We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAtalaya Mining Regulatory News (ATYM)

Share Price Information for Atalaya Mining (ATYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 425.00
Bid: 422.50
Ask: 425.00
Change: -3.00 (-0.70%)
Spread: 2.50 (0.592%)
Open: 430.00
High: 430.00
Low: 421.00
Prev. Close: 428.00
ATYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

First Quarter 2017 Operations Update

20 Apr 2017 07:00

RNS Number : 7860C
Atalaya Mining PLC
20 April 2017
 

 

Atalaya Mining Plc

("Atalaya" or the "Company")

 

First Quarter 2017 Operations Update

 

Atalaya Mining plc (AIM:ATYM, TSX:AYM), the European mining and development company, announces its operations update for the three months to 31 March 2017.

 

PROYECTO RIOTINTO

 

 

First Quarter

Fourth Quarter

Full year forecast

2017

2016 *

2016

2017

Ore mined

(M tonnes)

2.3

1.1

2.3

9.5 - 9.8

Waste mined

(M tonnes)

4.3

2.7

3.6

18.1 - 18.2

Ore milled

(M tonnes)

2.2

1.1

2.0

9.5

Cu grade

(%)

0.48

0.43

0.52

0.49 - 0.51

Cu recovery

(%)

84.63

82.93

84.47

79 - 82

Cu production

(tonnes)

8,805

4,048

8,938

34,000 - 40,000

Cash cost

($/lb payable)

1.83

2.28

1.95

1.90 - 2.10

All-in cost

($/lb payable)

2.15

2.55

2.15

2.00 - 2.20

Sustaining capital

($ millions)

0.6

0

0.4

2.1

 

*Note: Commercial production declared 1 February 2016.

 

Production results at Proyecto Riotinto were in line with targets for the quarter ended 31 March 2017. The operation set new records for both throughput tonnage and copper recovery as 2.2 million tonnes of ore were milled at a recovery rate of 84.63%. Full year annual forecasts for copper remain as previously guided at 34,000 - 40,000 tonnes.

 

Mining operations continue to run according to mine plans. Blending different ore types from the Cerro Colorado pit has provided consistent feed quality to the processing plant which resulted in higher than anticipated metallurgical recoveries and concentrate grades. Adjustments to geological modelling are currently under evaluation to improve mine-to-mill efficiencies. Drilling and blasting parameters have been adjusted to improve fragmentation, loading rates and crushing capacity.

 

Surface re-contouring on the south waste dump has been initiated as part of ongoing rehabilitation works and additional rehabilitation methodologies are being evaluated.

 

On-site concentrate inventories at the end of the quarter were reduced to minimum levels. Concentrate deliveries to the port at Huelva amounted to 41,131 tonnes. Concentrate sales were not affected by disruptions at other ports across Spain.

 

Cash costs during Q1 2017 of $1.83/lb of copper were lower than in the same period in 2016 when operations were starting to ramp up and also as compared with Q4 2016 owing to lower penalty levels and lower TC/RCs. The full year forecast remains as previously guided with a range of $1.90/lb to $2.10/lb.

 

Sustaining capital for the quarter was $0.6 million with a full year forecast of $2.1 million. The majority of spending in the quarter related to improvements in process water supply and services, modifications to the processing flowsheet and upgrades at the main incoming substation. A number of studies are under way to further debottleneck processing capacity. Capital will also be allocated to improve environmental requirements.

 

Accumulated capitalized stripping since the start of operations amounted to $18.8 million slightly lower than the forecast as less waste than expected was mined.

 

Copper prices continued to rise in Q1 2017, with an average price realised of $2.48/lb, compared with an average of $2.18/lb for Q4 2016.

 

Near-mine exploration drilling is under way with one RC drilling rig and one DDH rig. The programme is designed to confirm the lateral extension of Filon Sur as well as the northern extension of the Atalaya pit. During the quarter 2,660 m have been drilled out of a total of 7,200 m at Filon Sur and at the Atalaya pit.

 

An in-fill drilling campaign of 4,400 m at Cerro Colorado is also under way with one RC drilling rig. This campaign is targeting inferred resources with the objective of increasing confidence levels and potential reclassification.

 

PROYECTO TOURO

As previously announced, the Company exercised an option to acquire a 10% interest in Proyecto Touro located in northwest Spain. The acquisition of the project is based on a staged earn-in agreement increasing from 10% and up to an 80% interest once commercial production is declared.

 

The permitting process has been initiated during Q1 2017, with submission to the relevant authorities of the environmental impact study, exploitation plan and rehabilitation plan. Geological, hydrogeological and geotechnical studies have also been completed and incorporated into the study.

 

In-fill and step-out drilling is ongoing across the property with two RC drilling rigs and one DDH rig for a campaign of 7,900 m. Resource modelling is well advanced based on both historic and current knowledge of the deposit.

