The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.50
High: 1.52
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Parys Mountain - Positive Preliminary Results from Metallurgical Testwork

4 Dec 2023 07:00

Anglesey Mining Plc - Parys Mountain - Positive Preliminary Results from Metallurgical Testwork

Anglesey Mining Plc - Parys Mountain - Positive Preliminary Results from Metallurgical Testwork

PR Newswire

LONDON, United Kingdom, December 04

 

 

Trading Symbol

AIM: AYM

 

4th December 2023

 

Anglesey Mining plc

(“Anglesey” or “the Company”)

 

Parys Mountain – Positive Preliminary Results from Metallurgical Testwork

 

Anglesey Mining plc (AIM:AYM), the UK minerals development company, is pleased to report that it has received preliminary results from the metallurgical testwork on the White Rock and Engine Zones at the Company’s Parys Mountain Cu-Zn-Pb-Ag-Au project, located on the Isle of Anglesey.

 

In June, the Company dispatched a 340kg sample to Grinding Solutions Limited (GSL) comprising a blend of material from both the White Rock and Engine Zones with a combined head-grade of 0.42% Cu, 3.60% Zn, 3.08% Pb, 49g/t Ag and 0.7g/t Au (10.8% ZnEq). The blend was 3.3 (White Rock) to 1.0 (Engine Zone), similar to the contribution that is expected to be delivered from the mine in the early years of production, prior to the Northern Copper Zone commencing.

 

Highlights

 

Two pre-concentration methods were conducted – Dense Media Separation (DMS) undertaken by Pesco and X-Ray Transmission sorting (XRT) completed by TOMRA. One element of the testwork was to determine the optimal process to take forward into the Pre-Feasibility Study.  Both methods demonstrated that a successful pre-concentration stage would be applicable with the overall base metals only head-grade increasing from 7.5% ZnEq to 11.4% ZnEq from the DMS (+52%) and 11.7% ZnEq from the XRT (+55%) – results will be updated once the gold and silver numbers are finalised – the precious metals are expected to add 3-4% to the ZnEq grade. The preliminary results are tabulated below:

 

 

Zn (%)

Pb (%)

Cu (%)

ZnEq (%)

Mass Rejection (%)

Metal Loss (%)

Original Sample

3.6

3.1

0.42

7.5

-

-

DMS Results

6.4

3.8

0.60

11.4

35

5.2

XRT Results

6.4

3.7

0.70

11.7

29

3.0

 

Preliminary results from the locked-cycle flotation testwork demonstrated higher recoveries than those achieved in historical testing. These results are based on calibrated pXRF readings with the full wet chemistry expected over the coming 2-3 weeks. The results are tabulated below:

 

 

Cu Concentrate

Zn Concentrate

Pb Concentrate

Au Concentrate

 

Cu Grade

Recovery

Zn Grade

Recovery

Pb Grade

Recovery

Au Grade

Recovery

PEA Estimates

21.8

56

56.2

82

51.8

76

n/a

40

GSL Testwork

31.5

74

50.7

86

56.4

80

300

65

Difference

 

+32%

 

+5%

 

+5%

 

+63%

 

Testwork with regards to net acid generation, settling rates and contact leaching on the tailings is ongoing with results expected over the next 2-3 weeks. In addition, GLS will also be completing a diagnostic leach test on the final zinc tailings to ensure optimal recovery of gold.

 

 

Jo Battershill, Chief Executive of Anglesey Mining, commented: “We are very pleased by the preliminary results from the metallurgical testwork on the White Rock and Engine Zones, which have demonstrated that the assumptions used in the 2021 PEA are potentially on the conservative side. The results show that the overall metal recoveries appear to be better than expected, particularly for both copper and gold. It is also very positive to confirm that the Parys Mountain deposit is amenable to both DMS and XRT pre-concentration methods with the potential feed grade increased by over 50%.”

“Successful pre-concentration has many benefits ranging from increased feed grade into the processing plant, lower volumes of tailings for disposal and the potential to build smaller, lower cost processing infrastructure. We will now look to investigate the relevant capital and operating costs for each option to determine which is the most optimal route to move forward with in the planned Pre-Feasibility Study.”

About Anglesey Mining plc

Anglesey Mining is traded on the AIM market of the London Stock Exchange and currently has 420,093,017 ordinary shares on issue.

 

Anglesey is developing its 100% owned Parys Mountain Cu-Zn-Pb-Ag-Au deposit in North Wales, UK with a reported resource of 5.3 million tonnes at over 4.0% combined base metals in the Measured and Indicated categories and 10.8 million tonnes at over 2.5% combined base metals in the Inferred category.

