Ben Richardson, CEO at SulNOx, confident they can cost-effectively decarbonise commercial shipping. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAndrada Mining. Regulatory News (ATM)

Share Price Information for Andrada Mining. (ATM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.00
Bid: 4.90
Ask: 5.10
Change: 0.00 (0.00%)
Spread: 0.20 (4.082%)
Open: 5.05
High: 0.00
Low: 0.00
Prev. Close: 5.00
ATM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Lithium and Tantalum Product Development Update

7 Dec 2022 07:00

RNS Number : 8296I
AfriTin Mining Ltd
07 December 2022
 

7 December 2022

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR) as in force in the United Kingdom pursuant to the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

AfriTin Mining Limited

("AfriTin" or the "Company")

Lithium and Tantalum Product Development Update

AfriTin Mining Limited (AIM: ATM), an African technology metals mining company with a portfolio of mining and exploration assets in Namibia, provides an update on its lithium and tantalum product development programme.

The object of the programme is to demonstrate the potential commercial viability of a lithium petalite concentrate co-product from the Uis Mine ("Uis"), and provide samples for potential offtake partners, whilst simultaneously de-risking the development of commercial-scale processing plant for lithium. In addition, the programme also includes the implementation of a full-scale tantalum separation circuit to produce a tantalum concentrate by-product from the tantalum contained in the existing tin concentrate product.

 

Milestones Achieved

 

· Lithium laboratory test work has produced a high-grade, ultra-low iron lithium petalite concentrate at 4.34% Li2O and low contaminants levels of 0.03% Fe2O3 and 0.93% alkalis (Na2O + K2O);

· Test work to convert lithium petalite concentrate to battery-grade lithium hydroxide has been initiated with Nagrom, one of Australia's leading mineral processing companies;

· Commercial engagements with lithium petalite concentrate offtakers have been initiated;

· Infill exploration drilling programme for lithium and tantalum over V1/V2 orebody complete;

· Tantalum laboratory test work produced a saleable 24% tantalum oxide (Ta2O5) concentrate; and

· Nicholas Rathjen appointed as Head of Business and Commercial Development to advance the commercial aspects of AfriTin's lithium and tantalum potential.

 

Anticipated News Flow

 

· Larger, pilot scale lithium metallurgical testing, which will also produce samples for potential offtakers, has commenced, with first results expected in Q1 2023

· First results from laboratory metallurgical test work with Nagrom to produce battery-grade lithium hydroxide expected in Q3 2023;

· A lithium pilot plant, intended for processing bulk ore samples at Uis, is progressing to construction phase, with long lead items ordered. Construction is scheduled to complete in Q2 2023;

· Updated lithium and tantalum Mineral Resource Estimate for lithium and tantalum expected in Q1 2023 following final infill drilling results; and

· A full-scale, integrated tantalum separation circuit is progressing to construction phase, with long lead items ordered and construction scheduled to complete in Q2 2023. First production of tantalum concentrate is expected by Q3 2023.

Anthony Viljoen (CEO) commented:

"We are excited to see our lithium product development programme progress on three fronts, namely updating the Mineral Resource Estimate, commencement of lithium pilot scale metallurgical testing, and taking the first steps to explore commercial engagements for lithium petalite concentrate offtake.

"The excellent laboratory test result of a high-grade, ultra-low iron petalite gives us the confidence to advance to the pilot phase of our lithium product development programme. We look forward to establishing production of lithium petalite concentrate and initiating testing with potential offtakers in the glassware and ceramics market, for whom petalite is a key raw material, as well as with producers of lithium hydroxide and lithium carbonate for the battery market.

"In addition to lithium, the Company is moving ahead with the construction of a tantalum separation circuit, which will be integrated with the existing tin concentrator plant. The new circuit will magnetically separate tantalum minerals from the existing tin concentrate stream into a second saleable concentrate.

"The Company is fully focussed on unlocking early value for its stakeholders through fast-tracking the development programme towards production. We believe that the addition of lithium and tantalum by-products will confirm the Company as a globally significant, high-margin producer of technology metals.

"Lastly, we welcome Nicholas Rathjen into the role of Head of Business and Commercial Development at AfriTin. Nicholas will focus on advancing the commercial aspects of our lithium strategy as we progress towards becoming a fully-fledged lithium producer."

