Approval of feasibility study using E-LIX System

28 Oct 2020 07:00

RNS Number : 4016D
Atalaya Mining PLC
28 October 2020
 

28 October 2020

Atalaya Mining Plc.

("Atalaya" or "the Company")

Atalaya approves feasibility study to evaluate production of cathodes at Proyecto Riotinto using newly developed E-LIX System

 

Atalaya Mining Plc (AIM:ATYM, TSX:AYM) is pleased to announce that it has commenced the execution of a feasibility study to evaluate the economic viability of producing cathodes from complex sulphide ores prevalent in the Iberian Pyrite Belt through the application of a new extraction process called the E-LIX System (more details below) with a new industrial scale plant (the "Feasibility Study"). The production of cathodes has the potential to generate cost savings by reducing charges associated with concentrate transportation, treatment and refining, and penalty elements, while also reducing carbon emissions.

About E-LIX System

 

Refer to Atalaya's website for the full announcement with images https://atalayamining.com/investors-announcements/

 

E-LIX System is a newly developed electrochemical extraction process developed and owned by Lain Technologies Ltd ("Lain Tech") which is led by Dr. Eva Lain, who holds a PhD in Electrochemistry research from the University of Cambridge.

 

Through the application of singular catalysts and physicochemical conditions, E-LIX System is able to achieve high metal recoveries under low residence times, by accomplishing rapid reaction rates while overcoming classic surface passivation issues that have typically impaired metal recovery from complex sulphide ores. E-LIX System is considered to be a more environmentally friendly process than existing technologies; it is a zero emissions process that does not consume water nor acid and runs under mild operating conditions (atmospheric pressure and room temperature). Hence, the process is additionally characterised by ease and safety of operation.

 

Development and proof of concept of E-LIX System

 

The E-LIX System was patented in 2014 by Lain Tech and has been developed in collaboration with Atalaya from an initial concept in the laboratory to a fully operational pilot plant located at Proyecto Riotinto (the "Pilot Plant").

 

The Pilot Plant with a capacity of 5 tonnes per day has been running for the past nine months, with only mandatory stoppage owing to COVID-19 restrictions. Leach rates of up to 250 kilograms per hour have been achieved processing copper concentrates, zinc concentrates and blends of different types of sulphides. The Pilot Plant also contains a solvent extraction and electrowinning ("SX-EW") section and has successfully produced high purity copper cathodes as a proof of concept. Excellent leach results with recovery rates well over 90% have been attained. Fast kinetics for copper and zinc have also been successfully achieved overcoming the well-known passivation problem of leaching primary sulphides.

 

 

The Pilot Plant has demonstrated that the E-LIX System treats effectively the impurity levels typically associated with the complex sulphides present in the world-class pyrite belt that runs through the South of Portugal and Spain and prevalent at Proyecto Riotinto.

 

Partnership between Lain Tech and Atalaya

 

During the past five years Atalaya has provided financial assistance to Lain Tech to develop the E-LIX System and has now reached an agreement with Lain Tech to use its patents, on an exclusive licence basis within the Iberian pyrite belt in Spain and Portugal ("Licence Agreement").

 

Under the terms of the Licence Agreement and based on the encouraging operating results at the Pilot Plant, the Company has commissioned a Feasibility Study to evaluate the construction of an industrial scale plant for the production of a minimum of 10,000 tonnes of copper cathode metal a year. The Feasibility Study at a cost of approximately €1 million will be funded by Atalaya and is expected to be finalised in 2021. The Licence Agreement provides for a profit sharing arrangement between Atalaya and Lain Tech.

 

The Feasibility Study will be based on the results obtained from the Pilot Plant and aims to confirm the scalability of the E-LIX System and the capital and operating costs of the industrial plant. Should the industrial plant be built, it will be funded and constructed by Atalaya with Lain Tech designing, operating and managing the E-LIX System.

 

Atalaya believes that the use of the E-LIX System could potentially be applicable to the large amount of complex sulphide ore inventory present throughout the Iberian pyrite belt, including Atalaya's mining properties such as Proyecto Riotinto and Proyecto Masa Valverde.

 

Alberto Lavandeira, CEO, commented:

"We are fortunate to have been given this unique opportunity to work with Dr. Eva Lain in the development of the E-LIX System. I believe this system has the potential to play an important role in the economic treatment of many complex orebodies worldwide. We look forward to updating the market on the results of the Feasibility Study."

