The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 0.00
Low: 0.00
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Parys Mountain Scoping Study Update

12 May 2017 07:00

ANGLESEY MINING PLC - Parys Mountain Scoping Study Update

ANGLESEY MINING PLC - Parys Mountain Scoping Study Update

PR Newswire

London, May 12

12 May 2017 LSE:AYM

Parys Mountain Scoping Study Update

Anglesey Mining plc (“Anglesey” or the “Company”) reports that work on Scoping Study on the Parys Mountain copper-lead-zinc project in North Wales is continuing. The study is being undertaken by Micon International Limited and Fairport Engineering, in collaboration with company personnel, based on the resource estimate calculated by Micon in 2012.

The 2012 JORC Code compliant resource estimate reported a resource of 2.1 million tonnes at 6.9% combined base metals in the indicated category and 4.1 million tonnes at 5.0% combined base metals in the inferred category.

The initial approach adopted for the Scoping Study was a plan to mine these resources at 500 tonnes per day, or 165,000 tonnes per annum, commencing with development of the mineral deposits closest to surface. The Company had chosen this throughput rate as it was believed that the low capital cost associated with this approach would provide the most beneficial outcome. Given the level of indicated resources defined by Micon in 2012, this would result in a mine life of around 16 years, with mining of the indicated resources only and none of the inferred resources.

The Company has reviewed the initial outcome of the study, based on a daily processing plant input of 500 tonnes per day of ore, and concluded that an accelerated development of the indicated resources over a shorter initial mine life should be economically more attractive.

Fairport has considered some processing alternatives, specifically the introduction of dense media separation, that would increase the effective daily production rate by about 40% with only a limited increase in capital. This would result in a shortened mine life based on the existing indicated resources and should generate an enhanced financial outcome.

In addition, on reviewing the current indicative levels of the capital cost of mill equipment, including readily available used processing plant, it was felt that construction of a larger processing plant with a higher throughput rate could be justified. The feasibility study completed in 1991 was based on a throughput rate of 1,000 tonnes per day, or 350,000 tonnes per year.

Obviously, a higher initial daily throughput rate would require additional mine development, a higher capital cost and result in a shortened mine life based only on the existing 2.1 million tonnes of indicated resources, but it should generate an enhanced financial outcome.

However, recognising the significant inferred resources of 4.1 million tonnes, being almost twice the current indicated resources, it would be expected that during the operation of the mine definition and exploration drilling would be carried out from underground locations that should be expected to bring much of the current inferred resources into the indicated category, and that would then extend the mine life significantly.

Based on an initial review of the preliminary results of the draft Scoping Study, Anglesey has asked both Micon and Fairport to consider alternative production and throughput scenarios, at various levels between 500 and 1,000 tonnes per day, and expects to receive modified mine production schedules and alternative capital cost estimates in the near future. The inputs will then be incorporated into updated financial models, with a view to having optimized development scenarios available for consideration before the end of June 2017.

About Anglesey Mining plcAnglesey is carrying out development and exploration work at its 100% owned Parys Mountain zinc-copper-lead deposit in North Wales, UK with a reported resource of 2.1 million tonnes at 6.9% combined base metals in the indicated category and 4.1 million tonnes at 5.0% combined base metals in the inferred category.Anglesey holds a 6% interest and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 51%. Anglesey also holds 11.2% of Labrador Iron Mines Holdings Limited which has direct shipping iron ore deposits in Labrador and Quebec

For further information, please contact: Bill Hooley, Chief Executive +44 (0)7785 57251

Danesh Varma, Finance Director +44 (0)207 653 9881

Elliot Hance, Beaufort Securities +44 (0)207 382 8300

Date   Source Headline
30th Jul 20143:27 pmPRNAnnual Financial Report
2nd Jul 20143:38 pmPRNProjects update; LIM releases year end financials
29th May 20147:00 amPRNAcquisition of controlling interest in Grangesberg Iron
1st Apr 20145:00 pmPRNBlocklisting - Interim Review
4th Dec 201311:10 amPRNLIM completes third operating year
25th Nov 20137:00 amPRNHalf-yearly Report 30 September 2013
15th Nov 201311:37 amPRNLabrador Iron Mines Reports Second Quarter Results
7th Oct 20137:00 amPRNBlocklisting - Interim Review
25th Sep 20137:34 amPRNResult of AGM
19th Sep 20131:09 pmPRNLIM - Annual General Meeting
18th Sep 201311:23 amPRNLIM finalises joint venture agreement with Tata
15th Aug 201311:12 amPRNInterim Management Statement and LIM results
1st Aug 201310:26 amPRNDirectorate Change
23rd Jul 20133:02 pmPRNAnnual Financial Report
3rd Jul 201311:15 amPRNLIM March 2013 year-end results and operational update
27th Jun 20137:51 amPRNLIM reschedules conference call
24th Jun 201311:03 amPRNLIM - Elizabeth taconite resource
7th Jun 201312:08 pmPRNLIM First iron ore shipments of 2013
23rd May 201312:25 pmPRNLIM – 33% increase in year-end mineral resource
14th May 201311:13 amPRNLIM signs new sales and off-take agreements
8th Apr 20131:49 pmPRNHolding(s) in Company
2nd Apr 201312:57 pmPRNBlocklisting - Interim Review
12th Mar 201311:13 amPRNLIM arrangement with Tata Steel Minerals Canada
15th Feb 201312:19 pmPRNIMS and LIM third quarter results
13th Feb 20132:10 pmPRNLIM completes C$29 million equity financing
21st Jan 20137:00 amPRNLIM equity financing
18th Jan 201310:44 amPRNLIM Announces Unit Equity Financing
17th Jan 20138:58 amPRNLIM announces equity financing
3rd Jan 20134:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20134:35 pmRNSPrice Monitoring Extension
31st Dec 201212:40 pmRNSSecond Price Monitoring Extn
31st Dec 201212:35 pmRNSPrice Monitoring Extension
18th Dec 201212:05 pmPRNLIM Completes 2012 Exploration Program
30th Nov 20127:00 amPRNNew JORC compliant resource estimate for Parys Mountain
26th Nov 20127:00 amPRNAnglesey half yearly report and management statement
21st Nov 20124:39 pmPRNLIM appoints new CFO and director
15th Nov 201212:07 pmPRNLIM second quarter results
6th Nov 20121:48 pmPRNLIM C$30 million financing - Anglesey subscribes C$1.5m
17th Oct 20124:40 pmRNSSecond Price Monitoring Extn
17th Oct 20124:35 pmRNSPrice Monitoring Extension
2nd Oct 20127:00 amPRNLIM announces C$30 million equity financing
24th Sep 20124:40 pmRNSSecond Price Monitoring Extn
24th Sep 20124:35 pmRNSPrice Monitoring Extension
14th Sep 20127:00 amPRNLIM AGM and Operations Update
11th Sep 20122:15 pmPRNDirector/PDMR Shareholding
7th Sep 201212:20 pmPRNResult of AGM held 6 Sept 12
4th Sep 201211:09 amPRNLIM Operations Update and Outlook
15th Aug 201212:09 pmPRNIMS and LIM first quarter results
10th Aug 201212:15 pmPRNLIM new rail feasibility study
1st Aug 201210:44 amPRNTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.