the hole, and grade. The intersection widths are approximately true thickness as the drill holes have been planned to intersect the shallow dipping mineralised zones at right angles.

Mina D Deposit

The Mina D deposit is entirely hosted within weakly metamorphosed, structurally complex fine grained metasediments. The dominant lithologies in the Mina Fe district are shales that have been metamorphosed to phyllites.

The principal uranium minerals are late stage, hydrothermal pitchblende and coffinite, hosted within NE-SW striking, laterally continuous fault breccias and shears dipping between 30 and 70 degrees to the NW. The main uraniferous stage is the last in the hydrothermal process and the uranium minerals being spatially but directly related to minor quartz sulphide and carbonate, siderite gangue. 

A consultant Structural Geologist has logged the entire Mina D diamond drill core and interpreted the structural zones as detachment faults, initiated during the first phase of deformation. Within these broad structural zones, the mineralisation is in steeply dipping, syntectonic thin erratic fracture veins, impregnations in bedding-parallel (and cross-cutting) breccias, and as powdery U-oxides permeating along bedding-foliation planes and irregular late tectonic fractures.

Fifteen diamond drill holes were completed at the Mina D deposit. The e-grades calculated by Berkeley from the down hole gamma measurements correlate well with the surrounding historical drill holes.

  Sageras Deposit

10 diamond holes were completed at the Sageras deposit in the quarter. The mineralisation is hosted entirely within metasedimentary rocks very similar to those at Mina D. The uranium minerals were also formed by low temperature, hydrothermal fluids and are hosted within narrow high grade veinlets and fractures that form a stockwork of considerable vertical and lateral extension with localised, higher grade breccias.

The comparison in all holes is excellent, in particular SGD-001 and the closest roto percussion hole (collars less than 5 meters apart) where the e-grades have a very strong match in width and grade over the entire mineralised section.

In addition to providing confidence in the historic data, the drilling at Sageras demonstrates the strong exploration potential below the limits of the previous drilling. Holes SGD-004 and SGD-007 not only confirmed the historical results in the upper parts of the hole, but also intersected significant and previously untested mineralisation to depths of 30 metres below the limits of the previous drilling. RC drilling will target potential extensions indicated by these highly promising results.

Diamond drilling at Sageras is expected to be completed by the middle of February. A subsequent campaign of RC drilling is planned to test the apparent lateral and depth extensions of the deposit and also to provide further data for less densely drilled areas of the deposit.

Alameda South Deposit

Geologically, the Alameda South deposit is similar to the Sageras and Mina D deposits, with the principal difference being intense contact metamorphism effects on the host lithologies and the intrusion of numerous thin granitic dykes and sills. The uranium mineralisation has a strong structural control being present on fractures and within quartz carbonate sulphide veins.

The Berkeley drilling has intersected numerous granitic dykes that appear to correspond with a higher amount of fracturing in the surrounding metasediments and an associated increase in mineralisation. 

Drilling at the Alameda South deposit commenced in December and the 4 holes completed to date have targeted the higher grade centre of the deposit. All 4 holes have intersected thick and/or high grade mineralisation similar to the surrounding historical holes. Noteworthy is the near surface, high grade mineralisation in ASD-001, with e-grades up to 6,000ppm only 3 metres below the surface.

Again, the excellent correlation between the recent drill data and the historical data, both in thickness and in grade, provides a high level of confidence in the historical data.

The diamond drilling campaign at Alameda South comprises 19 diamond holes and is expected to be completed by the end of February.

  Data Verification

During the quarter an important aspect of the scoping study has been the verification of the historical data which included:

Exploration history of the Mina Fe deposits

Location of surface data

Down hole deviation surveys

Density measurements

Down hole radiometric surveys

Geological mapping

Particular attention was given to the validation of the e-grade calculations as they represent a large proportion of the grades contained in the historical database.

The Berkeley down hole gamma instrument was calibrated at the South Australia Department of Water, Land and Biodiversity Conservation in calibration pits constructed under the supervision of CSIRO.

A batch of 120 half metre full core samples were selected from a number of Berkeley drill holes at Mina D and sent to ALS Chemex in Vancouver for chemical analysis. The results show an excellent correlation with the e-grades generated from the down hole gamma logging. There are some minor differences corresponding to the geological variation of the deposit. In general, radiometric logging is the preferred method for estimating the grade and thickness of uranium mineralisation as the gamma tool measures a volume that can be up to 50 times larger than a typical drill core and thus gives a more representative sample.