 

Metallurgical test work at feasibility study level was completed during 2016 with modelling confirmed based on this latest information. Further details will be released before the end of the second quarter.

 

Basic engineering is progressing with a view to completing a capital and operating cost estimate as part of the study. Long-lead items have been identified together with suppliers' quotations.

 

 

Alberto Lavandeira, CEO commented: "Since reaching nameplate capacity at Riotinto at the end of 2016, the plant continues to run smoothly and we are on track to meet our production targets. While our aim is to seek further operating efficiencies within the plant, we are also focused on infill and near-mine exploration drilling in order to maintain our 16-year mine life and extend our reserves and resources. We have also carried out an extensive drilling programme at Proyecto Touro and are pleased with the progress made to date."

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) No 596/2014.

Contacts:

Atalaya Mining plc

Roger Davey / Alberto Lavandeira

+34 959 59 28 50

Canaccord Genuity (NOMAD and Joint Broker)

Henry Fitzgerald-O'Connor / Martin Davison

+44 20 7523 8000

BMO Capital Markets (Joint Broker)

Jeffrey Couch/Neil Haycock/Tom Rider

+44 20 7236 1010

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFFRSTIALID
Date   Source Headline
11th Apr 20247:00 amRNSQ1 2024 Operations Update
19th Mar 20247:00 amRNS2023 Annual Results
8th Mar 20247:00 amRNSNotice of 2023 Annual Results
9th Feb 20247:00 amRNSIssue of Equity
18th Jan 20247:00 amRNSQ4 Operations Update and 2024 Production Guidance
21st Dec 20237:01 amRNSUpdate on Move to Main Market
21st Dec 20237:00 amRNSHolding(s) in Company
21st Dec 20237:00 amRNSHolding(s) in Company
20th Dec 20237:00 amRNSHolding(s) in Company
14th Dec 20231:49 pmRNSExtension of Port Handling Agreement
12th Dec 202311:28 amRNSResults of the 2023 Extraordinary General Meeting
12th Dec 20237:00 amRNS2023 Extraordinary General Meeting Statement
1st Dec 20237:00 amRNSHistorical Related Party Transactions
20th Nov 20237:00 amRNSHolding(s) in Company
16th Nov 20237:00 amRNSQ3 and YTD 2023 Financial Results
14th Nov 20237:00 amRNSProposed Re-domiciliation and Notice of EGM
13th Nov 20237:00 amRNSIntention to Move from AIM to Main Market
2nd Nov 20237:00 amRNSNotice of Q3 and YTD 2023 Financial Results
12th Oct 20237:00 amRNSQ3 2023 Operations Update
10th Oct 20233:11 pmRNSDirector/PDMR Shareholding
12th Sep 20237:00 amRNSInterim Dividend Foreign Exchange Rates
10th Aug 20237:00 amRNSQ2 and H1 2023 Financial Results
27th Jul 20237:00 amRNSNotice of Q2 and H1 2023 Financial Results
20th Jul 20237:00 amRNSFinal Dividend Foreign Exchange Rates & Payment
20th Jul 20237:00 amRNSCorrection to Q2 Provisional Revenue Adjustments
12th Jul 20237:00 amRNSQ2 2023 Operations Update
10th Jul 20237:00 amRNSPDMR Shareholding
29th Jun 20237:00 amRNS2022 Final Dividend Timetable
28th Jun 202311:25 amRNSResults of the 2023 Annual General Meeting
28th Jun 20237:00 amRNS2023 Annual General Meeting Statement
26th Jun 20237:00 amRNSReport on Payments to Governments
26th Jun 20237:00 amRNSApproval to Cease to be Reporting in Canada
1st Jun 20237:00 amRNSNotice of AGM
30th May 20237:00 amRNSApplication to Cease to be a Reporting Issuer
23rd May 20237:00 amRNSGrant of Share Options and PDMR Notification
16th May 20237:00 amRNSPublication of 2022 Sustainability Report
15th May 20237:00 amRNSQ1 2023 Financial Results
2nd May 20237:00 amRNSNotice of Q1 2023 Results
17th Apr 20237:00 amRNSQ1 2023 Operations Update
28th Mar 20237:00 amRNSEnvironmental Authorisation Granted to PMV
24th Mar 20237:00 amRNSFiling of New Riotinto PEA Technical Report
23rd Mar 20234:35 pmRNSPrice Monitoring Extension
22nd Mar 20237:00 amRNS2022 Annual Results
15th Mar 20237:00 amRNSNotice of 2022 Annual Results
13th Mar 20237:00 amRNSUpdate on Voluntary Delisting From The TSX
23rd Feb 20237:00 amRNSResults of New PEA for Riotinto
20th Feb 20237:00 amRNSVoluntary Delisting from the TSX
17th Jan 20237:00 amRNSQ4 Operations Update and 2023 Production Guidance
12th Jan 20237:00 amRNSHolding(s) in Company
24th Nov 20227:00 amRNSUpdate on Exploration Activities

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.