The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAvesoro Resources Regulatory News (ASO)

  • There is currently no data for ASO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration Update

12 Jun 2012 07:00

RNS Number : 1440F
Aureus Mining Inc.
12 June 2012
 



For Immediate Release June 12 2012

Aureus Mining Inc.

TSX : AUE

AIM : AUE

LEOPARD ROCK DRILLING INTERCEPTS 4 METRES GRADING 13.9 g/t

TRENCHING AT GONDOJA RETURNS 7 METRES AT 13.1 g/t

Aureus Mining Inc. (TSX: AUE / AIM: AUE) ("Aureus Mining" or the "Company") is pleased to announce further drilling results from the Leopard Rock gold target and new trenching results from the Gondoja gold target. Leopard Rock is situated on the Archaen Gold exploration license and Gondoja is located within the Bea Mountain Mining license. Both licences are contiguous, 100% owned by the Company and are located in Liberia.

 

Highlights

·; Final results for the 27-hole (4,293m) diamond drilling programme at Leopard Rock returned multiple gold intercepts. New results included:

- 13.9 g/t over 4m

- 10.4 g/t over 2m

- 4.8 g/t over 4m

- 2.8 g/t over 10m

- 1.4 g/t over 9m

- 1.0 g/t over 11.5m

·; The completed phase one drilling and trenching programme has outlined both high and lower grade mineralised zones along a north-west trending, gold bearing shear zone over a strike length of 1.1km. This gold system is still open in all directions and further drilling will be undertaken in H2, after the rainy season

·; A 13km by 2km geochemistry survey has outlined a continuous zone of gold in soil anomalies covering multiple target areas which include Leopard Rock, Ndablama and Gondoja. Drilling is in progress along the gold corridor and programmes have been completed at Leopard Rock (27 holes for 4,293m) and Ndablama (36 holes for 6,012m). Results for the phase two drilling programme at Ndablama (21 holes for 3,345m) are pending

·; At the Gondoja gold target a new trench, GT04, returned a gold intercept of 87m grading 1.4 g/t, including 7m at 13.1 g/t. This trench is located 50m south of historical borehole GD4 which returned an intercept of 36m at 3.3 g/t. A diamond drilling programme is currently in progress at this site involving 10 holes for 1,500m

·; An airborne geophysical survey for magnetics and radiometrics has been completed over the Company's total license portfolio in Liberia. The survey covers an area of 546km2 at an optimal flight height of 100m above the surface. Processed and interpreted images of the data highlight numerous new target areas for follow up exploration work

Commenting on the exploration update, David Reading, President and Chief Executive Officer of Aureus Mining, said:

"The drill results from Leopard Rock and Gondoja provide further positive indications of a significant mineralized system over a strike of 13km and attest to the highly prospective Archean terrains within our mining license. We are looking forward to further drilling results during Q2 and we plan to undertake generative studies over our license portfolio during the forthcoming rainy season in order to grow our exploration pipeline".

 

Leopard Rock - trenching and diamond drilling programmes outline multiple gold zones within a shear zone which is still open to the NW and SE

The Leopard Rock gold target is located approximately 40km ENE of the New Liberty deposit within the Archaen Gold exploration license. A phase one exploration programme has now been completed at this target and includes soil geochemistry, geological mapping, 27 trenches covering 2,965m and 27 drill holes totalling 4,293m. Results from the drilling and trenching have outlined multiple gold zones which are hosted within a NW to SE trending shear zone over a strike length of 1.1km. The diamond drilling cores demonstrate that the gold mineralisation is associated with disseminated pyrite, pyrhotite and arsenopyrite, located within sheared and altered ultramafic rocks at the contact with metabasalt rocks. The ultramafic and metabasalt rocks have been intruded by granitic dykes. Gold zones vary from thin (1-4 metres) higher grade (+5 g/t) bodies to wider intercepts (8-20 metres) grading 0.5 to 2.0 g/t. All of the gold zones dip at a shallow angle of 45 degrees to the SW. The results for the 27-hole programme are given in Table 1 below:

 

