Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAvesoro Resources Regulatory News (ASO)

  • There is currently no data for ASO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Result of Infill Drilling at New Liberty

3 Apr 2012 07:00

RNS Number : 6717A
Aureus Mining Inc.
03 April 2012
 



3 April 2012

Aureus Mining Inc.

TSX : AUE

AIM : AUE

NEWS RELEASE

 

Further drill results from New Liberty gold project

31 metres grading 9.6 g/t intersected in area between Kinjor and Marvoe

Deeper drilling into the Latiff zone returns 12 metres at 6.4 g/t

 

Aureus Mining Inc. ("Aureus" or the "Company") announces the results of a further 40 diamond drill holes at the New Liberty gold project within the Company's 100% owned Bea Mountain Mining License in Liberia. The forty hole (9,143m) drilling programme was designed to test previously undrilled areas and potential depth extensions to the New Liberty deposit, as well as completion of further definition drilling within the current resource area.

 

Highlights of the drilling results are:

·; Drilling within the gap between the Kinjor and Marvoe areas, at depths of 50 to 200 metres below surface in a previously untested area of the ore body, returned high-grade and/or wide intercepts of:

o 9.6 g/t over 31 metres

o 8.6 g/t over 6 metres

o 6.1 g/t over 13 metres

o 3.5 g/t over 10 metres

o 1.5 g/t over 34 metres - including 2.9 g/t over 9 metres

o 1.5 g/t over 30 metres

o 1.4 g/t over 44 metres - including 2.2 g/t over 19 metres

 

·; Deeper drilling in the Latiffzone at depths of approximately 200 metres below surface returned high-grade intercepts of:

o 6.4 g/t over 12 metres

o 4.0 g/t over 14 metres

o 3.8 g/t over 7 metres

o 3.7 g/t over 5 metres

 

·; This drilling programme also returned encouraging intercepts of 3.8 g/t over 9 metres, 1.6 g/t over 14 metres and 1.5 g/t over 20 metres from the Marvoe area. These intercepts locate below the previously optimized open pit reserve for New Liberty

 

·; All of the results of the 40 drill hole programme will be incorporated into a new, NI 43-101 compliant, resource estimate which will be published as part of the definitive feasibility study during this quarter. The updated resource will also be incorporated into a reserve update for the New Liberty open pit to be published at the same time

 

Commenting on the results, David Reading, Chief Executive Officer of Aureus, said:

 

"The latestinfill drilling programme has demonstrated that there is no gap in the mineralised system between the Kinjor and Marvoeareas. In addition to this potential increase to the resource, the deeper drilling in the Latiff zone shows the considerable potential for an underground mining project after the open pit reserve has been mined out.The definitive feasibility study will be published as soon as these results have been incorporated into new resource and reserve estimates."

 

 

New Liberty Project - new drilling results highlight opportunities for additional resources

Resources and Reserves for New Liberty were announced on 2 February 2012. The Mineral Resource estimate was undertaken by Australian Mining Consultants ("AMC") in accordance with the requirements of the National Instrument 43-101 ("NI 43-101").The total Resource estimate of 1.57 million ounces of gold grading 3.58 g/t is comprised of 672,000 tonnes grading 4.74 g/t (for 102,000 ounces) in the Measured category, 8,666,000 tonnes grading 3.53 g/t (for 984,000 ounces) in the Indicated category, and 4,310,000 tonnes grading 3.5 g/t (for 483,000 ounces) in the Inferred category. The resource estimate incorporates all the results from 374 holes for 57,830 meters and was calculated on the basis of a 1.0 g/t cut-off grade. Based on completion of a NI 43-101 compliant technical study, which includes the Resource statement, an open pit mine plan, operating and capital cost estimations, and an economic analysis; a maiden Reserve of 873,000 ounces of gold at a diluted grade of 3.1 g/t was outlined.

