Beowulf Mining PLC24 October 2006 BEOWULF MINING PLC Independent Conceptual Study on Ruoutevare Iron Titanium Deposit in Northern Sweden London, 24 October 2006. Beowulf Mining PLC (AIM : BEM) the AIM quoted resourcecompany with iron, titanium, gold and copper projects in Sweden, is pleased toannounce that Raw Materials Group (RMG) of Sweden has completed a conceptualstudy of the Ruoutevare iron/titanium deposit. RMG suggest an extraction rate of10 million tonnes per annum as an economic production rate, requiring furthercost analysis work to be undertaken on ore transportation. RMG produced a simplified cash flow analysis for an eight year open pitextracting 10 million tons per year. This produced a positive study with a cashflow of just over US$50M per year from US$218 million per year of generatedrevenues, using various assumptions. (Full report is on www.beowulfmining.com ). Ruoutevare is 5 km outside the Sareks Nation Park, and careful attention to thelandscaping of the mine and associated facilities will be required. RMG suggestthis may cause a delay in permitting of the deposit. The study used current forecasts of revenues, capital costs and operationalcosts applied to a life of mine financial model. The Ruoutevare deposit is located in northern Sweden in the county ofNorrbotten, and is approximately 8 km NW of the small village of Kvikkjokk. Theproject is at an altitude of 610 meters above sea level and will require fortransport purposes a new 15 km road to be built from the site to Kvikkjokk. Hereit would link up with the existing 180 km road to Murjek and onward roadtransport or product reloading for rail shipment to the Gulf of Bothnia sea portof Lulea. The Swedish iron ore mining company LKAB is shipping out from Luleaannually some 4 Mt of magnetite concentrates and pellets to steel plants inFinland and Sweden. The deposit was originally discovered in the 18th Century. It was assessed bySveriges Geologiska Undersonkning (SGU) in the early 1970s during which timeground geophysics, metallurgical test work and detailed diamond drilling werecompleted. SGU determined a resource for the deposit of 116 Mt grading 38% ironand 5.6% titanium. This data was reviewed by Snowden Mining Industry ConsultantsLimited (Snowden) in 2006 for Beowulf and they reported a slightly highertonnage and a slightly lower grade. The mineralization occurs within outcropping shallowly dipping anorthosite asseveral separate tabular bodies in an area approx 1500m long and 200-300m wide.Snowden concluded that there are probably two lenses lying one above the other.Detailed geological mapping by Beowulf also found two over lying mineralisedlenses. Snowden and Beowulf both conclude that there is reason to believe thatthe resource estimates can be increased by additional drilling. The metallurgical test work was completed by LKAB and Rautaruukki during 1973and gives potential recoveries, using magnetic separation and flotation toproduce an iron ore concentrate and an ilmenite concentrate. The metallurgicalrecoveries are outlined below: Grade Recovery Ore feed to process plant 38% iron 5.6% titaniumMagnetite concentrate 65%iron 65%Ilmenite 44% titanium dioxide 45% A price FOB for magnetite concentrate is estimated to be US$52 per tonne and theprice FOB for ilmenite is estimated to be US$36 per tonne. The capital expenditure plus mine operation costs are not a major impact on whatwould be an open pit mine and are estimated to be 15% over the total eight yearmine life. Estimated costs are however relatively high mainly due to the cost oftransport and port handling charges. Commenting on the conceptual study, Dr. Jan Ola Larsson, Beowulf's