Table 1:

Borehole ID

From (m)

To (m)

Intersection

Length (m)

Au Grade g/t

LDD001

2

22

20

1.9

and

52

61

9

1.9

including

56

59

3

5.0

LDD002

52

54

2

0.6

LDD004

79

83

4

5.5

and

87

91

4

17.6

LDD005

2

10

8

1.0

and

42

44

2

10.4

LDD006

24

35

11

1.7

and

39

43

4

1.1

and

56

59

3

9.5

LDD007

26.6

33

6.4

1.0

and

45

46

1

1.4

LDD008

40.4

45

4.6

0.7

and

51

54

3

0.7

and

74

78

4

1.9

LDD009

77

84.2

7.2

0.5

and

107

113

6

9.4

including

107

111

4

13.9

LDD010

21.5

26.6

5.1

0.7

LDD011

67

80

13

0.5

and

116.5

126

9.5

1.3

LDD012

102

106

4

0.9

LDD013

48

74

26

0.6

including

48.6

52

3.4

1.5

including

55

63

8

0.8

LDD014

15

25.3

10.3

1.0

and

35

39

4

4.8

and

56

58

2

1.8

LDD016

83.7

98.2

14.5

0.8

including

93.2

95.2

2

4.4

and

115.2

117.2

2

1.2

LDD017

86.6

103

16.4

0.7

and

126

131

5

1.0

LDD019

40.8

50

9.2

1.4

LDD020

57

64

7

1.0

LDD022

71.2

78.6

7.4

0.6

and

81.6

85

3.4

0.5

and

92.5

108.7

16.2

0.9

LDD023

0

4

4

0.5

and

17.1

23.3

6.2

0.4

LDD024

0

11.5

11.5

1.0

LDD026

67

77

10

2.8

Assay grade data is un-cut.

NSV - LDD003, LDD015, LDD018, LDD021, LDD025 and LDD027

Values shown in italics previously reported in February 2012

 

The Leopard Rock gold target is still open to the NW and SE. Gold in soil anomalies extend for a further kilometre NW to the Ndablama target. An induced polarisation, ground geophysical survey is currently in progress in this area to define further targets for drilling. In the SE the gold in soil anomaly associated with the Leopard rock mineralisation can be traced for a further 500m and results for a further four trenches are still pending for this extension.

Further drilling programmes at Leopard rock will focus on the NW and SE extensions as well as infill drilling into the current gold zones, outlined by the previous drilling programme.

 

Exploration programmes highlight +13km gold corridor extending from Leopard rock to Gondoja. Phase two drilling programme completed at Ndablama covering 21 holes for 3,345 metres.

A 13km by 2km geochemistry survey has outlined a continuous zone of gold in soil anomalies with values up to 6 g/t in the soil. This work has highlighted multiple targets which include Leopard Rock, Ndablama and Gondoja and at least three other areas. The gold in soil anomalies have been drill tested and trenched at Ndablama and Leopard Rock, and now this work has commenced at Gondoja. In all cases, this work has returned gold mineralisation within the bedrock confirming the source of the soil anomalies. To date only 15% of the gold corridor has been drill tested.

Drilling is in progress along the gold corridor and programmes have been completed at Leopard Rock (27 holes for 4,293m) and Ndablama (36 holes for 6,012m). Results for the phase two drilling programme at Ndablama (21 holes for 3,345m) are pending.

Gondoja Gold target - new trench result highlights a mineralised zone grading 87m at 1.4 g/t and including 7m at 13.1 g/t.

The Gondoja gold target is located 10km NE of Leopard Rock and is one of the areas within the +13km gold corridor. The area was previously explored by Mano River Resources in 1999 to 2000 and results from seven trenches and four drill holes were reported in 2000. The trench results showed grades of between 1 and 2 g/t over wide widths of 20m to 64m. Five diamond drill holes were drilled in various orientations with a best intercept of 36m grading 3.3 g/t from hole GD4.