 

The 40 holes announced in this release cover 9,143 metres of drilling that was completed subsequent to the February Resource and Reserve statements. The principal objectives of this new drilling programme were threefold and include:

·; Drilling of a previously untested zone, locating at 50 to 200 metres below surface, in between Kinjor and Marvoe and referred to as the "gap area"

·; Deeper drilling in the Latiff zone to confirm the continuity of gold mineralisation

·; Additional definition drilling within the previously defined resources which included holes sited just below the fully optimized open pit as defined by the Reserves

 

The results of this programme are considered by the Company to be positive and confirm the continuity of the ore body within the gap area (KGD427-431 and KGD402) as well as continuation of good grades at depth within the Latiff zone (KGD408, 413, 419 and KGD426). Drilling at the base of the previous infill drilling in the Marvoe area also returned encouraging intercepts (KGD436 and 437). These results have improved the company's understanding of the deposit and the continuity of gold mineralisation with depth. This information is currently being incorporated into a new Resource estimate which will be announced along with an updated Reserve estimate and the full results of the definitive feasibility study during the current quarter.

 

The results of all 40 holes are outlined below.

 

 

Table 1: New Liberty Diamond drill results

 

Hole ID

From (m)

To (m)

Length(m)

Mean Au g/t

Zone

KGD437

153

173

20

1.5

Marvoe

KGD436

106

111

5

1.4

Marvoe

and

160

169

9

3.8

and

176

190

14

1.6

KGD435

34

46

12

3.9

Marvoe

and

78

84

6

1.0

KGD434

65

86

21

1.7

Kinjor

including

66

74

8

2.6

KGD433

0

11

11

3.3

Kinjor

and

39

67

28

3.3

KGD432

25

31

6

2.2

Larjor/Latiff

KGD431

281

287

6

8.6

Kinjor/Marvoe

and

290

323

44

1.4

including

304

324

19

2.2

KGD430

147

160

13

6.1

Kinjor/Marvoe

and

175

185

10

1.0

KGD429

143

153

10

3.5

Kinjor/Marvoe

and

168

174

6

1.5

KGD428

185

215

30

1.5

Kinjor/Marvoe

including

206

214

8

2.5

KGD427

158

189

31

9.6

Kinjor/Marvoe

KGD426

344

356

12

6.4

KGD425

45

61

16

1.9

Marvoe

including

51

57

6

3.2

KGD424

188

219

11

0.6

Marvoe

and

219

223

4

1.0

and

229

233

4

2.2

KGD419

289

296

7

3.8

Latiff

KGD413

196

199

3

1.0

Latiff

and

 230

244

14 

4.0

and

370

372

1.0

KGD411

36 

39

 1.1

Larjor

and

46

52

6

1.3

KGD408

285

290

5

3.7

Latiff

and

 449

459

10 

1.8

KGD402

245

279

34

1.5

Kinjor/Marvoe

including

260

269

9

2.9

KGD400

26

31

5

0.5

Marvoe

KGD399

22

25

3

6.6

Marvoe

and

28

42

14

3.7

KGD385

34

45

11

0.5

Marvoe

KGD379

33

37

4

0.5

Marvoe

KGD377

288

295

7

5.9

Kinjor

KGD375

96

100

4

2.7

Marvoe

KGD373

69

74

5

0.5

Marvoe

KGD371

72

74

2

0.6

Marvoe

KGD370

7.5

12

4.5

0.5

Larjor

and

87

88

1

1.3

KGD369

22.5

31

8.5

1.2

Marvoe

KGD368

93

98

10

2.8

Marvoe

KGD367

1.5

3

1.5

4.7

Larjor

KGD366

65

81

16

3.3

Marvoe

and

85

93

8

5.7

Note: KGD423, 405, 404, 378, 376, 374 and 365 were unmineralised

 

 

 

 

The location of the drill intercepts in plan and longitudinal sections, highlighting the location of the deeper Latiff zone and gap area holes, as well as representative sections of the gap area, can be viewed in figures one to nine, by visiting the following links:

 

http://aureus-mining.com/wp-content/uploads/2012/04/BEA_NL_DRL_4_D_Labelled.pdf

http://aureus-mining.com/wp-content/uploads/2012/04/BEA_NL_SEC_18_A.pdf

http://aureus-mining.com/wp-content/uploads/2012/04/BEA_NL_SEC_19_A.pdf

http://aureus-mining.com/wp-content/uploads/2012/04/BEA_NL_SEC_29_A.pdf

http://aureus-mining.com/wp-content/uploads/2012/04/BEA_NL_SEC_30_A.pdf

http://aureus-mining.com/wp-content/uploads/2012/04/BEA_NL_SEC_31_A.pdf

http://aureus-mining.com/wp-content/uploads/2012/04/BEA_NL_SEC_36_A.pdf

http://aureus-mining.com/wp-content/uploads/2012/04/NewLiberty_Longitudinal_Section.pdf

http://aureus-mining.com/wp-content/uploads/2012/04/NewLiberty_UpsidetoResourceModel.pdf

 

 

Contact Information

 

Aureus Mining Inc.

