Q2 2025 Operations Update

15 Jul 2025 07:00

RNS Number : 0075R
Atalaya Mining Copper, S.A.
15 July 2025
 

 

15 July 2025

Atalaya Mining Copper, S.A.

("Atalaya" or "the Company")

Q2 2025 Operations Update

Consistent performance continues, resulting in a growing cash position

 

Atalaya Mining (LSE: ATYM) is pleased to announce its operations update for the second quarter of 2025 ("Q2 2025" or the "Period").

Proyecto Riotinto Operating Highlights

Q2

Q1

Full Year

2025(1)

2024

2025

2025 Guidance

Ore mined

M tonnes

3.5

3.8

3.7

15 - 16

Waste mined(2)

M tonnes

12.6

7.5

11.3

37 - 43

Ore processed

M tonnes

4.0

4.1

4.2

15.5 - 15.8

Copper grade

%

0.43

0.33

0.42

0.38 - 0.42

Copper recovery

%

76.75

85.81

80.98

78 - 82

Copper production

tonnes

13,175

11,583

14,291

48,000 - 52,000

(1) Figures for Q2 2025 are preliminary and final figures will be released with Q2 2025 Financial Results.

(2) Represents the Cerro Colorado pit only.

Alberto Lavandeira, CEO, commented:

"We are pleased to announce another quarter of consistent performance at Riotinto, which provides confidence in our full year outlook.

With the regulatory approval of the San Dionisio area, the start of drilling at San Antonio and the confirmation of high-grade copper zones at Masa Valverde, we continue to advance our strategy of delivering higher grades to our plant at Riotinto while optimising the use of our existing infrastructure.

The review of documents related to the environmental permit at Proyecto Touro continued to advance, and we remain confident that we will achieve a positive outcome for this potential new source of copper in Europe.

With our growing cash position, we are well-placed to deliver on our organic copper growth pipeline. Copper is increasingly being viewed as a strategic commodity, as highlighted by recent legislation in the U.S. and the competitive environment for copper assets."

Q2 2025 Operating Results

Mining

Ore mined was 3.5 million tonnes in Q2 2025 (Q2 2024: 3.8 million tonnes), compared with 3.7 million tonnes in Q1 2025.

Waste mined was 12.6 million tonnes in Q2 2025 (Q2 2024: 7.5 million tonnes), compared with 11.3 million tonnes in Q1 2025. In addition, waste stripping activities continued at the San Dionisio area.

Processing

The plant processed ore of 4.0 million tonnes in Q2 2025 (Q2 2024: 4.1 million tonnes), compared with 4.2 million tonnes in Q1 2025. The next SAG mill liner change will be completed in Q3 2025.

Copper grade was 0.43% in Q2 2025 (Q2 2024: 0.33%), compared with 0.42% in Q1 2025.

Copper recovery was 76.75% in Q2 2025 (Q2 2024: 85.81%), compared with 80.98% in Q1 2025. Recoveries in Q2 2025 were impacted by the characteristics of certain ores, however, this material contributed much higher grades than the average plant feed during the Period.

Production

Copper production was 13,175 tonnes in Q2 2025 (Q2 2024: 11,583 tonnes), compared with 14,291 tonnes in Q1 2025, mainly as a result of higher copper grades but partly offset by lower recoveries.

On-site copper concentrate inventories were 10,368 tonnes at 30 June 2025 (31 March 2025: 19,031 tonnes).

Copper contained in concentrates sold was 14,024 tonnes in Q2 2025 (Q2 2024: 11,397 tonnes), compared with 14,687 tonnes in Q1 2025.

Select Financial Highlights

Realised Copper Price

The average realised copper price (excluding QPs closed during the Period) was $4.27/lb in Q2 2025 (Q2 2024: $4.54/lb), compared with $4.26/lb in Q1 2025. The average spot copper price was $4.32/lb in Q2 2025.

Provisional Revenue Adjustments

For Q2 2025, settlement adjustments (for QPs closed during the Period) and fair value adjustments (for open QPs based on copper forward curve prices as of 30 June 2025) were positive €2.2 million.

Balance Sheet

The Company's balance sheet remains strong with consolidated cash and cash equivalents of €103.0 million as of 30 June 2025 (31 December 2024: €52.9 million).