Historical tests have demonstrated that disequilibrium is not an issue on the ENUSA deposits and the initial chemical assay comparisons have confirmed this view.

Berkeley has continued to re-probe historical drill holes at Mina D and Sageras that have remained accessible. To date, over 150 holes have now been re-logged and the comparison of the Berkeley e-grades with the historical e-grades is excellent.

 

Mining Studies

The Scoping Study mining studies were completed by AMC Consultants (UK) Limited and were based on producing 2.1mlbs U308 per year over a mine life of +16 years, from Mina D, Sageras and Alameda.

Pit optimisations were completed for the four processing options and Whittle Lerchs Grossman optimised pit shells were selected for mine production schedules. 

No detailed pit designs were developed for the scoping study. The operating costs and recovery inputs used in the optimisations were generated from provisional proposals from four Spanish mining contractors and Aker Solutions.

At this stage no geotechnical work has been completed by Berkeley although all of the diamond drill holes have been geotechinically logged. Based on the historical ENUSA open pits an overall slope angle of 45 degrees has been applied. All of the pits are relatively shallow (

The average strip ratios (t:t) generated from the optimisations for the tank leach option was 2.2:1 for Alameda, Sageras and Mina D and 1.9:1 for the heap leach options.

To reduce waste rehandle under each option, backfilling of waste will be conducted throughout the mine's life, although the majority of backfilling is scheduled after the productive years.

Metallurgical and Processing

The four mining and processing scenarios were optimised, scheduled, and costed by AMC Consultants (UK) Limited, based on work prepared by Aker Solutions, Kappes Cassiday and Berkeley.

The tank leach and heap leach metal recoveries were assumed to be 90.7% and 80% respectively. The tank leach estimate is based on historical ENUSA Quercus Plant tank leach recoveries of 92%, adjusted for soluble uranium losses of 2%.

Radiometric sorting has been included in all options based on the radiometric testing that was carried out on samples from the Retortillo deposit. The sorting facility will handle up to 40% of the mined output. The feed will be coarse screen oversize, predominantly +80mm. This will have a lower grade than finer particles. The sorting plant will be tuned to reject at least 50% of its feed material; this represents 20% of the ROM output. The uranium loss in this coarse reject has been projected to be 2% of the total uranium delivered from the mine.

The processing options are essentially based on the historical processes used by ENUSA - for both tank and heap leaching. Both processes are conventional sulfuric acid leach with MnO2 as an oxidant and solvent extraction using kerosene, Alamine and iso-decanol. Historic performance and Berkeley's testwork indicate acid consumption of approximately 22kg/t ore for tank leaching and 16kg/t for heap leaching.

  The key elements of both processes are:

Tank Leach Option

Primary crushing and stockpile

3-Stage fine crushing and screening

Radiometric ore sorting of +80mm material

Rod milling - P80 7mm

Tank leach

Cyclone classification

CCD washing of slimes

Horizontal belt filter washing of sands

Pregnant solution clarification

Solvent extraction

Yellowcake precipitation, drying and drumming

Heap Leach Option

Primary crushing and stockpile

2-Stage fine crushing and screening

Radiometric ore sorting of +80mm material

Heap leach of minus 12mm ore

Pregnant solution clarification

Solvent extraction

Yellowcake precipitation, drying and drumming

All necessary plant is available for both processes, with the exception of the crushing and milling circuits, radiometric sorting facility and belt filtering, which are included in the capital cost estimates below. It is uncertain whether the existing heap leach facility is the best option for future use and the capital cost also assumes a new facility.

The existing plant has been inspected by Aker Solutions and other consultants and is in a good state of repair, with limited capital required to bring it back to operable condition.

The Project area is accessed by a major highway from Madrid. Electrical power is available and connected from the national grid to the Quercus site and raw water is available from the river adjacent to the mine site.

Aker Solutions and Kappes, Cassiday & Associates Australia were commissioned by Berkeley to produce a scope of work for the testwork program to support the DFS for the Salamanca Uranium Project in Spain. Material from a number of deposits will be tested.

  The testwork program includes:

comminution tests,

materials handling tests,

heap leach tests,

agitated leach tests,

filtration testwork,

solvent extraction,

ADU precipitation testwork.

Representative samples from the confirmatory drilling program will be collected and sent to the selected laboratory in February 2010.

Capital Costs

In the case of tank leaching, the capital cost to refurbish and re-commission the Quercus plant is estimated at US$88.8m.