David Reading / JeremyCave

Tel: +44(0) 20 7257 2930

 

Buchanan

Bobby Morse / James Strong

Tel: +44(0) 20 7466 5000

RBC Capital Markets (Nominated Advisor and Joint Broker)

Martin Eales / Richard Hughes

Tel: +44(0) 20 7653 4000

 

GMP Securities Europe LLP (Joint Broker)

Richard Greenfield / Alexandra Carse

Tel: +44(0) 20 7647 2800

 

Qualified Person

The estimates of mineral Resources were calculated in accordance with NI 43-101 and carried out by Chris G Arnold BSc (Hons), MSc, MAusIMM (CP) of independent consultants AMC. The Reserve Study was prepared by Mr M Staples of AMC, a Qualified Person, for the purposes of the study, under the standards set forth by National Instrument 43-101 "Standards of Disclosure for Mineral Project", of the Canadian Securities Administrators ("NI 43-101"), and he has also reviewed and approved the contents of this news release, as applicable

 

About Aureus Mining

The Company's assets include the New Liberty gold deposit in Liberia (the "New Liberty Gold Project"), which has an estimated Reserve of 873,000 ounces of gold grading 3.1 g/t and an estimated Measured and Indicated Mineral Resource of 1,086,000 ounces of gold grading 3.6 g/t and an estimated Inferred Mineral Resource of 483,000 ounces of gold grading 3.5 g/t. A technical update for the New Liberty gold project was released in February 2012, de-risking and building on the robust PEA, filed in December 2010. This update outlined an improved pre-tax NPV of US$260 million based on a US$ 1,350 / oz. gold price and a discount rate of 8 %, with an eight year mine life and annual production of 123,000 ounces for the first four years.

 

The New Liberty Gold Project is located within the Bea Mountain mining license which covers 457 km² and has a 25 year, renewable, mineral development agreement. The Bea Mountain mining license also hosts the proximal gold targets of Ndablama, Gondoja andWeaju, which are the focus of exploration programs during 2012.

The Company also has gold assets within exploration properties in Cameroon.

 

Forward-Looking Information

This press release contains certain forward-looking information. All information, other than information regarding historical fact, that addresses activities, events or developments that Aureus Mining believes, expects or anticipates will or may occur in the future is forward-looking information. Forward-looking information contained in this press release includes, but may not be limited to, the future plans and objectives of Aureus Mining and their anticipated future growth, mineral resource estimates and the anticipated exploration and development activities of Aureus Mining. The foregoing and any other forward-looking information contained in this press release reflects the current expectations, assumptions or beliefs of Aureus Mining based on information currently available to Aureus Mining. With respect to the forward-looking information contained in this press release, Aureus Mining has made assumptions regarding, among other things: general business, economic and mining industry conditions; and it has also been assumed that no material adverse change in the price of precious and/or base metals occurs, no unusual geological or technical problems occur and no significant events occur outside of the normal course of Aureus Mining's respective business.

 

Such forward-looking information is subject to a number of risks and uncertainties that may cause actual results or events to differ materially from current expectations, including: risks normally incidental to exploration and development of mineral properties; uncertainties in the interpretation of results from drilling and test work; the possibility that future exploration, development or mining results will not be consistent with expectations; uncertainty of mineral resources estimates; adverse changes in precious and/or base metal prices; and future unforeseen liabilities and other factors including, but not limited to, those listed under "Risk Factors" in the Preliminary Prospectus of Aureus Mining Inc. dated April 20, 2011, a copy of which is available on SEDAR at www.sedar.com, and in the Aureus Mining Admission Document, a copy of which is available at www.aureus-mining.com.

