BCN - UPDATE ON THE SONORA LITHIUM PROJECT

7 Jul 2016 07:00

RNS Number : 4832D
Bacanora Minerals Ltd
07 July 2016
 

 

 

 

 

Bacanora Minerals Ltd

("Bacanora" or the "Company")

 

 

BACANORA PROVIDES UPDATE ON THE SONORA LITHIUM PROJECT

 

Bacanora, the London and Canadian listed lithium company developing the Sonora Lithium Project[1] ("Project") in northern state of Sonora, Mexico , is pleased to provide an update on the activities being undertaken as part of the Company's upcoming definitive Feasibility Study ("FS").

 

The FS will be aimed at delivering the most economically robust production plan possible for an initial 17,500 tonne per annum ("tpa") of lithium carbonate operation at the Project (increasing to 35,000 tpa in later years). The Company's strategy is to position itself to satisfy ongoing strong growth for lithium carbonate in the fast growing sectors of electric vehicles and energy storage. The FS is targeted for completion in Q1, 2017 and the Company is fully financed through to the initial project development and the start of the construction stages.

Overview

· The process engineering for the FS has been awarded to Ausenco Engineers. SRK Consulting (UK) Ltd. ("SRK") will undertake the Mineral Resource Estimate ("MRE") and International Mining Consultants will carry out the reserve estimate and mine planning. Other specialised consulting groups will be appointed for additional sections of the FS.

· The Company's 3,000 metre infill drilling program is progressing well, with a target of upgrading a portion of the current Mineral Resource from the Indicated to Measured category:

o Indicated portion of the Resource is currently comprised of 259 Mt averaging 3,200 ppm Li for 4.5 Mt of lithium carbonate equivalent ("LCE[2]").

o A total of 2,039 metres have been drilled to date across 20 in-fill holes on the La Ventana concession - a further 11 holes remain to be drilled.

o Intercepts of the upper clay range from 14.1 to 40.9 m in thickness with an average thickness of 30.3 m and those for the lower clay range from 10.4 to 25.6 m with an average thickness of 19.8 m, these intercepts are consistant with the average thickness of the deposit.

o Assay results are expected to be reported in August.

· Continued expansion of the pilot plant capacity and metallurgical test work is ongoing:

o Initial focus on producing battery-grade lithium carbonate samples for delivery to off-takers in Asia and Europe during Q3, 2016.

o Continuing flow sheet development and optimisation of lithium recoveries and reagent consumption.

o On-going upgrades and optimisation of the pilot plant to ensure semi-continuous operations and continued lithium carbonate production.

· Recruitment and training:

o Over 30 professional and operational personnel are now working at the pilot plant in Hermosillo.

o Training and quality control processes are in full swing to negate risk associated with execution of commissioning and operational phases and to ensure excellence in terms of operations and quality control.

o Additional operations and technical personnel will continue to be employed at the pilot plant as sample production continues to ramp up.

 

Exploration and Resources:

The current exploration program is underway to upgrade a portion of the current MRE from the Indicated to Measured category is ongoing. This 3,000 metre drilling program has been planned in conjunction with SRK and over 2,000 metres (some 31 infill drill holes) have been completed to date on the La Ventana concession of the Project. In addition, geotechnical and hydrogeological studies are programmed to start after the drilling campaign.

 

Infill Drilling highlights:

· A total of 2,039 metres have been drilled in 20 in-fill holes on La Ventana; further 11 holes remain to be drilled in the ongoing programme.

· Intercepts of the upper clay range from 14.1 to 40.9 metres in length with an average thickness of 30.3 metres and those for the lower clay range from 10.4 to 25.6 metres with an average thickness of 19.8 m.

· Core splitting is ongoing and samples will be shipped to the ALS-Chemex laboratory for assays. Standards, blanks and duplicates are intercalated within the samples for QA/QC controls. Initial assay results are expected to be reported in August.

· Density measurements are undertaken in order to determine possible clay shrinkage/swelling, this to assist on the mine planning.