 

Contacts:

Newgate Communications

Elisabeth Cowell / Adam Lloyd / Tom Carnegie

+ 44 20 3757 6880

4C Communications

Carina Corbett

+44 20 3170 7973

Canaccord Genuity

(NOMAD and Joint Broker)

Henry Fitzgerald-O'Connor / James Asensio

+44 20 7523 8000

BMO Capital Markets

(Joint Broker)

Tom Rider / Michael Rechsteiner / Neil Elliot

+44 20 7236 1010

Peel Hunt LLP

(Joint Broker)

Ross Allister / David McKeown

+44 20 7418 8900

 

About Atalaya Mining Plc

Atalaya is an AIM and TSX-listed mining and development group which produces copper concentrates and silver by-product at its wholly owned Proyecto Riotinto site in southwest Spain. In addition, the Group has a phased, earn-in agreement for up to 80% ownership of Proyecto Touro, a brownfield copper project in the northwest of Spain. For further information, visit www.atalayamining.com

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCDGBDGBXDDGGR
Date   Source Headline
26th May 20267:00 amRNSQ1 2026 Financial Results
21st May 20267:00 amRNSNotice of AGM
13th May 20267:00 amRNSNotice of Results
28th Apr 20267:01 amRNSGrant of Conditional Share Awards
28th Apr 20267:00 amRNSPublication of 2025 Annual Reporting Documents
16th Apr 20265:04 pmRNSTR-1
14th Apr 20267:00 amRNSQ1 2026 Operations Update
10th Apr 202611:46 amRNSHolding(s) in Company
2nd Apr 20267:00 amRNSInvestment in Lara Exploration Ltd.
19th Mar 20267:00 amRNS2025 Annual Results
5th Mar 20267:00 amRNSNotice of 2025 Annual Results
9th Feb 20267:00 amRNSTR1 Notification of Major Holdings
4th Feb 20267:00 amRNSResults of placing in Atalaya Mining Copper, S.A.
3rd Feb 20264:45 pmRNSProposed placing - in Atalaya Mining Copper, S.A.
28th Jan 20267:00 amRNSSuccessful Fundraise
27th Jan 20264:39 pmRNSRetail Offer by RetailBook
27th Jan 20264:38 pmRNSProposed Fundraise to Accelerate Copper Project
14th Jan 20267:00 amRNSQ4 Operations Update and 2026 Production Guidance
9th Jan 202612:21 pmRNSHolding(s) in Company
30th Dec 20257:00 amRNSDirectorate Change
30th Dec 20257:00 amRNSDirectorate Change
19th Dec 20257:00 amRNSStatement Regarding Shareholder Consultation
19th Dec 20257:00 amRNSStatement Regarding Shareholder Consultation
10th Dec 20257:00 amRNSHolding(s) in Company
13th Nov 20257:00 amRNSQ3 and YTD 2025 Financial Results
30th Oct 20257:00 amRNSNotice of Q3 and YTD 2025 Financial Results
21st Oct 20257:00 amRNSQ3 2025 Operations Update
3rd Oct 202510:33 amRNSHolding(s) in Company
1st Oct 20259:35 amRNSHolding(s) in Company
30th Sep 20257:01 amRNSDirector/PDMR Shareholding
30th Sep 20257:00 amRNSHolding(s) in Company
18th Sep 20257:00 amRNSPDMR Share Dealings
17th Sep 20257:00 amRNSNotice for Holders of Physical Share Certificates
10th Sep 20257:00 amRNSResult of Secondary Placing
9th Sep 20254:43 pmRNSProposed placing in Atalaya Mining Copper, S.A.
12th Aug 20257:00 amRNSQ2 and H1 2025 Financial Results
23rd Jul 20257:00 amRNSNotice of Q2 and H1 2025 Financial Results
15th Jul 20257:00 amRNSQ2 2025 Operations Update
10th Jul 20257:01 amRNSMasa Valverde Drilling Update
10th Jul 20257:00 amRNSDirector/PDMR Shareholding
24th Jun 202511:59 amRNSBoard Committee Updates
24th Jun 202511:29 amRNSAGM 2025 – Voting Results
20th Jun 20257:00 amRNSAppointment of Director
4th Jun 20253:48 pmRNSDirector Declaration
2nd Jun 20257:00 amRNSFinal Dividend Timetable & Updated AGM Resolution
29th May 20257:00 amRNSQ1 2025 Financial Results
21st May 20257:00 amRNSNotice of Q1 2025 Financial Results
15th May 20257:00 amRNSSan Dionisio Granted Environmental Authorisation
14th May 20257:00 amRNSNotice of Annual General Meeting
2nd May 20257:00 amRNSFTSE 250 Index Inclusion

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.