Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAtalaya Mining Regulatory News (ATYM)

Share Price Information for Atalaya Mining (ATYM)

Share Price is delayed by 15 minutes
Get Live Data
889.00    3.50 (0.40%)
Bid:
889.50
Ask:
891.00
Spread: 1.50 (0.169%)
Market Cap: £1.37b
ATYM Live PriceLast checked at - London Stock Exchange

Intraday Atalaya Mining Share Chart

First Quarter 2017 Operations Update

20 Apr 2017 07:00

RNS Number : 7860C
Atalaya Mining PLC
20 April 2017
 

 

Atalaya Mining Plc

("Atalaya" or the "Company")

 

First Quarter 2017 Operations Update

 

Atalaya Mining plc (AIM:ATYM, TSX:AYM), the European mining and development company, announces its operations update for the three months to 31 March 2017.

 

PROYECTO RIOTINTO

 

 

First Quarter

Fourth Quarter

Full year forecast

2017

2016 *

2016

2017

Ore mined

(M tonnes)

2.3

1.1

2.3

9.5 - 9.8

Waste mined

(M tonnes)

4.3

2.7

3.6

18.1 - 18.2

Ore milled

(M tonnes)

2.2

1.1

2.0

9.5

Cu grade

(%)

0.48

0.43

0.52

0.49 - 0.51

Cu recovery

(%)

84.63

82.93

84.47

79 - 82

Cu production

(tonnes)

8,805

4,048

8,938

34,000 - 40,000

Cash cost

($/lb payable)

1.83

2.28

1.95

1.90 - 2.10

All-in cost

($/lb payable)

2.15

2.55

2.15

2.00 - 2.20

Sustaining capital

($ millions)

0.6

0

0.4

2.1

 

*Note: Commercial production declared 1 February 2016.

 

Production results at Proyecto Riotinto were in line with targets for the quarter ended 31 March 2017. The operation set new records for both throughput tonnage and copper recovery as 2.2 million tonnes of ore were milled at a recovery rate of 84.63%. Full year annual forecasts for copper remain as previously guided at 34,000 - 40,000 tonnes.

 

Mining operations continue to run according to mine plans. Blending different ore types from the Cerro Colorado pit has provided consistent feed quality to the processing plant which resulted in higher than anticipated metallurgical recoveries and concentrate grades. Adjustments to geological modelling are currently under evaluation to improve mine-to-mill efficiencies. Drilling and blasting parameters have been adjusted to improve fragmentation, loading rates and crushing capacity.

 

Surface re-contouring on the south waste dump has been initiated as part of ongoing rehabilitation works and additional rehabilitation methodologies are being evaluated.

 

On-site concentrate inventories at the end of the quarter were reduced to minimum levels. Concentrate deliveries to the port at Huelva amounted to 41,131 tonnes. Concentrate sales were not affected by disruptions at other ports across Spain.

 

Cash costs during Q1 2017 of $1.83/lb of copper were lower than in the same period in 2016 when operations were starting to ramp up and also as compared with Q4 2016 owing to lower penalty levels and lower TC/RCs. The full year forecast remains as previously guided with a range of $1.90/lb to $2.10/lb.

 

Sustaining capital for the quarter was $0.6 million with a full year forecast of $2.1 million. The majority of spending in the quarter related to improvements in process water supply and services, modifications to the processing flowsheet and upgrades at the main incoming substation. A number of studies are under way to further debottleneck processing capacity. Capital will also be allocated to improve environmental requirements.

 

Accumulated capitalized stripping since the start of operations amounted to $18.8 million slightly lower than the forecast as less waste than expected was mined.

 

Copper prices continued to rise in Q1 2017, with an average price realised of $2.48/lb, compared with an average of $2.18/lb for Q4 2016.

 

Near-mine exploration drilling is under way with one RC drilling rig and one DDH rig. The programme is designed to confirm the lateral extension of Filon Sur as well as the northern extension of the Atalaya pit. During the quarter 2,660 m have been drilled out of a total of 7,200 m at Filon Sur and at the Atalaya pit.

 

An in-fill drilling campaign of 4,400 m at Cerro Colorado is also under way with one RC drilling rig. This campaign is targeting inferred resources with the objective of increasing confidence levels and potential reclassification.

 

PROYECTO TOURO

As previously announced, the Company exercised an option to acquire a 10% interest in Proyecto Touro located in northwest Spain. The acquisition of the project is based on a staged earn-in agreement increasing from 10% and up to an 80% interest once commercial production is declared.

 

The permitting process has been initiated during Q1 2017, with submission to the relevant authorities of the environmental impact study, exploitation plan and rehabilitation plan. Geological, hydrogeological and geotechnical studies have also been completed and incorporated into the study.

 

In-fill and step-out drilling is ongoing across the property with two RC drilling rigs and one DDH rig for a campaign of 7,900 m. Resource modelling is well advanced based on both historic and current knowledge of the deposit.