The Company's exploration teams have recently undertaken geological mapping, trenching and diamond drilling programmes at the Gondoja target. A total of seven trenches have been excavated for 577m and a diamond drilling programme is in progress with 7 holes from a 12 hole programme (2,300 metres) completed to date. Results from the first trench, GT04, have been received and highlight a mineralised interval of 87 metres grading 1.4 g/t and including 7 metres grading 13.1 g/t. This mineralised zone locates 50m SW of historical hole GD4. Gold mineralisation at Gondoja locates at the sheared contact between ultramafic and metabasalt rocks and is associated with disseminated arsenopyrite and pyrhotite and silicia-sericite-carbonate alteration. The gold-bearing shear zone has been mapped for 600m in a NE to SW orientation and is still open in both directions. Gold in soil anomalies have been defined for over four kilometres in a NE-SW direction in this area. At the Gbalidee target, locating two kilometres SW of Gondoja, four trenches for 235 metres have been completed and a programme of 8 diamond drill holes is planned. The geology of Gbalidee is very similar to Gondoja.

Results from trench GT04 and the historical trenches and drill holes are summarised in table 2 below:

Table 2:

Trench ID

From (m)

To (m)

Intersection

Length (m)

Au Grade g/t

T-1

n/a

n/a

50

1.4

T-2

n/a

n/a

20

1.9

T-3

n/a

n/a

64

1.0

T-4

n/a

n/a

30

2.2

T-7

n/a

n/a

15

4.2

GT04

14

101

87

1.4

including

60

67

7

13.1

Borehole ID

From (m)

To (m)

Intersection

Length (m)

Au Grade g/t

GD-1

38

42

4

3.0

GD-2

12

14

2

1.1

GD-4

74

110

30

3.9

GD-5

38

42

4

2

and

58

64

6

1.2

Assay grade data is un-cut.

NSV - T-5, T-6 and GD-3

GT04 is a part of the new trenching programme

Airborne Geophysical surveys outline major structural zones for follow up exploration programmes

The company has completed a comprehensive airborne geophysical survey for radiometric and magnetics which covers the license portfolio of 549km2. Line spacing was at 50m and 100m and flying height was at an optimal 100m above the surface. Processed and interpreted images of the data highlight numerous structural zones and lithological contacts which are considered to be priority areas for follow up exploration work. This work will commence after the rainy season, in November 2012.

 

Diagrams of Leopard Rock, Ndablama, Gondoja and the airborne geophysical survey

The geology, soil geochemistry and sections of Leopard Rock are illustrated in the following link: http://aureus-mining.com/wp-content/uploads/2012/06/Leopard-Rock.pdf

Ndablama geology and dill locations are illustrated in the following link:

 http://aureus-mining.com/wp-content/uploads/2012/06/Ndablama.pdf

The geology of Gondoja and the associated soil geochemistry on this area are illustrated in the following link:

http://aureus-mining.com/wp-content/uploads/2012/06/Gondoja.pdf

Selective images of the airborne survey are illustrated in the following link:

http://aureus-mining.com/wp-content/uploads/2012/06/Bea-Geophysics.pdf

Contact Information

Aureus Mining Inc.

David Reading / Jeremy Cave

Tel: +44(0) 20 7257 2930

 

Buchanan

Bobby Morse / Gordon Poole

Tel: +44(0) 20 7466 5000

RBC Capital Markets (Nominated Adviser and Joint Broker)

Martin Eales / Richard Hughes

Tel: +44(0) 20 7653 4000

GMP Securities Europe LLP (Joint Broker)

Richard Greenfield / Alexandra Carse

Tel: +44(0) 20 7647 2800

 

Qualified Person

The Company's Qualified Person responsible for preparing this release is David Reading, who holds a MSc in Economic Geology from University of Waterloo, Canada and is a Fellow of the Institute of Materials, Minerals and Mining. David Reading is the President and CEO of Aureus Mining Inc. and consents to the inclusion in the announcement of the matters based on their information in the form and context in which it appears and confirms that this information is accurate and not false or misleading.

