Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAtalaya Mining Regulatory News (ATYM)

Share Price Information for Atalaya Mining (ATYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 429.00
Bid: 425.00
Ask: 427.50
Change: -9.50 (-2.17%)
Spread: 2.50 (0.588%)
Open: 445.00
High: 445.00
Low: 424.00
Prev. Close: 438.50
ATYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Atalaya to Start Construction of an E-LIX Plant

6 Jan 2022 07:00

RNS Number : 5724X
Atalaya Mining PLC
06 January 2022
 

06 January 2022

Atalaya Mining Plc.

("Atalaya" or the "Company")

 

Atalaya to Start Construction of an E-LIX Plant

Atalaya Mining Plc (AIM:ATYM, TSX:AYM) is pleased to announce that it has approved the construction of the first phase of an industrial-scale plant ("Phase I") that utilises the E-LIX System ("E-LIX"), which will produce high value copper and zinc metals from the complex sulphide concentrates sourced from Proyecto Riotinto.

Highlights

· Expected to unlock significant value from Atalaya's portfolio of polymetallic resources in the Riotinto District by materially increasing the recoveries of copper, zinc, lead and precious metals from complex sulphide ores.

 

· Producing high-purity metals on-site will reduce transportation costs, treatment charges and penalties associated with producing and delivering conventional concentrates.

 

· Expected to reduce Atalaya's carbon footprint through a reduction in land and sea freight and by utilising power from Proyecto Riotinto's planned solar plant.

 

Following its announcement on 28 October 2020, Atalaya has concluded a feasibility study that evaluated the technical and economic viability of producing cathodes from complex sulphide concentrates by applying E-LIX, a new electrochemical extraction process developed and owned by Lain Technologies Ltd ("Lain Tech") with the financial support of Atalaya. E-LIX is patented by Lain Tech.

Relative to conventional flotation techniques, the value creation potential of E-LIX offers a unique opportunity for Atalaya. As a result, as disclosed in the 28 October 2020 announcement, the Company has secured certain terms of exclusivity with Lain Tech for the use of E-LIX within the Iberian Pyrite Belt.

The E-LIX plant will dissolve the valuable metals contained within the concentrates. The testwork and system design allows for the dissolution of chalcopyrite while avoiding the passivation of particles. After copper or other metals are brought into solution, they can be recovered by conventional precipitation or solvent extraction followed by electrowinning ("SX-EW").

Phase I plant capacity has been designed to produce between 3,000 to 10,000 tonnes of copper or zinc metal per year depending on the ratio of copper to zinc in the concentrate feed.

The estimated capex for Phase I is €12 million and the design allows for unlimited capacity expansion through the addition of multiple lines in parallel. Atalaya will start the construction of the plant in the coming weeks and it is expected that the plant will be operational in 2022, including commissioning.

The decision to approve and construct the Phase I industrial-sized plant follows over six years of evaluation and de-risking work including continuous tests at the laboratory, a small pilot plant and finally a semi-industrial pilot plant.

A semi-industrial E-LIX pilot plant was constructed in late 2019 and has operated during 2020 and 2021 despite the challenges of the COVID-19 outbreak. The results of the pilot tests were included in the feasibility study and successive optimisation work. The long run continuous tests demonstrated the feasibility of leaching complex polymetallic concentrates with global recoveries of over 95% for copper and zinc while producing clean metal precipitates and/or high purity metals.

The use of the E-LIX System has shown the potential to unlock the significant value from the polymetallic sulphides contained within Atalaya's mineral resources, including:

· The polymetallic deposits of San Dionisio, San Antonio, Masa Valverde and Majadales, all of which are located in the Iberian Pyrite Belt and within trucking distance of Proyecto Riotinto's modern 15 Mtpa processing facility.

 

· The significant contained metal within these historical drilled resources from San Dionisio and Masa Valverde contain over 1.1 million tonnes of copper, 2.4 million tonnes of zinc, 1.7 million ounces of gold, over 110 million ounces of silver as well as additional lead resources. These figures are in addition to the over 1 million tonnes of copper reserve at Proyecto Riotinto's Cerro Colorado orebody and at Proyecto Touro.

 

· Historical applications of differential flotation within the Iberian Pyrite Belt in Spain and Portugal have typically resulted in recoveries of 60 - 80% into concentrates for complex copper-zinc polymetallic sulphides, with even lower recoveries historically reported for lead, silver and gold. The use of hydrometallurgical systems, such as E-LIX, has demonstrated that base metal recoveries of over 90% can be achieved.

 

E-LIX is also expected to reduce Atalaya's carbon footprint. By producing high-purity metals on-site, Atalaya can reduce the transportation costs associated with delivering concentrates to smelters, avoid treatment and refining charges associated with converting concentrates into metal, and eliminate penalties associated with deleterious elements often contained within concentrates produced in the Iberian Pyrite Belt and elsewhere. The E-LIX plant is also expected to utilise the renewable energy that will be produced by Proyecto Riotinto's planned solar plant.

 

Alberto Lavandeira, CEO commented:

 

"The E-LIX System offers Atalaya a unique opportunity to unlock significant value from its portfolio of deposits that contain complex polymetallic mineralisation. Atalaya has worked together with Lain Technologies for many years in order to test, refine and demonstrate the E-LIX process, providing the Company with confidence in its potential. In addition to enhancing recoveries, E-LIX will eliminate penalties associated with deleterious elements and reduce the costs of transportation and energy, thereby improving the Company's carbon footprint."