 

 

 

The table below summarises the unit intercepts of the current drilling campaign:

 

Hole/Unit

Capping Basalt

Upper Sandstone

Upper Clay

Ignimbrite

Lower Clay

Basement

Total Depth (m)

LV-40

95.0

7.5

36.9

5.2

21.0

11.4

176.9

LV-41

106.0

25.5

16.9

25.6

5.1

179.1

LV-42

20.1

8.1

32.2

6.6

11.4

9.2

87.6

LV-43

59.5

12.0

41.0

18.3

18.3

6.1

155.0

LV-44

71.8

14.3

40.7

12.8

22.0

4.4

166.0

LV-45

14.9

21.5

14.0

50.4

LV-46

13.2

20.8

10.8

44.8

LV-47

15.0

22.8

7.1

44.9

LV-48

14.0

22.4

5.3

41.7

LV-49

14.1

15.5

14.1

1.2

44.9

LV-50

4.3

14.6

26.3

15.5

10.4

4.4

75.4

LV-51

12.4

22.7

9.9

44.9

LV-52

12.9

19.3

6.6

38.8

LV-53

126.8

1.2

38.8

16.9

20.9

4.9

209.4

LV-54

100.9

11.1

36.9

16.6

19.5

6.2

191.2

LV-55

32.3

19.8

30.2

15.8

24.2

8.0

130.3

LV-56

5.1

26.4

27.7

14.9

21.5

7.2

102.7

LV-57

2.6

6.7

6.5

19.8

9.2

44.8

LV-58

40.4

4.5

17.9

11.7

21.4

4.0

99.8

LV-59

45.9

25.5

12.6

15.8

11.3

111.0

Average (m)

54.7

11.5

30.3

13.4

19.8

7.3

2039.3

 

Hermosillo Pilot Plant Operation and Sample Production:

 

Over the past six months, the Company has continued to expand the production capacity of its pilot plant located in Hermosillo, Sonora, Mexico. Metallurgical test work is ongoing with a significant focus on off-taker samples, continuous flow sheet development plus operations and ongoing operator training. The initial focus has been the production of battery-grade lithium carbonate samples for delivery off-takers in Asia and Europe.

 

Over the next 12, months the Company will continue a recruitment campaign of engineers and operators in order to maintain the plant in continuous operation and to gain expertise in those processes that require supervision and monitoring for optimisation and quality control. To date, the plant operates continuously on the beneficiation and hydro-metallurgical processes. This investment in people and training will provide significant operational and quality control benefits once commissioning of the full scale lithium carbonate plant commences.

 

 

Pilot Plant Operation Highlights:

· Ore-to-product metallurgical test work on bulk samples taken from trenches on the clay units from the planned mining areas within the La Ventana concession is in progress.

· Upgrading of concentrate and pre-concentrate front-end processes to optimise lithium recovery.

· Hydrometallurgical recoveries have been improved by the addition of gas-fired rotary and stationary calcining units for continuous roasting of the lithium concentrate.

· Optimisation of gypsum consumption and evaporation and crystalisation parameters.

· Increased capacity in the Pregnant Liquor Solution ("PLS") circuits to allow continuous leaching operations.

· Installation of additional resin columns in the lithium carbonate recovery circuit for the refining of the product to battery-grade lithium carbonate.

 

In addition to the significant flow sheet development and optimisation being undertaken at the pilot plant, all of the flow sheet development is being audited by independent consultants as part of the ongoing FS process.

 

The Company will continue to develop a number of strategic relationships with international lithium trading companies and mining companies for the sale of its lithium carbonate products. The management team has already completed a number of detailed site and plant visits with potential off-take partners to facilitate and expedite lithium sample optimisation. Negotiations in respect to offtake agreements with these potential partners are ongoing and will continue in tandem with the preparation of the DFS.

 

Martin Vidal is the Qualified Person pursuant to National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and the AIM Note for Mining and Oil and Gas Companies who has reviewed and approved the technical contents of this announcement.

 

For further information, please contact:

 

Bacanora Minerals Ltd.

Peter Secker, CEO

info@bacanoraminerals.com

Cairn Financial Advisers LLP, Nomad

Sandy Jamieson / Liam Murray

 

+44 (0) 20 7148 7900

Stifel Nicolaus Europe Ltd., Broker

Simon Mensley

+44 (0) 20 7710 7605

St Brides Partners, Financial PR Adviser

Hugo de Salis / Frank Buhagiar / Elisabeth Cowell

+44 (0) 20 7236 1177

 

ABOUT BACANORA:

Bacanora is a Canadian and London listed minerals explorer (AIM and TSX-V: BCN). The Company explores and is developing industrial mineral projects, with a primary focus on its lithium project. The Company's operations are based in Hermosillo in northern Mexico. The main assets of Bacanora are:

· The Sonora Lithium Project, which consists of ten mining concession in the northeast of Sonora State. The Company, through drilling and exploration work to date, has established an Indicated Mineral Resource (in accordance with NI 43-101) of 4.46 Mt LCE contained in 259 Mt of clay at a Li grade of 3,200 ppm and an Inferred Mineral Resource of 2.74 Mt LCE contained in 160 Mt of clay at a Li grade of 3,200 ppm.