Current and non-current borrowings were €32.9 million, resulting in a net cash position of €70.1 million as of 30 June 2025 (31 December 2024: €35.1 million).

Outlook for 2025

Atalaya is pleased with Riotinto's performance in H1 2025, which puts the Company in a strong position to deliver on its full-year targets.

Guidance for 2025 remains unchanged, including copper production of 48,000 - 52,000 tonnes (weighted slightly towards H1 2025) and Cash Cost and AISC of $2.70 - 2.90/lb and $3.20 - 3.40/lb copper payable, respectively.

Asset Portfolio Update

Proyecto Riotinto

On 15 May 2025, San Dionisio was granted the Unified Environmental Authorisation (or in Spanish, Autorización Ambiental Unificada ("AAU")) by the Junta de Andalucía ("JdA"), which allows for the expansion of mining activities. During Q2 2025, waste stripping activities continued at San Dionisio with total material mined of 1.0 million tonnes, and in H2 2025, mining activities are expected to accelerate. San Dionisio represents a key component of Atalaya's strategy to increase copper production by sourcing higher-grade material from deposits throughout the Riotinto District to be blended with ore from Cerro Colorado.

With respect to the planned relocation of the A-461 road that currently runs between Cerro Colorado and San Dionisio, the project is progressing well and major works are expected during H2 2025.

At San Antonio, the polymetallic deposit located immediately east of the Cerro Colorado pit, an infill and step-out drilling programme began in June.

E-LIX Phase I Plant

Ramp-up activities continued at the E-LIX Phase I plant. During Q2 2025, further progress was made in relation to optimising and debottlenecking the circuits to increase capacity, with the novel leaching section continuing to perform well. Focus remains on leaching the zinc contained within Atalaya's copper concentrates due to the low copper treatment charge environment, thereby producing upgraded copper concentrates and zinc precipitates. 

Once fully operational, the E-LIX plant is expected to produce high-purity copper or zinc metals and intermediate products (such as metal precipitates) on site, allowing the Company to potentially achieve higher metal recoveries from complex polymetallic ores, lower transportation charges and a reduced carbon footprint.

Riotinto District - Proyecto Masa Valverde ("PMV")

On 10 July 2025, the Company announced results from its ongoing drilling programme at PMV, where two rigs are active and are focused on infill and extensional drilling at the Masa Valverde deposit.

Notable high-grade copper zone drilling results included 25 metres at 2.93% Cu (MJ65), 46 metres at 2.11% Cu (MJ76) and 26 metres at 2.78% Cu (MJ79), including 10 metres at 4.39% Cu. The results are primarily associated with stockwork-style mineralisation, which is expected to be amenable for processing at the existing Riotinto facilities. Recent drilling supports Atalaya's initial focus on the Masa Valverde copper zones, which are expected to be mined via the planned access ramp. Development of the access ramp is expected to begin once the purchase of certain surface rights is completed, subject to final Board approval.

PMV has been granted the two key permits required for development - the Unified Environmental Authorisation (or in Spanish, Autorización Ambiental Unificada ("AAU")) and the exploitation permit.

Proyecto Touro

On 24 June 2024, Atalaya announced that Proyecto Touro, via its local entity Cobre San Rafael, was declared a strategic industrial project by the Council of the Xunta de Galicia ("XdG"). Under legislation of the Autonomous Community of Galicia, the status of strategic industrial project (or in Spanish, Proyecto Industrial Estratégico ("PIE")) acts to simplify the administrative procedures associated with the development of industrial projects and intends to substantially reduce permitting timelines.

This declaration highlights the XdG's commitment to promoting new investment that will benefit the region and also support the objectives of the European Union. Copper is considered a strategic raw material by the EU and this project has the potential to become a new source of sustainable European copper production.

The XdG is continuing its review according to the simplified procedures afforded to projects with PIE status. The public information period, which serves to inform the surrounding communities and organisations about the proposed project, concluded on 31 January 2025. Cobre San Rafael has addressed the feedback from the public information period, and most sectoral reports from the Xunta de Galicia have been finalised, with only three reports still pending. The company has also responded to requests for additional information and is awaiting the corresponding replies. Progress on the planned power transmission line continues, with agreements already secured with a significant number of landowners.