 

 

Contacts:

SEC Newgate UK

Elisabeth Cowell / Tom Carnegie

+ 44 20 3757 6880

4C Communications

Carina Corbett

+44 20 3170 7973

Canaccord Genuity

(NOMAD and Joint Broker)

Henry Fitzgerald-O'Connor / James Asensio

+44 20 7523 8000

BMO Capital Markets

(Joint Broker)

Tom Rider / Andrew Cameron

+44 20 7236 1010

Peel Hunt LLP

(Joint Broker)

Ross Allister / David McKeown

+44 20 7418 8900

 

About Atalaya Mining Plc

Atalaya is an AIM and TSX-listed mining and development group which produces copper concentrates and silver by-product at its wholly owned Proyecto Riotinto site in southwest Spain. Atalaya's current operations include the Cerro Colorado open pit mine and a modern 15 Mtpa processing plant, which has the potential to become a centralised processing hub for ore sourced from its wholly owned regional projects around Riotinto that include Proyecto Masa Valverde and Proyecto Riotinto East. In addition, the Group has a phased, earn-in agreement for up to 80% ownership of Proyecto Touro, a brownfield copper project in the northwest of Spain. For further information, visit www.atalayamining.com

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLBCGDBGXGDGDU
Date   Source Headline
29th Apr 20244:32 pmRNSHolding(s) in Company
29th Apr 20248:00 amRNSReadmission - ATALAYA MINING PLC
29th Apr 20247:00 amRNSAdmission to Trading on the Main Market
26th Apr 20245:00 pmRNSHolding(s) in Company
24th Apr 202412:51 pmRNSPublication of Prospectus
11th Apr 20247:00 amRNSQ1 2024 Operations Update
19th Mar 20247:00 amRNS2023 Annual Results
8th Mar 20247:00 amRNSNotice of 2023 Annual Results
9th Feb 20247:00 amRNSIssue of Equity
18th Jan 20247:00 amRNSQ4 Operations Update and 2024 Production Guidance
21st Dec 20237:01 amRNSUpdate on Move to Main Market
21st Dec 20237:00 amRNSHolding(s) in Company
21st Dec 20237:00 amRNSHolding(s) in Company
20th Dec 20237:00 amRNSHolding(s) in Company
14th Dec 20231:49 pmRNSExtension of Port Handling Agreement
12th Dec 202311:28 amRNSResults of the 2023 Extraordinary General Meeting
12th Dec 20237:00 amRNS2023 Extraordinary General Meeting Statement
1st Dec 20237:00 amRNSHistorical Related Party Transactions
20th Nov 20237:00 amRNSHolding(s) in Company
16th Nov 20237:00 amRNSQ3 and YTD 2023 Financial Results
14th Nov 20237:00 amRNSProposed Re-domiciliation and Notice of EGM
13th Nov 20237:00 amRNSIntention to Move from AIM to Main Market
2nd Nov 20237:00 amRNSNotice of Q3 and YTD 2023 Financial Results
12th Oct 20237:00 amRNSQ3 2023 Operations Update
10th Oct 20233:11 pmRNSDirector/PDMR Shareholding
12th Sep 20237:00 amRNSInterim Dividend Foreign Exchange Rates
10th Aug 20237:00 amRNSQ2 and H1 2023 Financial Results
27th Jul 20237:00 amRNSNotice of Q2 and H1 2023 Financial Results
20th Jul 20237:00 amRNSFinal Dividend Foreign Exchange Rates & Payment
20th Jul 20237:00 amRNSCorrection to Q2 Provisional Revenue Adjustments
12th Jul 20237:00 amRNSQ2 2023 Operations Update
10th Jul 20237:00 amRNSPDMR Shareholding
29th Jun 20237:00 amRNS2022 Final Dividend Timetable
28th Jun 202311:25 amRNSResults of the 2023 Annual General Meeting
28th Jun 20237:00 amRNS2023 Annual General Meeting Statement
26th Jun 20237:00 amRNSReport on Payments to Governments
26th Jun 20237:00 amRNSApproval to Cease to be Reporting in Canada
1st Jun 20237:00 amRNSNotice of AGM
30th May 20237:00 amRNSApplication to Cease to be a Reporting Issuer
23rd May 20237:00 amRNSGrant of Share Options and PDMR Notification
16th May 20237:00 amRNSPublication of 2022 Sustainability Report
15th May 20237:00 amRNSQ1 2023 Financial Results
2nd May 20237:00 amRNSNotice of Q1 2023 Results
17th Apr 20237:00 amRNSQ1 2023 Operations Update
28th Mar 20237:00 amRNSEnvironmental Authorisation Granted to PMV
24th Mar 20237:00 amRNSFiling of New Riotinto PEA Technical Report
23rd Mar 20234:35 pmRNSPrice Monitoring Extension
22nd Mar 20237:00 amRNS2022 Annual Results
15th Mar 20237:00 amRNSNotice of 2022 Annual Results
13th Mar 20237:00 amRNSUpdate on Voluntary Delisting From The TSX

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.