Plant Area

Capital Cost (US$m)

Crushing

21.18

Ore Sorting

6.56

Milling, Tank Leach, & Belt Filtration

38.14

Refurbishment of Existing Process Plant excluding CCD circuit & Refurbishment of Existing Clarification, SX and Product Recovery

8.17

Laboratory

1.07

SX Organic Inventory

0.60

Contingency

13.17

Total

88.88

Table 3 - Capital Cost Estimates for Tank Leach Classified by Plant Area

Potential additional capital costs for transporting ore from Alameda to the Quercus plant are estimated at approximately US$3m for a dedicated haul road or approximately US$50m for a conveyor belt system.

In the case of heap leaching, the capital cost to refurbish the existing Quercus plant final processing stage infrastructure and to build a heap leach facility for Mina D and Sageras is $51.28M.

  

Plant Area

Capital Cost (US$m)

Crushing

15.15

Ore Sorting

6.56

Heap Leach

16.40

Refurbishment of Existing Clarification, SX and Product Recovery

4.55

Laboratory

1.07

SX Organic Inventory

0.60

Contingency

6.96

Total

51.28

Table 4 - Capital Cost Estimates for Heap Leach Classified by Plant Area

Operating Costs

Operating costs have been calculated for the heap and tank leach options and range from $26 - $30 per lb of U30produced over the life of mine.

The processing operating cost estimates have been provided by Aker Solutions and Kappes Cassidy and take into consideration the scope of work associated with the complete Process Plant, excluding General and Administration costs.

All of the process options operate on a 7 day a week, 3 shift per day basis, with the exception of the product recovery which has been assumed to operate on a day shift only, 5 days per week.

Mining cost estimates have been based on proposals from three Spanish mining contractors.

Rehabilitation and closure costs of $1.00/t material mined have been used and include:

Transportation of tailings and waste to lined mining pits

Waste backfill

Rehabilitation & Reclamation

Closure costs and monitoring

 Environmental & Radiological, Permitting and Social

Golder Associates (Golder) have reviewed the environmental, social and permitting aspects of the Project and based on the processing alternatives considered in the Scoping Study, there are no substantial legislative, environmental or social impediments to the Project. While the environmental standards are high, the permitting process is clear and well understood, given the uranium mining and processing history in the region. Local support to date is positive and the Project could have a substantial positive impact on the economy and employment in a region with limited alternative industry.

The actual permitting requirements and processes for the Project will depend on a number of factors which are as yet undecided. These include the processing route chosen, heap leaching components and locations thereof, mining scheduling, transport options and variations to the plant and historical process.

As a general principle, the more the processing route varies from the historical processing route, the greater will be the permitting requirements and the longer the permitting process. Berkeley has initiated discussions with the relevant authorities to begin consideration of potential mining of the Project aims to be in production in FY 2012.

Preliminary environmental base line studies, including water, soil and sediment sampling for radiological characterisation and radon exhalation measurements have been completed.

Corporate

Mr. Ian Stalker was appointed as Managing Director and Chief Executive Officer from the 17th November.

Mr. Stalker is a chemical engineer, with an outstanding history in developing and managing a number of mining projects around the world over the past 35 years. He has considerable experience in the uranium sector and in mining operations in Spain and has successfully managed eight mining projects through feasibility study, development and construction phases.

The Company's royalty commitments to the original founders and vendors of Berkeley's Spanish subsidiary, Minera de Rio Alagon SL ("MRA") were restructured on the 23rd December 2009The parties have agreed to replace the previous royalty with a 1% royalty on all Berkeley's future uranium production in Spain and Portugal, including potentially non-MRA properties. The minimum cash royalty has been terminated, in exchange for issue to the MRA vendors of 750,000 new ordinary fully paid shares in the Company.

A full version of this announcement including images can be downloaded from Berkeley's website at www.berkeleyresources.com.au.