The Company continues to engage with the many stakeholders in the region and is restoring the water quality of the rivers around Touro by operating its water treatment plant. The Company has also intensified its recruitment initiatives in relation to its potential future workforce.

Plant engineering is progressing, focused on cost optimisation. Additionally, the search for contractors has started. Finally, infill and step-out drilling programmes continue, with the objective of determining the limits of mineral orebodies both at depth and laterally.

Proyecto Ossa Morena

A step-out drilling programme is underway at the flagship Alconchel-Pallares copper-gold project.

Proyecto Riotinto East

Gravimetric ground surveys have been completed in order to better define future drill targets on the East Belt extension, and soil geochemistry works are nearing completion at two targets.

Skellefte Belt and Rockliden (Sweden)

In November 2024, Atalaya announced that it had entered into two binding agreements with Mineral Prospektering i Sverige AB ("MPS") pursuant to which Atalaya can earn an initial 75% interest in two separate land packages in Sweden. The Skellefte Belt land package ("Skellefte Belt Project") and the Rockliden land package ("Rockliden Project") are located in two notable districts that host many large-scale volcanogenic massive sulphide ("VMS") deposits and mines owned by Boliden AB. Both regions are underexplored and could increase Atalaya's exposure to critical minerals in Europe.

Following the winter drilling programmes, complete assays are still pending. At Bjurtraskgruvan, encouraging results from step-out drilling have been received, including:

· 25SBJK015:

From 299.50m, 8.65m at 0.42% Cu, 1.49% Zn, 4.94g/t Ag, 0.12g/t Au (including 2.45m at 0.25% Cu, 4.78% Zn, 5.99g/t Ag, 0.19g/t Au)

· 25SBJK016:

From 263.35m, 4.25m at 0.16% Cu, 7.93% Zn, 4.80g/t Ag, 0.23g/t Au (including 1.70m at 0.06% Cu, 18.51% Zn, 5.24g/t Ag, 0.38g/t Au)

From 275.65m, 8.65m at 0.61% Cu, 2.66% Zn, 12.21g/t Ag, 0.47g/t Au (including 3.85 m at 0.67% Cu, 4.25% Zn, 14.65g/t Ag, 0.82 g/t Au)

· 25SBJK017:

From 98.20m, 4.50m at 1.84% Cu, 0.12% Zn, 14.36g/t Ag, 0.14g/t Au (including 1.20m at 5.14% Cu, 0.30% Zn, 39.6g/t Ag, 0.40g/t Au)

From 163.75m, 10.65m at 2.21% Cu, 0.29% Zn, 10.89g/t Ag, 0.18g/t Au (including 2.95m at 6.35% Cu, 0.70% Zn, 31.79g/t Ag, 0.39g/t Au)

Additionally, results from a geophysical Borehole TEM (BHEM) survey in the new Bjurtraskgruvan drill holes indicate that the "plates" are more extensive than originally thought, potentially increasing the size of the deposit. Further testing will be completed in the winter 2025-2026 drilling season.

An airborne electromagnetic survey (VTEM) is underway in order to provide detailed coverage of the Mid-Skellefte Belt, with results and preliminary interpretation expected in late 2025.

Corporate Activities Update

Indexation

Effective from 7 May 2025, Atalaya's shares were added to the FTSE 250 Index. This milestone is expected to enhance the Company's visibility to institutional investors.

2025 Annual General Meeting ("AGM")

All resolutions put to the Company's 2025 AGM were passed by the requisite majorities, including the approval of the 2024 Final Dividend of US$0.03 (€0.0275) per share, which will be paid on 23 July 2025.

Board of Directors

Following the conclusion of the Company's 2025 AGM, Hussein Barma stepped down as an independent non-executive director and Hennie Faul was appointed as an independent non-executive director of the Company. As a result, several changes were made in relation to the composition of the Board's various committees.

Technical Information

The technical information in this announcement that relates to Proyecto Masa Valverde and the Skellefte Belt Project has been compiled by Juan Manuel Pons Pérez, senior geologist and employee of the Company. Juan Manuel Pons Pérez has over 35 years' experience, is a member of good standing with the College of Geologists of Andalucía and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person. Juan Manuel Pons Pérez consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

Contacts:

SEC Newgate UK

Elisabeth Cowell / Tom Carnegie / Gwen Samuel

+44 20 3757 6882

Atalaya Mining

Michael Rechsteiner

+34 959 59 28 50

About Atalaya Mining Copper, S.A.

