The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 1.40
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Parys Mountain - Positive Preliminary Results from Metallurgical Testwork

4 Dec 2023 07:00

Anglesey Mining Plc - Parys Mountain - Positive Preliminary Results from Metallurgical Testwork

Anglesey Mining Plc - Parys Mountain - Positive Preliminary Results from Metallurgical Testwork

PR Newswire

LONDON, United Kingdom, December 04

 

 

Trading Symbol

AIM: AYM

 

4th December 2023

 

Anglesey Mining plc

(“Anglesey” or “the Company”)

 

Parys Mountain – Positive Preliminary Results from Metallurgical Testwork

 

Anglesey Mining plc (AIM:AYM), the UK minerals development company, is pleased to report that it has received preliminary results from the metallurgical testwork on the White Rock and Engine Zones at the Company’s Parys Mountain Cu-Zn-Pb-Ag-Au project, located on the Isle of Anglesey.

 

In June, the Company dispatched a 340kg sample to Grinding Solutions Limited (GSL) comprising a blend of material from both the White Rock and Engine Zones with a combined head-grade of 0.42% Cu, 3.60% Zn, 3.08% Pb, 49g/t Ag and 0.7g/t Au (10.8% ZnEq). The blend was 3.3 (White Rock) to 1.0 (Engine Zone), similar to the contribution that is expected to be delivered from the mine in the early years of production, prior to the Northern Copper Zone commencing.

 

Highlights

 

Two pre-concentration methods were conducted – Dense Media Separation (DMS) undertaken by Pesco and X-Ray Transmission sorting (XRT) completed by TOMRA. One element of the testwork was to determine the optimal process to take forward into the Pre-Feasibility Study.  Both methods demonstrated that a successful pre-concentration stage would be applicable with the overall base metals only head-grade increasing from 7.5% ZnEq to 11.4% ZnEq from the DMS (+52%) and 11.7% ZnEq from the XRT (+55%) – results will be updated once the gold and silver numbers are finalised – the precious metals are expected to add 3-4% to the ZnEq grade. The preliminary results are tabulated below:

 

 

Zn (%)

Pb (%)

Cu (%)

ZnEq (%)

Mass Rejection (%)

Metal Loss (%)

Original Sample

3.6

3.1

0.42

7.5

-

-

DMS Results

6.4

3.8

0.60

11.4

35

5.2

XRT Results

6.4

3.7

0.70

11.7

29

3.0

 

Preliminary results from the locked-cycle flotation testwork demonstrated higher recoveries than those achieved in historical testing. These results are based on calibrated pXRF readings with the full wet chemistry expected over the coming 2-3 weeks. The results are tabulated below:

 

 

Cu Concentrate

Zn Concentrate

Pb Concentrate

Au Concentrate

 

Cu Grade

Recovery

Zn Grade

Recovery

Pb Grade

Recovery

Au Grade

Recovery

PEA Estimates

21.8

56

56.2

82

51.8

76

n/a

40

GSL Testwork

31.5

74

50.7

86

56.4

80

300

65

Difference

 

+32%

 

+5%

 

+5%

 

+63%

 

Testwork with regards to net acid generation, settling rates and contact leaching on the tailings is ongoing with results expected over the next 2-3 weeks. In addition, GLS will also be completing a diagnostic leach test on the final zinc tailings to ensure optimal recovery of gold.

 

 

Jo Battershill, Chief Executive of Anglesey Mining, commented: “We are very pleased by the preliminary results from the metallurgical testwork on the White Rock and Engine Zones, which have demonstrated that the assumptions used in the 2021 PEA are potentially on the conservative side. The results show that the overall metal recoveries appear to be better than expected, particularly for both copper and gold. It is also very positive to confirm that the Parys Mountain deposit is amenable to both DMS and XRT pre-concentration methods with the potential feed grade increased by over 50%.”

“Successful pre-concentration has many benefits ranging from increased feed grade into the processing plant, lower volumes of tailings for disposal and the potential to build smaller, lower cost processing infrastructure. We will now look to investigate the relevant capital and operating costs for each option to determine which is the most optimal route to move forward with in the planned Pre-Feasibility Study.”

About Anglesey Mining plc

Anglesey Mining is traded on the AIM market of the London Stock Exchange and currently has 420,093,017 ordinary shares on issue.

 

Anglesey is developing its 100% owned Parys Mountain Cu-Zn-Pb-Ag-Au deposit in North Wales, UK with a reported resource of 5.3 million tonnes at over 4.0% combined base metals in the Measured and Indicated categories and 10.8 million tonnes at over 2.5% combined base metals in the Inferred category.