· The Magdalena Borate Project, in Sonora state, Mexico, where the Company's main borate zone, El Cajon, has an Indicated Resource (in accordance with NI 43-101) of 1.17 mt of B2O3, at an eight percent cut-off grade. The Company has completed a number of measures to determine the geological and commercial potential of the project and will undertake a pre-feasibility exercise to determine the economic benefit of developing the mine and constructing a processing plant on site in order to become a supplier of boric acid.


[1] The Sonora Lithium Project is comprised of the following lithium properties: La Ventana lithium concession, which is 100 percent owned by Bacanora, and the El Sauz and Fleur concessions, which are held by Mexilit S.A. de C.V. ("Mexilit"). The Megalit concession, which is held by Megalit S.A de C.V ("Megalit"), is not included in the Sonora Project Technical Reports at this time. Mexilit and Megalit are owned 70 percent by Bacanora and 30 percent by Rare Earth Minerals Plc.

[2] LCE is the industry standard terminology for, and is equivalent to, Li2CO3. 1 ppm Li metal is equivalent to 5.32 ppm LCE / Li2CO3.. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLAKADKBBKBQOK
Date   Source Headline
7th Jul 20167:00 amRNSBacanora Minerals Update on the Sonora Project
7th Jul 20167:00 amRNSBCN - UPDATE ON THE SONORA LITHIUM PROJECT
24th Jun 20167:00 amRNSBCN Announces Proposed Re-Domicile to the UK
31st May 20167:10 amRNSHolding(s) in Company
31st May 20167:00 amRNS3rd Quarter Results
31st May 20167:00 amRNSBCN - MD&A 31st of March 2016
31st May 20167:00 amRNSBCN - Financial Statement 31st of March 2016
23rd May 20167:00 amRNSBacanora - Blackrock Financing
29th Apr 20167:00 amRNSDirector/PDMR Shareholding
28th Apr 20167:00 amRNSDirectorate Change
18th Apr 20167:00 amRNSFiling of PFS and Project Updates
9th Mar 20167:00 amRNSCorporate Presentation and Change of Adviser
3rd Mar 20167:00 amRNSPre-Feasibility Study - Press Release
1st Mar 20167:00 amRNSInterim Results
25th Jan 20167:01 amRNSAppointment of Joint Broker
25th Jan 20167:00 amRNSConsultancy Agreement and Option Grant
18th Jan 20162:46 pmRNSDirector/PDMR Shareholding
6th Jan 20167:00 amRNSFiling of Technical Report
21st Dec 20157:00 amRNSDirectorate Change
8th Dec 20152:00 pmRNSOfftaker Update
4th Dec 20158:50 amRNSAward of Options
3rd Dec 20157:00 amRNSIssue of Equity
2nd Dec 20157:15 amRNSDirector/PDMR Shareholding
27th Nov 20157:00 amRNSDirector Appointment
24th Nov 20157:00 amRNS1st Quarter Financial Statements
23rd Nov 20157:00 amRNSUpdated Mineral Resource Estimate
20th Nov 20155:19 pmRNSHolding(s) in Company
20th Nov 20155:16 pmRNSHolding(s) in Company
16th Nov 20157:00 amRNSIssue of Equity
28th Oct 20157:39 amRNSFinal Results
17th Sep 201511:06 amRNSHolding(s) in Company
11th Sep 20157:45 amRNSDirector/PDMR Shareholding
1st Sep 20157:04 amRNSSonora Drilling Programme and Updated Results
28th Aug 20154:40 pmRNSSecond Price Monitoring Extn
28th Aug 20154:35 pmRNSPrice Monitoring Extension
28th Aug 20157:00 amRNSSonora Signs Lithium Supply Agreement
14th Aug 20159:30 amRNSIssue of Equity
8th Jul 20157:00 amRNSSonora Lithium Project Update
29th Jun 20157:00 amRNSFiling of Technical Report
23rd Jun 20158:57 amRNSExercise of Warrants and Issue of Equity
22nd Jun 20157:00 amRNSDirector Change
15th Jun 20157:00 amRNSResult of AGM
10th Jun 20152:58 pmRNSHolding(s) in Company
9th Jun 20159:03 amRNSStatement re Share Price Movement
5th Jun 20157:00 amRNSProject Update and Corporate Presentation
1st Jun 20157:00 amRNS3rd Quarter Results
22nd May 20157:00 amRNSDrilling Results Sonora Lithium Project, Mexico
19th May 20157:00 amRNSAppointment of CEO
14th May 20157:00 amRNSSonora Lithium Project - Resource Update
8th May 20154:36 pmRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.