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr. Ross Corben, who is a Member of The Australian Institute of Mining and Metallurgy and an employee of Berkeley Resources Limited. Mr. Corben has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Corben consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

Appendix

Mina D Drill Hole Intersections

Hole ID

Easting

Northing

Elevation

Depth

From

To

Interval

eU3O8

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(ppm)

**MDD-001

701418

4500972

628.2

71.96

47.2

55.9

8.7

7,949

**MDD-002

701395

4500984

627.7

84.00

57.6

68.8

11.3

906

MDD-003

701389

4500551

660.9

105.00

38.5

39.7

1.2

318

45.7

76.9

31.2

446

**MDD-004

701178

4500782

655.0

90.00

55.2

63.2

8.1

3,299

**MDD-005

701425

4500674

641.5

65.00

38.8

41.0

2.3

3,250

MDD-006

701388

4500552

661.0

144.00

35.9

37.3

1.4

1,151

81.6

97.2

15.7

519

110.7

127.8

17.1

490

132.4

133.7

1.3

312

MDD-007

701440

4500697

637.0

90.35

43.7

51.6

7.8

3,104

MDD-008

701113

4500816

639.0

103.80

29.6

31.4

1.9

710

83.9

85.3

1.4

1,234

MDD-009

701442

4500642

641.3

75.00

30.9

38.9

8.0

752

52.8

54.7

1.8

888

MDD-010

701337

4500584

657.1

150.75

51.1

52.2

1.1

513

92.1

93.3

1.2

548

113.3

130.7

17.4

225

124.4

125.4

1.0

606

129.7

130.7

1.0

681

MDD-011

701093

4500820

633.5

111.35

46.4

56.3

9.9

1,579

97.1

98.4

1.3

288

MDD-012

701109

4500873

639.0

89.30

10.6

11.8

1.1

467

51.2

53.2

2.0

622

66.4

68.1

1.7

805

70.9

72.1

1.2

784

MDD-013

701134

4500842

643.2

102.35

90.0

91.8

1.8

294

MDD-014

701060

4500908

642.7

109.60

67.2

68.8

1.6

1,801

85.8

87.1

1.2

1,157

MDD-015

701274

4500562

657.6

112.75

Hole didn't reach target

** Egrades released Nov 09 now revised using new calibration

  Sageras Drill Hole Intersections

Hole ID

Easting

Northing

Elevation

Depth

From

To

Interval

eU3O8

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(ppm)

SGD-001

700357

4502816

645.3

70.10

4.1

31.6

27.5

707

48.2

53.6

5.4

893

SGD-002

700392

4502851

646.6

100.55

13.0

28.0

15.0

261

43.6

65.4

21.9

587

SGD-003

700021

4502843

663.5

85.12

19.7

69.2

49.5

1,225

SGD-004

700020

4502892

670.0

100.36

25.9

68.9

43.0

369

79.3

80.7

1.4

2,458

89.0

90.3

1.3

577

SGD-005

700440

4502588

650.4

40.07

4.5

17.0

12.5

632

SGD-006

700481

4502628

653.4

64.00

48.2

53.3

5.0

254

SGD-007

700019

4502943

672.9

110.60

33.3

100.0

66.7

391

SGD-008

700411

4502555

655.2

51.65

22.7

24.1

1.3

512

SGD-009

700336

4502795

643.9

51.75

5.2

43.6

38.4

848

SGD-010

700325

4502775

642.7

54.45

2.2

38.0

35.8

508

Alameda South Drill Hole Intersections

Hole ID

Easting

Northing

Elevation

Depth

From

To

Interval

eU3O8

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(ppm)

ASD-001

689176

4500731

733.4

51.09

3.1

6.3

3.2

5,904

12.7

14.9

2.1

628

ASD-002

689224

4500722

736.5

62.65

3.8

51.3

47.5

2,120

ASD-003

688980

4500779

729.7

123.10

6.2

33.0

26.7

495

44.2

81.0

36.8

539

94.6

110.5

15.8

480

ASD-004

689137

4500896

743.8

80.11

20.0

24.2

4.2

1,433

32.6

35.8

3.2

502

44.4

53.3

8.9

451

  Notes - Grade Estimation from Radiometric Logging

The uranium grades reported in this release are annotated with a sub-prefix "e" because they have been reported as uranium equivalent grades derived from down-hole gamma ray logging results and so they should be regarded as approximations only.

In general, radiometric logging is the preferred method for estimating the grade and thickness of radioactive uranium zones in drill holes where there are no significant potassium or thorium radioactive minerals. This is primarily because a radiometric log measures a volume that can be up to 50 times larger than a typical drill core and thus gives a more representative sample. In addition a radiometric log can provide a sample every few centimetres up a drill hole thus providing fine detail that is difficult to achieve with chemical assays. However the radiometric probes need to be properly calibrated and various other factors have to be taken into account before an equivalent uranium grade can be derived.

The Berkeley drill holes were logged with a GeoVista total count gamma tool. The gamma tool was calibrated in Adelaide at the Department of Water, Land and Biodiversity Conservation in calibration pits constructed under the supervision of CSIRO. The various calibration factors were calculated by David Wilson BSc MSc MAusIMM from 3D Exploration Ltd based in PerthWestern Australia.