Lithium Metallurgical Testing

The results of the first phase test work of laboratory metallurgical test work for the beneficiation of lithium bearing mineral petalite was announced on 24 May 2022. Geolabs Global, an independent test facility in South Africa, produced a high-grade, ultra-low iron petalite concentrate at 4.34% Li2O, with low contaminants levels of 0.03% Fe2O3 and 0.93% alkalis (Na2O + K2O), using a process that pre-concentrates petalite through dense medium separation ("DMS"), followed by upgrading to a higher-grade petalite concentrate using milling and flotation. These qualities are typical of petalite concentrates used as lithium feedstock in the premium glass and ceramics industry which requires a high lithia to iron ratio. The Company also expects the concentrate to be suitable for conversion to battery-grade lithium carbonate or hydroxide. Laboratory flotation test work continues at ANZAPLAN (Germany) with aim the of optimising flotation performance and testing alternative reagent regimes.

 

In addition, laboratory test work for the production of lithium hydroxide from the Uis petalite concentrate has been initiated at Nagrom one of Australia's leading mineral processing companies, with results expected in Q3 2023. Lithium hydroxide serves as a key raw material for the manufacturing of lithium-ion batteries.

 

Larger, pilot scale metallurgical testing has commenced, which involves the processing of bulk samples ranging from 1 to 100 tonnes of mineralised material. By scaling up the test work the Company intends to achieve the following improvements:

· Increase the confidence of the lithium beneficiation parameters and process flow design;

· Improve variability modelling for the mineralised material and its beneficiation characteristics;

· Generate enough concentrate to initiate downstream test work with potential offtakers.

 

The pilot scale testing programme includes the following work streams in progress:

· DMS test work on a large bulk ore sample at Bond Equipment (South Africa);

· Pilot scale milling and flotation test work at Nagrom (Australia);

· Hyperspectral ore sorting test work with Steinert (Germany) and Tomra (Germany) to investigate alternative or supplementary methods of petalite pre-concentration. The hyperspectral ore sorting test work runs in parallel to x-ray transmission ore sorting test work for tin.

The results of the second phase of metallurgical test work are expected during Q1 2023 and will inform the process flow design ("PFD") of the full-scale, integrated lithium beneficiation circuit at the current Uis Mine processing plant. A preliminary process flow design for an integrated lithium, tin and tantalum processing facility is presented in Figure 2.

Early-stage metallurgical test work has also been initiated on mineralised material from ML133 to establish the lithium beneficiation potential of these pegmatites.

Lithium Pilot Plant

As part of the pilot phase of metallurgical testing the Company has set out to construct a lithium pilot plant adjacent to the current tin processing plant of the Uis Mine on the licence ML134. Basic engineering design for a lithium pilot plant has been completed and long lead items have been ordered. The project has now entered the construction phase with commissioning projected for Q2 2023.

The pilot plant comprises a crushing and screening section, followed by a DMS and gravity separation circuit, and will be built at a total capital cost of US$5 million. A milling and flotation section for petalite may be added as the next stage of the pilot plant, although pilot test campaigns for flotation will first be conducted at off-site testing facilities. The commercial viability of lithium petalite extraction via DMS technology is sufficiently well established to warrant its inclusion in this stage of the pilot plant, with the intention of fast-tracking its production and marketing.

The lithium pilot plant is intended to process bulk sample discard material from the current tin processing plant and run-of-mine ore from the current mining pit, as well as mineralised material from ML133 and ML129. The plant will have a processing capacity of approximately 20 tph. Pilot campaigns will test various processing configurations, with the aim of refining the process flow design. It is also intended that the pilot plant will produce lithium concentrate, both for further offtake testing and development.

Tantalum By-Product Development

The results of the laboratory metallurgical test work for tantalum were announced on 18 November 2021. Tantalum bearing columbite-group minerals was separated from the tin bearing cassiterite using dry electromagnetic separation, producing a concentrate containing 24% Ta2O5. As a result of this successful test, a tantalum separation will be constructed as an integrated circuit to the existing tin concentrating plant. Basic engineering has been completed and long lead items have been ordered. Commissioning of the circuit is scheduled for Q2 2023, with first tantalum product is expected in Q3 2023.

The tantalum separation circuit comprises a dryer, vibrating screen, and over-belt electromagnetic separators. The total estimated capital cost of the circuit is US$1 million. The circuit will be fed with concentrate exiting the wet concentration circuits. The moist concentrate will be dried, classified, and each size fraction treated by a separate magnetic separator, after which the non-magnetic fractions will be combined into a tin concentrate, whereas the magnetic fractions (excluding the low-intensity iron-rich fraction) will be combined into a saleable tantalum concentrate.