Assay and sampling information are taken from the Company's database as prepared on New Liberty site by the project geologists. Drill core is split on site and sent under custody to the Alex Stewart-OMAC sample preparation facility in Monrovia where pulps are prepared and dispatched to the OMAC laboratory in Ireland for analysis by fire assay with an atomic absorption finish.

Quality control and quality assurance procedures include the regular and methodical implementation of field duplicates, blank samples, standards and laboratory repeats as well as regular and specific programmes of re-assaying and umpire laboratory assaying.

 

About Aureus Mining

The Company's assets include the New Liberty gold deposit in Liberia (the "New Liberty Gold Project"), which has an estimated Reserve of 873,000 ounces of gold grading 3.1 g/t and an estimated Measured and Indicated Mineral Resource of 1,143,000 ounces of gold grading 3.6 g/t and an estimated Inferred Mineral Resource of 593,000 ounces of gold grading 3.2 g/t. A technical update for the New Liberty gold project was released in February 2012, derisking and building on the robust PEA, filed in December 2010. The project is expected to have an eight year mine life and annual production of 123,000 ounces for the first four years.

The New Liberty Gold Project is located within the Bea Mountain mining license which covers 457 km² and has a 25 year, renewable, mineral development agreement. The Bea Mountain mining license also hosts the proximal gold targets of Ndablama, Gondoja and Weaju, which are the focus of exploration programs during 2012. The contiguous Archaen Gold exploration licence is also a focus of exploration for 2012, with Leopard Rock being the main target.

The Company also has gold assets within exploration properties in Cameroon.

Forward-Looking Information

This press release contains certain forward-looking information. All information, other than information regarding historical fact, that addresses activities, events or developments that Aureus Mining believes, expects or anticipates will or may occur in the future is forward-looking information. Forward-looking information contained in this press release includes, but may not be limited to, the future plans and objectives of Aureus Mining and their anticipated future growth, mineral resource estimates and the anticipated exploration and development activities of Aureus Mining. The foregoing and any other forward-looking information contained in this press release reflects the current expectations, assumptions or beliefs of Aureus Mining based on information currently available to Aureus Mining. With respect to the forward-looking information contained in this press release, Aureus Mining has made assumptions regarding, among other things: general business, economic and mining industry conditions; and it has also been assumed that no material adverse change in the price of precious and/or base metals occurs, no unusual geological or technical problems occur and no significant events occur outside of the normal course of Aureus Mining's respective business.

Such forward-looking information is subject to a number of risks and uncertainties that may cause actual results or events to differ materially from current expectations, including: risks normally incidental to exploration and development of mineral properties; uncertainties in the interpretation of results from drilling and test work; the possibility that future exploration, development or mining results will not be consistent with expectations; uncertainty of mineral resources estimates; adverse changes in precious and/or base metal prices; and future unforeseen liabilities and other factors including, but not limited to, those listed under "Risk Factors" in the Preliminary Prospectus of Aureus Mining Inc. dated April 20, 2011, a copy of which is available on SEDAR at www.sedar.com, and in the Aureus Mining Admission Document, a copy of which is available at www.aureus-mining.com.

Any mineral resource figures referred to in this press release are estimates and no assurances can be given that the indicated levels of minerals will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While Aureus Mining believes that the mineral resource estimates in respect of their respective properties are well established, by their nature mineral resource estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. If such mineral resource estimates are inaccurate or are reduced in the future, this could have a material adverse impact on Aureus Mining, as applicable. Due to the uncertainty that may be attached to inferred mineral resources, it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of continued exploration.