Atalaya is a European copper producer that owns and operates the Proyecto Riotinto complex in southwest Spain. Atalaya's shares trade on the London Stock Exchange's Main Market under the symbol "ATYM" and Atalaya is a FTSE 250 Index constituent.

Atalaya's operations include the Cerro Colorado open pit mine and a modern 15 Mtpa processing plant, which has the potential to become a central processing hub for ore sourced from its wholly owned regional projects around Riotinto, such as Proyecto Masa Valverde and Proyecto Riotinto East. In addition, Atalaya has a phased earn-in agreement for up to 80% ownership of Cobre San Rafael S.L., which fully owns the Proyecto Touro brownfield copper project in the northwest of Spain, as well as a 99.9% interest in Proyecto Ossa Morena. For further information, please visit www.atalayamining.com

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDDZLFFEDLFBBB
Date   Source Headline
12th Oct 20097:00 amRNSBiely Vrch Gold Mine - positive scoping study
30th Sep 20097:00 amRNSProyecto Rio Tinto Update
24th Sep 20097:00 amRNSInterim Results
12th Aug 20098:45 amRNSResult of EGM
30th Jul 20097:00 amRNSQuarterly Report
27th Jul 20097:00 amRNS?2.9 million Placing
1st Jul 20099:30 amRNSProyecto Rio Tinto - Copper Project Update
23rd Jun 20099:00 amRNSManaging Directors AGM Presentation
19th Jun 20099:00 amRNSProyecto Rio Tinto Laboratory Update
18th Jun 20094:35 pmRNSManaging Director Presentation
11th Jun 200910:30 amRNSFinance Facility Update
9th Jun 20099:46 amRNSConvertible Loan Financing Update
5th Jun 20094:16 pmRNSIssue of share options
1st Jun 200910:30 amRNSChairman's AGM Statement and Result of AGM
29th May 20097:00 amRNSFinance Facility Update
26th May 20097:00 amRNSUpdate on Gold Exploration in Slovakia
15th May 20099:30 amRNSIssue of Shares
11th May 20097:00 amRNSFinal Results
1st May 20099:07 amRNSIssue of Shares
7th Apr 20097:00 amRNSQuarterly Report
2nd Apr 20097:00 amRNSNotice of AGM
1st Apr 20097:00 amRNSDrawdown of Tranche A of Convertible Loan
23rd Mar 20098:32 amRNSResult of EGM
20th Mar 20093:15 pmRNSIssue of Shares
5th Mar 20097:00 amRNSConvertible Secured Loan Facility
24th Feb 20092:41 pmRNSIssue of Shares
23rd Feb 20097:00 amRNSSlovakia drilling update
12th Feb 20099:22 amRNSBridging Finance Facility
11th Feb 200910:41 amRNSIssue of Shares
2nd Feb 20097:00 amRNSQuarterly Report
21st Jan 200910:56 amRNSTermination of GMP Securities Europe as Co-Broker
14th Jan 200912:37 pmRNSResignation of Director
1st Dec 20087:00 amRNSUPDATE ON GOLD EXPLORATION IN SLOVAKIA
25th Nov 20087:00 amRNSExtension of Mine Life Plan
14th Nov 20087:00 amRNSAppointment of Lead-arranger for Financing
29th Oct 20087:01 amRNSQuarterly Report
29th Oct 20087:00 amRNSAppointment of Director
21st Oct 20087:00 amRNSAppointment of Director
13th Oct 20088:40 amRNSSignificant Shareholdings &Proposed New Directors
13th Oct 20088:26 amRNSSignificant Shareholdings and Proposed New Direct
6th Oct 200810:44 amRNSNotification of Significant Shareholding
1st Oct 20087:00 amRNSRestructure Of Rio Tinto Project Acquisition
22nd Sep 200812:23 pmRNSInterim Results
17th Sep 20089:29 amRNSSlovakian Update
12th Sep 20088:53 amRNSShare price movement
26th Aug 20087:00 amRNSQuarterly Report
19th Aug 20089:40 amRNSSlovakia Drilling Update
12th Jun 20089:32 amRNSPositive drilling results in
5th Jun 200810:57 amRNSRe Loan Agreement
4th Jun 20083:57 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.