Anglesey also holds an almost 50% interest in the Grängesberg Iron project in Sweden, together with management rights and a right of first refusal to increase its interest to 100%.  Anglesey also holds 12% of Labrador Iron Mines Holdings Limited, which through its 52% owned subsidiaries, is engaged in the exploration and development of direct shipping iron ore deposits in Labrador and Quebec.

 

 

For further information, please contact:

Anglesey Mining plc

Jo Battershill, Chief Executive – Tel: +44 (0)7540 366000

Andrew King, Interim-Chairman – Tel: +44 (0)7825 963700

 

Davy

Nominated Adviser & Joint Corporate Broker

Brian Garrahy / Daragh O’Reilly – Tel: +353 1 679 6363

 

WH Ireland

Joint Corporate Broker

Katy Mitchell / Harry Ansell – Tel: +44 (0) 207 220 1666

 

 

 

LEI: 213800X8BO8EK2B4HQ71

 


3887169_0.png

Date   Source Headline
30th Jul 20143:27 pmPRNAnnual Financial Report
2nd Jul 20143:38 pmPRNProjects update; LIM releases year end financials
29th May 20147:00 amPRNAcquisition of controlling interest in Grangesberg Iron
1st Apr 20145:00 pmPRNBlocklisting - Interim Review
4th Dec 201311:10 amPRNLIM completes third operating year
25th Nov 20137:00 amPRNHalf-yearly Report 30 September 2013
15th Nov 201311:37 amPRNLabrador Iron Mines Reports Second Quarter Results
7th Oct 20137:00 amPRNBlocklisting - Interim Review
25th Sep 20137:34 amPRNResult of AGM
19th Sep 20131:09 pmPRNLIM - Annual General Meeting
18th Sep 201311:23 amPRNLIM finalises joint venture agreement with Tata
15th Aug 201311:12 amPRNInterim Management Statement and LIM results
1st Aug 201310:26 amPRNDirectorate Change
23rd Jul 20133:02 pmPRNAnnual Financial Report
3rd Jul 201311:15 amPRNLIM March 2013 year-end results and operational update
27th Jun 20137:51 amPRNLIM reschedules conference call
24th Jun 201311:03 amPRNLIM - Elizabeth taconite resource
7th Jun 201312:08 pmPRNLIM First iron ore shipments of 2013
23rd May 201312:25 pmPRNLIM – 33% increase in year-end mineral resource
14th May 201311:13 amPRNLIM signs new sales and off-take agreements
8th Apr 20131:49 pmPRNHolding(s) in Company
2nd Apr 201312:57 pmPRNBlocklisting - Interim Review
12th Mar 201311:13 amPRNLIM arrangement with Tata Steel Minerals Canada
15th Feb 201312:19 pmPRNIMS and LIM third quarter results
13th Feb 20132:10 pmPRNLIM completes C$29 million equity financing
21st Jan 20137:00 amPRNLIM equity financing
18th Jan 201310:44 amPRNLIM Announces Unit Equity Financing
17th Jan 20138:58 amPRNLIM announces equity financing
3rd Jan 20134:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20134:35 pmRNSPrice Monitoring Extension
31st Dec 201212:40 pmRNSSecond Price Monitoring Extn
31st Dec 201212:35 pmRNSPrice Monitoring Extension
18th Dec 201212:05 pmPRNLIM Completes 2012 Exploration Program
30th Nov 20127:00 amPRNNew JORC compliant resource estimate for Parys Mountain
26th Nov 20127:00 amPRNAnglesey half yearly report and management statement
21st Nov 20124:39 pmPRNLIM appoints new CFO and director
15th Nov 201212:07 pmPRNLIM second quarter results
6th Nov 20121:48 pmPRNLIM C$30 million financing - Anglesey subscribes C$1.5m
17th Oct 20124:40 pmRNSSecond Price Monitoring Extn
17th Oct 20124:35 pmRNSPrice Monitoring Extension
2nd Oct 20127:00 amPRNLIM announces C$30 million equity financing
24th Sep 20124:40 pmRNSSecond Price Monitoring Extn
24th Sep 20124:35 pmRNSPrice Monitoring Extension
14th Sep 20127:00 amPRNLIM AGM and Operations Update
11th Sep 20122:15 pmPRNDirector/PDMR Shareholding
7th Sep 201212:20 pmPRNResult of AGM held 6 Sept 12
4th Sep 201211:09 amPRNLIM Operations Update and Outlook
15th Aug 201212:09 pmPRNIMS and LIM first quarter results
10th Aug 201212:15 pmPRNLIM new rail feasibility study
1st Aug 201210:44 amPRNTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.