GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 20.50
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 1.00 (5.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 20.50
BKY Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Berkeley Resources Update (Replacement)

22 Jul 2009 07:57

RNS Number : 0686W
Polo Resources Limited
22 July 2009
 



Correction - This replaces the announcement released at 7am and changes the figure of Euro 25 million to Euro 20 million in the opening paragraph.

 

Wednesday 22 July 2009

Polo Resources Limited ("Polo" or "the Company")

Berkeley Resources Update

Polo Resources (PRL), the AIM listed mining company with uranium and coal interests in Africa, Australia, Europe and Asia, is pleased to provide this update following an announcement on 21 July 2009 by Berkeley Resources Limited (ASX: BKY) ("Berkeley"), in which Polo has an 15.07% interest

Highlights of Berkeley's Announcement:

Berkeley completed a Co-operation Agreement with ENUSA under which it can acquire 90pc of ENUSA's uranium mining assets in Salamanca province in Spain for a payment of Euro 20 million.

An 18 month Feasibility Study commenced on the Salamanca Uranium Project on 26 May 2009 and consultants have been engaged to assist with the study including AMC Consulting to perform resource modeling and mine planning and Golder Associates for environmental and permitting work.

Within Salamanca province Berkeley has the following mineral resources and exploration targets:

An Inferred JORC resource for the Salamanca Retortillo deposit totaling 16.9m lbs of U3O8 at an average grade of 563ppm

Exploration targets totaling 16-19.5 MT at 400-500ppm (for 14-21.5 Mlbs of U3O8) for the Mina Fe area deposits and 25.5 - 29 MT at grades ranging from 450-500ppm (approximately 28-29 Mlbs U3O8), both were extensively explored by ENUSA

Column leach testwork on samples of mineralisation from the Retortillo deposit returned very encouraging results in the range of 80-85% recovery.

Neil Herbert, Managing Director of Polo Resources said:

"ENUSA's uranium mine in Salamanca was operated successfully until 2001 and the restart of this project is a significant opportunity for Berkeley for a relatively small capital investment compared to those associated with a new mining project."

The Salamanca Uranium Project incorporates the Mina Fe deposits (Sageras/Zona M and Mina D) and the nearby Quercus Plant, Alameda and the Retortillo deposits. The Feasibility Study will focus initially on mining the Mina Fe deposits for processing through the Quercus Plant utilising heap leaching or dynamic leaching, or a combination of the two. The Study will also address the potential for subsequently sourcing additional feed for the plant from the Alemeda and Retortillo deposits. 

A full copy of Berkeley's press release is available at www.berkeleyresources.com.au

The Mina Fe area and Alameda deposits have been extensively explored by ENUSA but do not presently have JORC compliant resources. Berkeley's targets are conceptual in nature and based on a review of the available data on the projects to date. As there has been significant exploration to define a JORC compliant Mineral Resource, it is uncertain whether further exploration will result in the determination of a Mineral Resource.

Contacts:

Polo Resources Limited

Neil HerbertManaging Director

27 82 404 36 37

Canaccord Adams Limited

Mike Jones / Ryan Gaffney

+ 44 (0) 20 7050 6500

Financial Dynamics

Ben Brewerton / Ed Westropp

+ 44 (0) 20 7831 3113

Glossary

ENUSA

Enusa Industrias Avanzada, SA

Inferred Resource

that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a low level of confidence. It is inferred from geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered.

MT

million tonne

ppm

parts per million, equal to gram per tonne. 1 ppm = 1 gram per (metric) tonne.

U3O8

Triuranium octaoxide. 1 ppm U308 = 0.848 ppm U.

About the Company

Polo is an emerging energy company focused on acquiring and developing advanced stage uranium and coal properties. For complete details on Polo Resources Limited, management encourages investors and interested parties to view its public documents filed on AIM Exchange at www.poloresources.com.