Lithium & Tantalum Mineral Resources

The Company owns three mining licences with lithium occurrences: ML134, ML129 and ML133 (Figure 1). The lithium occurs in pegmatites that are also enriched in tin and tantalum. ML134 holds the Company's flagship asset, the Uis Mine which includes an inferred JORC (2012) compliant lithium resource of 450,000 tonnes of Li2O at the V1/V2 pegmatite. An infill drilling programme of 7,600 m over this pegmatite has been concluded with the aim of increasing the Mineral Resource Estimate ("MRE") classification for the lithium resource to the indicated and measured categories. The final assay results are expected in December 2022. An updated MRE for lithium and tantalum is expected during Q1 2023.

ML134 contains an additional 14 historically mined pegmatites along a 7 km strike, where exploration work to date has demonstrated that the mineralogy of all these pegmatites is similar to the V1/V2 pegmatite. This substantiates historical mining practices which sourced material from all these pegmatites and processed the material through a single plant. These pegmatites occur within 4 km of the current Uis processing plant. Exploration drilling is planned to continue over these pegmatite bodies with the goal of expanding the lithium, tin and tantalum mineral resource estimates on this licence.

Lithium mineralisation has also been reported on the proximal ML129 and ML133 licences (announced on 2 March 2023 and 24 November 2022 respectively) and geological sampling confirms the presence of lithium mineralisation over more than 70 pegmatites. The main lithium bearing mineral on ML134 and ML133 has been identified as petalite. On ML129, however, surface sampling has identified the presence of spodumene, whose distribution will be further investigated during future exploration drilling programmes.

Appointment of Head of Business and Commercial Development

The Company is pleased to announce the appointment of Nicholas Rathjen as Head of Business and Commercial Development. He will focus on advancing the commercial aspects of our lithium and tantalum strategy. Nicholas brings a strong commercial capability having led early-stage lithium projects through development, definitive feasibility studies, execution of offtake agreements with global counter parties through to execution of commercial transactions. His most recent role was head of corporate development at Prospect Resources (ASX:PSC), where he led the strategic process to advance the Arcadia Project, featuring petalite and spodumene, which culminated in the sale of this significant asset to leading new energy company, Huayou Cobalt, for US$422 million.

 

Figures

 

 

Figure 1: AfriTin's Uis Mine and mineral licence locality map showing the position of ML134, ML129 and ML133.

 

 

 

 

 

 

 

Figure 2: Simplified process flow design for an integrated lithium, tin and tantalum processing plant (subject to further process flow optimisation). The parts of the process flow design enclosed by the red dashed lines indicate possible future additions to the processing plant.

 

Glossary of abbreviations

DMS

Dense medium separation

ILiA

International Tin Association

km

Kilometre

Li

Symbol for lithium

Li → Li2O

Metal to metal-oxide conversion factor of 2.153

Li2O

Lithium oxide

m

Metre

MRE

Mineral Resource Estimate

PPM

Parts per million

Sn

Symbol for tin

Ta

Symbol for tantalum

tpa

Tonnes per annum

tph

Tonnes per hour

Glossary of Technical Terms

Dense Medium Separation

An ore beneficiation method in which minerals of relatively high or low specific gravity are separated from gangue using a hydro cyclone and a dense medium.

Pegmatite

An igneous rock typically of granitic composition, which is distinguished from other igneous rocks by the extremely coarse and systematically variable size of its crystals, or by an abundance of crystals with skeletal, graphic, or other strongly directional growth habits, or by a prominent spatial zonation of mineral assemblages, including monomineralic zones

Petalite

A lithium aluminium phyllosilicate mineral LiAlSi4O10, occurring in lithium-bearing pegmatites, often with other lithium minerals such as spodumene and lepidolite.

 

 

 

AfriTin Mining Limited

+27 (11) 268 6555

Anthony Viljoen, CEO

 

Nominated Adviser 

+44 (0) 207 220 1666

WH Ireland Limited

Katy Mitchell

 

Corporate Advisor and Joint Broker

H&P Advisory Limited

Andrew Chubb

Jay Ashfield

Nilesh Patel

 

+44 (0) 20 7907 8500

Stifel Nicolaus Europe Limited

Ashton Clanfield

Callum Stewart

Varun Talwar

+44 (0) 20 7710 7600

Tavistock Financial PR (United Kingdom)

+44 (0) 207 920 3150

Emily Moss

Catherine Drummond

Adam Baynes

 

 

About AfriTin Mining Limited

Notes to Editors

AfriTin Mining Limited is a London-listed technology metals mining company with a vision to create a portfolio of globally significant, conflict-free, producing and exploration assets. The Company's flagship asset is the Uis Tin Mine in Namibia, formerly the world's largest hard-rock open cast tin mine.