SwedishManager, stated: "Initial indications on the economics of Ruoutevare are positive, but we need toaddress the transportation costs by negotiations with the State bodies inSweden. It is believed from geological studies that the tonnage of theRuoutevare reserves can be increased by additional drilling, thus extending themine life and reducing overall unit costs. Selective mining of the deposit canalso be achieved to increase cash flow in the early years of operation, as theSGU suggests that there is a 20 million tonne section grading 47% iron and 11%titanium oxide. Metallurgical testing work to improve the concentrate grade isongoing". For further information :- Dr. Robert Young, ChairmanBeowulf Mining plc Tel: +44-(0)1353 649 701 Gavin BurnellRuegg & Co. Limited Tel: +44-(0)207 584 3663 Nick BealerKing & Shaxson Tel: +44-(0)207 426 5986 Charles DampneyCity Capital Securities Limited Tel: +44-(0)207 822 7107 Gary MiddletonSt Swithin's Public Relations Tel: +44 (0) 207 429 4391 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
21st Aug 20147:00 amRNSCapital Raise of up to £2 million
21st Aug 20147:00 amRNSOperational Update
11th Jul 201412:09 pmRNSResult of AGM
17th Jun 20145:25 pmRNSNotice of AGM
17th Jun 20144:35 pmRNSPrice Monitoring Extension
4th Jun 20144:35 pmRNSPrice Monitoring Extension
30th May 20147:00 amRNSFirst Quarter Update
2nd May 20144:35 pmRNSPrice Monitoring Extension
24th Apr 20147:00 amRNSKallak North Update
3rd Apr 20142:00 pmRNSBeowulf at UK Investor Show
19th Mar 20147:00 amRNSOperational Update
28th Feb 20147:00 amRNSPreliminary Results
31st Jan 20141:00 pmRNSHolding in Company
27th Jan 20147:00 amRNSBallek Operational Update and Permit Application
22nd Jan 20147:00 amRNSOperational Update re Kallak Iron Ore Project
14th Jan 20144:35 pmRNSPrice Monitoring Extension
11th Dec 20137:00 amRNSDrilling to commence at Ballek
6th Dec 20134:35 pmRNSPrice Monitoring Extension
29th Nov 20134:20 pmRNSUpdate
29th Nov 20137:00 amRNSBeowulf Third Quarter Update
10th Oct 20134:00 pmRNSHolding in Company
28th Aug 20137:00 amRNSInterim Results
16th Aug 20137:00 amRNSUpdate re Kallak Iron Ore Project
12th Aug 20132:56 pmRNSResult of General Meeting
25th Jul 20134:00 pmRNSResponse to Swedish Media Reports
12th Jul 20134:15 pmRNSPosting of Circular and Notice of GM
10th Jul 20137:00 amRNSSubscription, Equity Swaps and General Meeting
4th Jul 20131:43 pmRNSResult of AGM and Update re Kallak Test Mining
11th Jun 20134:30 pmRNSAnnual Report, AGM Notice and Ballek Work Plan
31st May 20137:00 amRNSFirst Quarter Update
8th May 20137:00 amRNSOperational Update
18th Apr 20131:00 pmRNSChange of Broker
3rd Apr 20137:00 amRNSUpgraded JORC resource and operational update
28th Feb 20137:00 amRNSUnaudited Preliminary Results
25th Feb 20137:00 amRNSKallak Designated Area of National Interest
1st Feb 20137:00 amRNSUpdate re Kallak South Drill Programme
3rd Dec 20129:34 amRNSUpdate re Kallak Iron Ore Project
30th Nov 20127:00 amRNS3rd Quarter Update
21st Nov 20128:15 amRNSKallak South Work Plan Approved
17th Oct 20128:43 amRNSUpdate re Kallak Iron Ore Project
12th Oct 20128:46 amRNSUpdate re Test Mining Application
3rd Sep 20127:00 amRNSChange of Adviser
31st Aug 20127:30 amRNSInterim Results
31st Aug 20127:00 amRNSSignificant iron grades at Kallak
13th Jul 20129:15 amRNSUpdate re Kallak Iron Ore Project
29th Jun 20122:45 pmRNSResult of Annual General Meeting
21st Jun 201210:30 amRNSDrilling Results from Iron Ore Project
6th Jun 20126:00 pmRNSAnnual Report & Financial Statements & AGM Notice
1st Jun 20127:00 amRNS1st Quarter Results
29th May 20121:30 pmRNSUpdate re Kallak Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.