A total of 120, 0.5m full core samples from 3 drill holes in Mina D have been analyzed by XRF at ALS Chemex Vancouver and compared directly to the e-grades to check their validity.

Drill hole co-ordinates are in UTM 29 ED 50 Datum grid and have been surveyed using a DGPS.

Drill intersections are calculated using a 200 ppm eU3O8 lower cut-off with a minimum 1 metre intersection.

The geological units at Mina D are dipping at approximately 30º and the drill holes have been inclined to intersect the mineralisation at right angles so the intervals are approximately true thickness. At Sageras and Alameda, the mineralisation is horizontal to shallow dipping so the holes have been drilled vertically or angled to intersect the mineralisation at right angles.

As a check on the down-hole gamma logging data, hand held scintillometer readings were taken along the mineralised sections of the core and averaged out every 50cm. These showed good correlation with the down-hole gamma readings and were used to identify sections which may have been affected by radon. The down-hole gamma results also confirmed visual observations of significant uranium mineralisation in some of the holes.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLIFFTLAIAFII
Date   Source Headline
26th Apr 20247:00 amRNSBoard Changes
26th Apr 20247:00 amRNSQuarterly Report March 2024
10th Apr 20247:32 amRNSCommencement of Arbitration against Spain
13th Mar 20247:05 amRNSHalf-Year Accounts
30th Jan 20247:00 amRNSQuarterly Report December 2023
2nd Jan 20247:00 amRNSExpiry of Unlisted Options
27th Dec 20237:00 amRNSPermitting update
21st Dec 20237:00 amRNSReport on Payments to Govts
21st Nov 20237:00 amRNSResult of AGM
30th Oct 20237:00 amRNSSeptember 2023 Quarterly
11th Oct 20237:00 amRNSNotice of AGM
22nd Sep 20237:00 amRNSDate of Annual General Meeting
30th Aug 20237:00 amRNS2023 Annual Report
26th Jul 20237:57 amRNSIssue of Unlisted Options
24th Jul 20237:00 amRNSQuarterly Report June 2023
19th Jul 20237:00 amRNSResults of Meeting
19th Jun 20237:00 amRNSNotice of General Meeting
31st May 20237:00 amRNSExpiry of Unlisted Options
28th Apr 20237:00 amRNSQuarterly Report March 2023
3rd Apr 202312:12 pmRNSPermitting Update
14th Mar 20237:00 amRNSHalf-year Report
7th Feb 20234:40 pmRNSSecond Price Monitoring Extn
7th Feb 20234:35 pmRNSPrice Monitoring Extension
7th Feb 20231:12 pmRNSPermitting Update
31st Jan 20237:00 amRNSQuarterly Report December 2022
26th Jan 20234:40 pmRNSSecond Price Monitoring Extn
26th Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20237:00 amRNSExpiry of Unlisted Options
22nd Dec 20227:00 amRNSReport on Payments to Governments
1st Dec 20227:00 amRNSUnlisted Options
18th Nov 20227:00 amRNSNotification of Investment Dispute
15th Nov 20227:00 amRNSResult of AGM
9th Nov 20227:00 amRNSBerkeley establishes Spanish Advisory Committee
27th Oct 20227:00 amRNSQuarterly Report September 2022
20th Oct 20222:13 pmRNSPublication of a Prospectus
4th Oct 20227:00 amRNSNotice of AGM
23rd Sep 20224:35 pmRNSPrice Monitoring Extension
19th Sep 20227:45 amRNSDate of AGM
31st Aug 202210:00 amRNS2022 Annual Report
29th Jul 20227:00 amRNSQuarterly Report June 2022
5th Jul 20227:00 amRNSChange of Director’s Interest Notice
28th Jun 20227:00 amRNSStrengthening of Board with Spanish Based Director
29th Apr 20227:00 amRNSQuarterly Report March 2022
29th Apr 20227:00 amRNSQuarterly Report March 2022
5th Apr 20228:46 amRNSNotice of Initial Substantial Holder
5th Apr 20227:00 amRNSNotice of Initial Substantial Holder
1st Apr 20227:00 amRNSSettlement of OIA Claim
24th Mar 20224:36 pmRNSPrice Monitoring Extension
24th Mar 20222:00 pmRNSPrice Monitoring Extension
24th Mar 202211:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.