 

Metallurgical test work at feasibility study level was completed during 2016 with modelling confirmed based on this latest information. Further details will be released before the end of the second quarter.

 

Basic engineering is progressing with a view to completing a capital and operating cost estimate as part of the study. Long-lead items have been identified together with suppliers' quotations.

 

 

Alberto Lavandeira, CEO commented: "Since reaching nameplate capacity at Riotinto at the end of 2016, the plant continues to run smoothly and we are on track to meet our production targets. While our aim is to seek further operating efficiencies within the plant, we are also focused on infill and near-mine exploration drilling in order to maintain our 16-year mine life and extend our reserves and resources. We have also carried out an extensive drilling programme at Proyecto Touro and are pleased with the progress made to date."

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) No 596/2014.

Contacts:

Atalaya Mining plc

Roger Davey / Alberto Lavandeira

+34 959 59 28 50

Canaccord Genuity (NOMAD and Joint Broker)

Henry Fitzgerald-O'Connor / Martin Davison

+44 20 7523 8000

BMO Capital Markets (Joint Broker)

Jeffrey Couch/Neil Haycock/Tom Rider

+44 20 7236 1010

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFFRSTIALID
Date   Source Headline
26th May 20267:00 amRNSQ1 2026 Financial Results
21st May 20267:00 amRNSNotice of AGM
13th May 20267:00 amRNSNotice of Results
28th Apr 20267:01 amRNSGrant of Conditional Share Awards
28th Apr 20267:00 amRNSPublication of 2025 Annual Reporting Documents
16th Apr 20265:04 pmRNSTR-1
14th Apr 20267:00 amRNSQ1 2026 Operations Update
10th Apr 202611:46 amRNSHolding(s) in Company
2nd Apr 20267:00 amRNSInvestment in Lara Exploration Ltd.
19th Mar 20267:00 amRNS2025 Annual Results
5th Mar 20267:00 amRNSNotice of 2025 Annual Results
9th Feb 20267:00 amRNSTR1 Notification of Major Holdings
4th Feb 20267:00 amRNSResults of placing in Atalaya Mining Copper, S.A.
3rd Feb 20264:45 pmRNSProposed placing - in Atalaya Mining Copper, S.A.
28th Jan 20267:00 amRNSSuccessful Fundraise
27th Jan 20264:39 pmRNSRetail Offer by RetailBook
27th Jan 20264:38 pmRNSProposed Fundraise to Accelerate Copper Project
14th Jan 20267:00 amRNSQ4 Operations Update and 2026 Production Guidance
9th Jan 202612:21 pmRNSHolding(s) in Company
30th Dec 20257:00 amRNSDirectorate Change
30th Dec 20257:00 amRNSDirectorate Change
19th Dec 20257:00 amRNSStatement Regarding Shareholder Consultation
19th Dec 20257:00 amRNSStatement Regarding Shareholder Consultation
10th Dec 20257:00 amRNSHolding(s) in Company
13th Nov 20257:00 amRNSQ3 and YTD 2025 Financial Results
30th Oct 20257:00 amRNSNotice of Q3 and YTD 2025 Financial Results
21st Oct 20257:00 amRNSQ3 2025 Operations Update
3rd Oct 202510:33 amRNSHolding(s) in Company
1st Oct 20259:35 amRNSHolding(s) in Company
30th Sep 20257:01 amRNSDirector/PDMR Shareholding
30th Sep 20257:00 amRNSHolding(s) in Company
18th Sep 20257:00 amRNSPDMR Share Dealings
17th Sep 20257:00 amRNSNotice for Holders of Physical Share Certificates
10th Sep 20257:00 amRNSResult of Secondary Placing
9th Sep 20254:43 pmRNSProposed placing in Atalaya Mining Copper, S.A.
12th Aug 20257:00 amRNSQ2 and H1 2025 Financial Results
23rd Jul 20257:00 amRNSNotice of Q2 and H1 2025 Financial Results
15th Jul 20257:00 amRNSQ2 2025 Operations Update
10th Jul 20257:01 amRNSMasa Valverde Drilling Update
10th Jul 20257:00 amRNSDirector/PDMR Shareholding
24th Jun 202511:59 amRNSBoard Committee Updates
24th Jun 202511:29 amRNSAGM 2025 – Voting Results
20th Jun 20257:00 amRNSAppointment of Director
4th Jun 20253:48 pmRNSDirector Declaration
2nd Jun 20257:00 amRNSFinal Dividend Timetable & Updated AGM Resolution
29th May 20257:00 amRNSQ1 2025 Financial Results
21st May 20257:00 amRNSNotice of Q1 2025 Financial Results
15th May 20257:00 amRNSSan Dionisio Granted Environmental Authorisation
14th May 20257:00 amRNSNotice of Annual General Meeting
2nd May 20257:00 amRNSFTSE 250 Index Inclusion

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.