CAUTIONARY STATEMENT

The AIM Market of London Stock Exchange plc does not accept responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. All statements, other than statements of historical fact, in this news release are forward-looking statements that involve various risks and uncertainties, including, without limitation, statements regarding potential values, the future plans and objectives of Polo Resources Limited. There can be no assurance that such statements will prove to be accurate, achievable or recognizable in the near term. Actual results and future events could differ materially from those anticipated in such statements. These and all subsequent written and oral forward-looking statements are based on the estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Polo Resources Limited assumes no obligation to update forward-looking statements should circumstances or management's estimates or opinions change.

ENDS

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCKGGZNVZGGLZG
Date   Source Headline
12th Dec 20177:00 amRNSFully funded Salamanca to commence construction
6th Dec 20177:00 amRNSInitial Director's Interest Notice
30th Nov 20177:24 amRNSStrategic Investment & Director Appointment
28th Nov 20177:25 amRNSChange of interests of substantial holder
28th Nov 20177:22 amRNSResult of AGM
13th Nov 20177:00 amRNSChange of Director's Interest Notice
3rd Nov 20177:00 amRNSIssue of Equity and Appendix 3B
27th Oct 20177:54 amRNSNotice of AGM
25th Oct 20177:00 amRNSQuarterly Report September 2017
29th Sep 20178:24 amRNS2017 Annual Report
13th Sep 20171:20 pmRNSChange of Interest of Substantial Holder
4th Sep 20175:17 pmRNSHolding(s) in Company
30th Aug 20174:40 pmRNSSecond Price Monitoring Extn
30th Aug 20174:35 pmRNSPrice Monitoring Extension
30th Aug 20177:04 amRNSBerkeley signs US$120 million strategic investment
24th Jul 20177:00 amRNSQuarterly Report June 2017
12th Jul 20177:00 amRNSPrimary crusher delivered to site
7th Jul 201711:57 amRNSNotice - Change of Interests of Substantial Holder
6th Jul 20177:00 amRNSSalamanca Capital costs reduced by 1% to EUR 82.3M
4th Jul 20175:04 pmRNSHolding(s) in Company
16th Jun 20179:32 amRNSInitial Director's Interest Notice
12th Jun 20177:00 amRNSCo-Founder of Majedie appointed as a Director
9th Jun 20177:02 amRNSInitial Director's Interest Notice
9th Jun 20177:00 amRNSFinal Director's Interest Notice
7th Jun 20177:00 amRNSFormer senior Rio Tinto executive appointed
5th Jun 20177:00 amRNSExploration Programme Targeting Zona 7 Deposits
26th May 20178:35 amRNSIssue of Shares and Appendix 3B
28th Apr 20177:00 amRNSMarch 2017 Quarterly Report
24th Apr 20177:00 amRNSPre-construction activities advancing at Salamanca
21st Mar 20177:00 amRNSHolding(s) in Company
21st Mar 20177:00 amRNSEU approval of Salamanca mine offtake contract
20th Mar 20174:05 pmRNSHolding(s) in Company
17th Mar 20177:00 amRNSHigh grade intercepts at Zona 7 & Exploration JV
15th Mar 20177:00 amRNSHalf-year Report
20th Feb 20179:34 amRNSHolding(s) in Company
8th Feb 201710:35 amRNSHolding(s) in Company
7th Feb 20177:00 amRNSDirector/PDMR Shareholding
31st Jan 20177:00 amRNSDecember 2016 Quarterly Report
23rd Dec 20167:00 amRNSIssue of shares and Appendix 3B
20th Dec 20163:58 pmRNSHolding(s) in Company
20th Dec 20167:00 amRNSBerkeley takes another step towards construction
19th Dec 20165:43 pmRNSHolding(s) in Company
16th Dec 20167:00 amRNSAppendix 3B
14th Dec 20167:00 amRNSResult of Meeting
6th Dec 20167:00 amRNSMajor land acquisition completed at Salamanca mine
28th Nov 20167:00 amRNSOfftake Agreement Concluded with Interalloys
22nd Nov 20168:27 amRNSResult of AGM
14th Nov 20163:58 pmRNSHolding(s) in Company
14th Nov 20167:00 amRNSNotice of General Meeting
11th Nov 20167:00 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.