AfriTin is managed by an experienced board of directors and management team with a current strategy to ramp-up production at the Uis Mine in Namibia to more than 10,000 tonnes of tin concentrate and 350,000 tonnes of lithium concentrate in a Phase 2 expansion, having reached Phase 1 commercial production in 2020. The Company strives to capitalise on the solid supply/demand fundamentals of tin and lithium by developing a critical mass of resource inventory, achieving production in the near term and further scaling production by consolidating assets in Africa.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDXQLLBLLLFFBL
Date   Source Headline
27th Mar 20249:38 amRNSOperational update - replacement
27th Mar 20247:00 amRNSOperational update for the period ended 29/02/24
19th Mar 20247:36 amRNSFunding Agreement
12th Mar 20247:00 amRNSProduction and Strategic Process Update
22nd Dec 20237:00 amRNSQ3 Ops Update for the period ended 30 Nov 2023
5th Dec 20237:00 amRNSSpodumene Concentrate Produced from Lithium Ridge
29th Nov 20237:00 amRNSUNAUDITED INTERIM RESULTS 6 MONTHS ENDED 31/08/23
28th Nov 20236:40 pmRNSHolding(s) in Company - Replacement
28th Nov 20235:03 pmRNSHolding(s) in Company
27th Nov 20237:00 amRNSLithium Development Update
16th Nov 20237:00 amRNSUSD 25 million received from OMF
15th Nov 20237:00 amRNSRenewal of off-take agreements
27th Oct 202312:08 pmRNSRelease of the 2023 Sustainability Report
12th Oct 20237:00 amRNSUpdate on Brandberg West
3rd Oct 20232:08 pmRNSExercise of Share Options
29th Sep 20237:00 amRNSExercise of Share Options
18th Sep 20237:00 amRNSFinal Results for Initial ML133 Drill Programme
14th Sep 20237:00 amRNSQ2 Ops Update for the period ended 31 August 2023
6th Sep 20237:00 amRNSInitial Drill Results on ML133 (“Lithium Ridge”)
5th Sep 20237:00 amRNSDevelopment Bank of Namibia financing concluded
29th Aug 20237:00 amRNSExploration Update on ML133 (Lithium Ridge)
24th Aug 20238:30 amRNSAudited Financial Results
15th Aug 20234:46 pmRNSOrion US$25m Funding Package Update - Replacement
15th Aug 20237:00 amRNSOrion US$25 Million Funding Package Update
18th Jul 20237:00 amRNSFunding update and commissioning of pilot plant
6th Jul 20237:00 amRNSDrill programme results for Spodumene Hill Project
26th Jun 20237:00 amRNSOperational update for period ended 31 May 2023
5th Jun 20237:00 amRNSShares to Trade on OTCQB & Update on Financing
22nd May 20237:00 amRNSFirst Bulk Lithium Production and Funding Update
18th May 20237:00 amRNSNotice of Investor Presentations
11th May 20237:05 amRNSIssue of Share Options
11th May 20237:00 amRNSAppointment of Barclays as Strategic Advisor
10th May 20237:00 amRNSAppointment of Directors
30th Mar 20235:26 pmRNSV1V2 final 2022 exploration drilling results
20th Mar 20237:00 amRNSQuarterly FY 2023 production and Company update
20th Feb 20237:00 amRNSDirector/PDMR Shareholding
6th Feb 20237:00 amRNSSignificant Lithium Resource Upgrade
2nd Feb 20237:00 amRNSLithium And Tantalum Infill Drilling Update
1st Feb 20238:33 amRNSHolding(s) in Company
31st Jan 20237:00 amRNSLithium and tantalum infill drill programme update
27th Jan 20237:00 amRNSConfirmation of Change in Website Address
26th Jan 20237:00 amRNSPublication of the Inaugural Sustainability Report
25th Jan 20233:54 pmRNSExercise of warrants and issue of equity
23rd Jan 20237:00 amRNSUis Mine Mineral Resource Expansion
10th Jan 20234:51 pmRNSConfirmation of Name Change
5th Jan 20235:06 pmRNSResult of EGM and Change of Name
22nd Dec 20227:00 amRNSQuarterly Production Update
7th Dec 20227:00 amRNSLithium and Tantalum Product Development Update
6th Dec 20227:00 amRNSNotice of EGM and Proposed Change of Name
5th Dec 20227:00 amRNSLithium and Tantalum Infill Drill Programme Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.