Anglesey also holds an almost 50% interest in the Grängesberg Iron project in Sweden, together with management rights and a right of first refusal to increase its interest to 100%.  Anglesey also holds 12% of Labrador Iron Mines Holdings Limited, which through its 52% owned subsidiaries, is engaged in the exploration and development of direct shipping iron ore deposits in Labrador and Quebec.

 

 

For further information, please contact:

Anglesey Mining plc

Jo Battershill, Chief Executive – Tel: +44 (0)7540 366000

Andrew King, Interim-Chairman – Tel: +44 (0)7825 963700

 

Davy

Nominated Adviser & Joint Corporate Broker

Brian Garrahy / Daragh O’Reilly – Tel: +353 1 679 6363

 

WH Ireland

Joint Corporate Broker

Katy Mitchell / Harry Ansell – Tel: +44 (0) 207 220 1666

 

 

 

LEI: 213800X8BO8EK2B4HQ71

 


3887169_0.png

Date   Source Headline
26th Oct 201112:31 pmPRNHolding(s) in Company
4th Oct 20117:00 amPRNFirst shipment of LIM iron ore sails to China
23rd Sep 20118:30 amPRNLIM reviews mine start-up at its AGM
13th Sep 20117:00 amPRNLIM added to S & P / TSX smallcap index
8th Sep 20119:11 amPRNResult of AGM
6th Sep 201111:00 amPRNLIM production update - second ore train operating
25th Aug 20111:42 pmPRNAnnual Report and Accounts
19th Aug 20113:00 pmPRNInterim Management Statement & LIM update
19th Aug 20112:12 pmPRNInterim Management Statement
15th Aug 201112:09 pmPRNLIM signs iron ore sales agreement
28th Jul 20117:00 amPRNFinal Results
5th Jul 201112:16 pmPRNTransfer of part of director's shareholding
30th Jun 201112:12 pmPRNLIM operations update & annual financial results
7th Jun 20112:42 pmPRNLIM agreement with Innu Matimekush
27th May 20111:23 pmPRNLIM mining & plant commissioning underway
19th May 20111:17 pmPRNChange of Adviser - Ambrian appointed as broker
28th Apr 20111:13 pmPRNLIM rail agreement with Genesee
27th Apr 20117:08 amPRNLIM equity financing C$110m completed
21st Apr 20112:30 pmPRNHolding(s) in Company
5th Apr 20115:03 pmPRNLIM equity financing of C$110 million
5th Apr 20113:56 pmPRNIssue of equity & director's share dealing
5th Apr 20112:55 pmPRNApplication for Block Listing
5th Apr 201110:02 amPRNEquity financing for Labrador Iron
29th Mar 201112:15 pmPRNLIM's Houston deposit shows increased resources
18th Mar 20117:00 amPRNLIM technical report on iron ore projects
10th Mar 201112:26 pmPRNLIM Signs Rail Transportation Agreement
4th Mar 20115:14 pmPRNNew resource estimate at LIM's Denault deposit
25th Feb 20117:00 amPRNLIM Railway Agreement
18th Feb 20115:02 pmPRNInterim Management Statement
15th Feb 20113:52 pmPRN3rd Quarter Results for LIM and outlook
11th Feb 20113:05 pmPRNDrilling Report - LIM’s Houston Deposits
10th Jan 20118:01 amPRNIssue of Equity - share placing
21st Dec 20102:06 pmPRNLIM’s Mine Construction Nearing Completion
20th Dec 201012:11 pmPRNLIM signs Agreement with Uashaunnuat Innu
26th Nov 20107:00 amPRNHalf-Yearly Report
26th Nov 20107:00 amPRNHalf-Yearly Report
15th Nov 201011:23 amPRNHalf-yearly Report LIM
22nd Oct 201012:25 pmPRNLIM on Target to Complete Plant Construction by Year End
24th Sep 20103:42 pmPRNResult of AGM and Total Voting Rights
20th Sep 20104:23 pmPRNHolding(s) in Company
16th Sep 20107:00 amPRNTrading Statement - Labrador AGM
14th Sep 20103:00 pmPRNTrading Statement - Labrador Iron Operations Approved
10th Sep 20107:00 amPRNTrading Statement - Agreement with Naskapi Nation
3rd Sep 201010:00 amPRNTrading Statement - Labrador barriers to be removed
27th Aug 201011:53 amPRNInterim Management Statement
16th Aug 201012:05 pmPRNTrading Statement - Labrador Q1 results and update
29th Jul 20107:00 amPRNon Labrador Iron operations
22nd Jul 20101:32 pmPRNFinal Results
12th May 20094:41 pmRNSSecond Price Monitoring Extn
12th May 20094:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.