Forward-looking information speaks only as of the date on which it is made and, except as may be required by applicable law, Aureus Mining disclaims any obligation to update or modify such forward-looking information, either as a result of new information, future events or for any other reason.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDGGDLRGBBGDB
Date   Source Headline
6th Jan 20207:00 amRNSAcquisition by Avesoro Jersey of Remaining Shares
19th Dec 20199:50 amRNSConfirmation of Cancellation date
12th Dec 20197:00 amRNSLoan Agreement
4th Dec 20195:30 pmRNSAvesoro Resources
4th Dec 201910:30 amRNSExpiry of Extension Period, Compulsory Acquisition
25th Nov 20197:00 amRNSExtension of Offer to Acquire
14th Nov 20197:00 amRNSThird Quarter Results 2019
21st Oct 20197:00 amRNSDirectors' Circular in Response to Take-over Bid
21st Oct 20197:00 amRNSLoan Agreement
17th Oct 20193:00 pmRNSInsider Bid and Abridgement of Deposit Period
10th Oct 20197:00 amRNSQ3 2019 Production Update
3rd Oct 20197:00 amRNSPit Wall Failure at New Liberty
1st Oct 201911:30 amRNSBLOCK LISTING SIX MONTHLY RETURN
2nd Sep 20197:00 amRNSLoan Agreement and Update on Acquisition Proposal
20th Aug 20197:00 amRNSAcquisition Proposal & Operational Update
9th Aug 20191:52 pmRNSUpdate on the Security Breach at Youga
8th Aug 20194:40 pmRNSSecurity Breach at Youga
8th Aug 20197:00 amRNSFINANCIAL RESULTS AND OPERATIONAL UPDATE
1st Aug 20192:05 pmRNSSecond Price Monitoring Extn
1st Aug 20192:00 pmRNSPrice Monitoring Extension
15th Jul 20197:00 amRNSFUNDING POSITION UPDATE & SIGNING OF CONTRACT
10th Jul 20197:00 amRNSQ2 2019 PRODUCTION UPDATE
21st Jun 20197:00 amRNSFILING OF NI43-101 TECHNICAL REPORT FOR YOUGA MINE
17th Jun 20197:00 amRNSMining and Processing Operations Restart at Youga
14th Jun 20192:00 pmRNSPrice Monitoring Extension
12th Jun 20197:00 amRNSOperational Update
10th Jun 20197:00 amRNSOPERATIONAL AND GUIDANCE UPDATE
15th May 20197:00 amRNSFINANCIAL RESULTS FOR THE QUARTER ENDED MARCH 2019
8th May 20197:00 amRNSAVESORO REPORTS 23% INCREASE IN MINERAL RESERVES
11th Apr 20197:00 amRNSQ1 2019 Production Update
2nd Apr 20197:00 amRNSFILING OF TECHNICAL REPORT FOR NEW LIBERTY MINE
1st Apr 20193:52 pmRNSBLOCK LISTING SIX MONTHLY RETURN
27th Mar 20192:00 pmRNSNOTICE OF ANNUAL GENERAL MEETING
14th Mar 20197:00 amRNSFINANCIAL RESULTS FOR YEAR ENDED 31 DECEMBER 2018
6th Mar 20197:00 amRNSPRE-FEASIBILITY STUDY AND 2019 PRODUCTION GUIDANCE
17th Jan 20197:00 amRNSQ4 2018 PRODUCTION RESULTS
19th Dec 20185:00 pmRNSGrant of Stock Options
13th Nov 20187:23 amRNSQ3 Results
9th Nov 20187:00 amRNSDisclosure of Related Party Transactions
31st Oct 20185:15 pmRNSTR-1: Notification of major holdings
10th Oct 20187:00 amRNSYOUGA-OUARÉ DRILLING RESULTS & EXPLORATION UPDATE
9th Oct 20187:00 amRNSQ3 2018 PRODUCTION UPDATE
1st Oct 20183:42 pmRNSBlock listing Interim Review
24th Sep 20183:17 pmRNSHolding(s) in Company
19th Sep 20187:00 amRNSAvesoro Upgrades New Liberty Mineral Resources
17th Aug 20186:15 pmRNSAmended and Restated Financial Statements
13th Aug 20187:00 amRNSFINANCIAL HIGHLIGHTS FOR 3&6 MONTHS ENDED JUNE 30
2nd Aug 20187:00 amRNSFILING OF NI43-101 TECHNICAL REPORT FOR YOUGA MINE
12th Jul 20187:00 amRNSNDABLAMA DRILLING COMPLETE AND EXPLORATION UPDATE
9th Jul 20187:00 amRNSQ2 2018 PRODUCTION UPDATE

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.