Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAtalaya Mining Regulatory News (ATYM)

Share Price Information for Atalaya Mining (ATYM)

Share Price is delayed by 15 minutes
Get Live Data
889.00    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 1.50 (0.169%)
Market Cap: £1.37b
ATYM Live PriceLast checked at - London Stock Exchange

Intraday Atalaya Mining Share Chart

Approval of feasibility study using E-LIX System

28 Oct 2020 07:00

RNS Number : 4016D
Atalaya Mining PLC
28 October 2020
Ā 

28 October 2020

Atalaya Mining Plc.

("Atalaya" or "the Company")

Atalaya approves feasibility study to evaluate production of cathodes at Proyecto Riotinto using newly developed E-LIX System

Ā 

Atalaya Mining Plc (AIM:ATYM, TSX:AYM) is pleased to announce that it has commenced the execution of a feasibility study to evaluate the economic viability of producing cathodes from complex sulphide ores prevalent in the Iberian Pyrite Belt through the application of a new extraction process called the E-LIX System (more details below) with a new industrial scale plant (the "Feasibility Study"). The production of cathodes has the potential to generate cost savings by reducing charges associated with concentrate transportation, treatment and refining, and penalty elements, while also reducing carbon emissions.

About E-LIX System

Ā 

Refer to Atalaya's website for the full announcement with images https://atalayamining.com/investors-announcements/

Ā 

E-LIX System is a newly developed electrochemical extraction process developed and owned by Lain Technologies Ltd ("Lain Tech") which is led by Dr. Eva Lain, who holds a PhD in Electrochemistry research from the University of Cambridge.

Ā 

Through the application of singular catalysts and physicochemical conditions, E-LIX System is able to achieve high metal recoveries under low residence times, by accomplishing rapid reaction rates while overcoming classic surface passivation issues that have typically impaired metal recovery from complex sulphide ores. E-LIX System is considered to be a more environmentally friendly process than existing technologies; it is a zero emissions process that does not consume water nor acid and runs under mild operating conditions (atmospheric pressure and room temperature). Hence, the process is additionally characterised by ease and safety of operation.

Ā 

Development and proof of concept of E-LIX System

Ā 

The E-LIX System was patented in 2014 by Lain Tech and has been developed in collaboration with Atalaya from an initial concept in the laboratory to a fully operational pilot plant located at Proyecto Riotinto (the "Pilot Plant").

Ā 

The Pilot Plant with a capacity of 5 tonnes per day has been running for the past nine months, with only mandatory stoppage owing to COVID-19 restrictions. Leach rates of up to 250 kilograms per hour have been achieved processing copper concentrates, zinc concentrates and blends of different types of sulphides. The Pilot Plant also contains a solvent extraction and electrowinning ("SX-EW") section and has successfully produced high purity copper cathodes as a proof of concept. Excellent leach results with recovery rates well over 90% have been attained. Fast kinetics for copper and zinc have also been successfully achieved overcoming the well-known passivation problem of leaching primary sulphides.

Ā 

Ā 

The Pilot Plant has demonstrated that the E-LIX System treats effectively the impurity levels typically associated with the complex sulphides present in the world-class pyrite belt that runs through the South of Portugal and Spain and prevalent at Proyecto Riotinto.

Ā 

Partnership between Lain Tech and Atalaya

Ā 

During the past five years Atalaya has provided financial assistance to Lain Tech to develop the E-LIX System and has now reached an agreement with Lain Tech to use its patents, on an exclusive licence basis within the Iberian pyrite belt in Spain and Portugal ("Licence Agreement").

Ā 

Under the terms of the Licence Agreement and based on the encouraging operating results at the Pilot Plant, the Company has commissioned a Feasibility Study to evaluate the construction of an industrial scale plant for the production of a minimum of 10,000 tonnes of copper cathode metal a year. The Feasibility Study at a cost of approximately €1 million will be funded by Atalaya and is expected to be finalised in 2021. The Licence Agreement provides for a profit sharing arrangement between Atalaya and Lain Tech.

Ā 

The Feasibility Study will be based on the results obtained from the Pilot Plant and aims to confirm the scalability of the E-LIX System and the capital and operating costs of the industrial plant. Should the industrial plant be built, it will be funded and constructed by Atalaya with Lain Tech designing, operating and managing the E-LIX System.

Ā 

Atalaya believes that the use of the E-LIX System could potentially be applicable to the large amount of complex sulphide ore inventory present throughout the Iberian pyrite belt, including Atalaya's mining properties such as Proyecto Riotinto and Proyecto Masa Valverde.

Ā 

Alberto Lavandeira, CEO, commented:

"We are fortunate to have been given this unique opportunity to work with Dr. Eva Lain in the development of the E-LIX System. I believe this system has the potential to play an important role in the economic treatment of many complex orebodies worldwide. We look forward to updating the market on the results of the Feasibility Study."