 

Any mineral resource figures referred to in this press release are estimates and no assurances can be given that the indicated levels of minerals will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While Aureus Mining believes that the mineral resource estimates in respect of their respective properties are well established, by their nature mineral resource estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. If such mineral resource estimates are inaccurate or are reduced in the future, this could have a material adverse impact on Aureus Mining, as applicable. Due to the uncertainty that may be attached to inferred mineral resources, it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of continued exploration.

 

Forward-looking information speaks only as of the date on which it is made and, except as may be required by applicable law, Aureus Mining disclaims any obligation to update or modify such forward-looking information, either as a result of new information, future events or for any other reason.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGUBGCUPPPUP
Date   Source Headline
26th Jul 20124:03 pmRNSSigning of Agreement
3rd Jul 20127:00 amRNSEIS SUBMITTED FOR NEW LIBERTY GOLD PROJECT
2nd Jul 20129:50 amRNSTotal Voting Rights
15th Jun 20122:26 pmRNSResults of AGM
12th Jun 20127:00 amRNSExploration Update
7th Jun 20124:04 pmRNSNotice of Major Interest in Shares
30th May 20127:00 amRNSResources Increase at New Liberty and DFS Update
18th May 20127:00 amRNSNotice of Annual and Special Meeting
18th May 20127:00 amRNSNotice of Annual and Special Meeting
17th May 201212:58 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
14th May 20127:01 amRNSInterim Consolidated Financial Statements
14th May 20127:01 amRNSPublication of Q1 2012 Interim Accounts
14th May 20127:00 amRNSManagement's Discussion and Analysis
10th May 201212:52 pmRNSNotifications of Major Interests in Shares
30th Apr 20123:45 pmRNSTotal Voting Rights
13th Apr 20129:40 amRNSGrant of Stock Options
4th Apr 20125:00 pmRNSCorrection to QP Statement
3rd Apr 20127:00 amRNSResult of Infill Drilling at New Liberty
30th Mar 20124:36 pmRNSTotal Voting Rights
29th Mar 20123:21 pmRNSBLOCK LISTING SIX MONTHLY RETURN
21st Mar 20123:26 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
16th Mar 20125:57 pmRNSExercise of Options
16th Mar 20127:00 amRNSNI 43-101 Technical Report on New Liberty
13th Mar 20124:05 pmRNSAdoption of Shareholder Rights Plan
12th Mar 20127:02 amRNSAnnual Results Part 1
12th Mar 20127:01 amRNSAnnual Results Part 2
12th Mar 20127:00 amRNSAnnual Results Part 3
29th Feb 20127:00 amRNSTotal Voting Rights
27th Feb 20127:00 amRNSLeopard Rock drilling and trench results
14th Feb 20127:00 amRNSChange of advisors
2nd Feb 20127:00 amRNSMaiden Reserve and Technical Update
6th Jan 20122:07 pmRNSGrant of Stock Options to Directors and Employees
30th Dec 20117:00 amRNSTotal Voting Rights
14th Dec 20112:46 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
28th Nov 20117:00 amRNSSite Visit
14th Nov 20117:01 amRNSQ3 2011 - Part 1
14th Nov 20117:01 amRNSQ3 2011 - Part 2
14th Nov 20117:00 amRNSQ3 2011 - Part 3
8th Nov 20117:00 amRNSFeasibility drilling results completed
25th Oct 20117:00 amRNSPotential Extensions to New Liberty Deposit
3rd Oct 20117:00 amRNSNew Liberty Feasibility drilling completed
23rd Sep 20114:08 pmRNSBlocklisting Application
21st Sep 20117:00 amRNSNew Exploration License area acquired
19th Sep 20114:42 pmRNSExercise of Options
1st Sep 201110:34 amRNSGrant of Options
23rd Aug 20117:00 amRNSDrilling Results at New Liberty
18th Aug 201111:35 amRNSGrant of Options
16th Aug 20114:30 pmRNSExercise of Options
15th Aug 20117:00 amRNSQ2 2011 - Part 1
15th Aug 20117:00 amRNSQ2 2011 - Part 2

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.