Ā 

Contacts:

Newgate Communications

Elisabeth Cowell / Adam Lloyd / Tom Carnegie

+ 44 20 3757 6880

4C Communications

Carina Corbett

+44 20 3170 7973

Canaccord Genuity

(NOMAD and Joint Broker)

Henry Fitzgerald-O'Connor / James Asensio

+44 20 7523 8000

BMO Capital Markets

(Joint Broker)

Tom Rider / Michael Rechsteiner / Neil Elliot

+44 20 7236 1010

Peel Hunt LLP

(Joint Broker)

Ross Allister / David McKeown

+44 20 7418 8900

Ā 

About Atalaya Mining Plc

Atalaya is an AIM and TSX-listed mining and development group which produces copper concentrates and silver by-product at its wholly owned Proyecto Riotinto site in southwest Spain. In addition, the Group has a phased, earn-in agreement for up to 80% ownership of Proyecto Touro, a brownfield copper project in the northwest of Spain. For further information, visit www.atalayamining.com

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Ā 
END
Ā 
Ā 
MSCDGBDGBXDDGGR
Date   Source Headline
11th Nov 20227:00 amRNSHolding(s) in Company
9th Nov 20222:40 pmRNSPDMR Share Dealing
9th Nov 20227:00 amRNSQ3 and YTD 2022 Financial Results
1st Nov 20227:00 amRNSEstablishment of Sustainability Committee
25th Oct 20227:00 amRNSNotice of Q3 2022 Results
17th Oct 20227:00 amRNSQ3 2022 Operations Upate
17th Oct 20227:00 amRNSQ3 2022 Operations Update
14th Oct 202212:43 pmRNSHolding(s) in Company
5th Oct 20227:00 amRNSFiling of Proyecto Riotinto Technical Report
29th Sep 20227:00 amRNSHolding(s) in Company
13th Sep 20227:00 amRNSChange in Dividend Payment Date
6th Sep 20227:00 amRNSInterim Dividend Foreign Exchange Rates andPayment
25th Aug 202210:45 amRNSDirector/PDMR Shareholding
23rd Aug 202211:54 amRNSHolding(s) in Company
10th Aug 20227:00 amRNSQ2 and H1 2022 Financial Results
18th Jul 20227:00 amRNSNotice of Q2 2022 and Interim Results
14th Jul 202211:06 amRNSSecond Price Monitoring Extn
14th Jul 202211:00 amRNSPrice Monitoring Extension
14th Jul 20227:00 amRNSQ2 2022 Operations Update
5th Jul 20227:00 amRNSPositive Drilling Results from Campanario Trend
24th Jun 20227:00 amRNSGrant of Share Options and PDMR Shareholding
23rd Jun 202212:15 pmRNS2022.06.23 - ATYM RNS - Options Executed
22nd Jun 202212:55 pmRNSResults of the 2022 Annual General Meeting
22nd Jun 20227:00 amRNS2022 Annual General Meeting Statement
26th May 20227:00 amRNSNotice of Annual General Meeting
20th May 20227:20 amRNSPDMR Share Purchase and Shareholding
19th May 20227:00 amRNSQ1 2022 Financial Results
18th May 20224:11 pmRNSAppointment of Director
18th May 20227:00 amRNSFiling of Proyecto Masa Valverde Technical Report
11th May 20227:00 amRNSNotice of Unaudited Q1 2022 Results
3rd May 20225:15 pmRNSHolding(s) in Company
27th Apr 20227:00 amRNSPublication of Site Visit Presentation
25th Apr 20227:00 amRNSPublication of Inaugural Sustainability Report
13th Apr 20227:00 amRNSNew Resource Estimates: San Dionisio & San Antonio
13th Apr 20227:00 amRNSFirst Quarter 2022 Operations Update
7th Apr 20227:00 amRNSShareholder Update
6th Apr 20228:07 amRNSHolding(s) in Company
5th Apr 20222:00 pmRNSHolding(s) in Company
5th Apr 20227:00 amRNSIncrease in Mineral Resources at Masa Valverde
1st Apr 20229:05 amRNSSecond Price Monitoring Extn
1st Apr 20229:00 amRNSPrice Monitoring Extension
31st Mar 20224:48 pmRNSProposed placing in Atalaya Mining Plc
24th Mar 20222:16 pmRNSDirectorate Change
24th Mar 20227:00 amRNSAudited Full Year Results 2021
21st Mar 202211:50 amRNSConclusion of Astor Management AG litigation
22nd Feb 20227:00 amRNSDirector/PDMR Shareholding
3rd Feb 20227:00 amRNSBest copper intercept to date at Masa Valverde
27th Jan 20227:00 amRNSGranting of share options and PDMR Notification
26th Jan 20227:00 amRNSIssue of Equity
25th Jan 20227:00 amRNSSummary re. Approach to Sustainability

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.