Leopard Rock drilling and trench results

27 Feb 2012 07:00

RNS Number : 1342Y
Aureus Mining Inc.
27 February 2012
 



For immediate release 27 February 2012

 

Aureus Mining Inc.

TSX : AUE

AIM : AUE

NEWS RELEASE

 

Leopard Rock drilling intercepts 4 metres grading 17.6 g/t and 6 metres grading 9.4 g/t. A 13km gold corridor is outlined between Leopard Rock and Gondoja.

 

Aureus Mining Inc. ("Aureus" or the "Company") announces encouraging drilling and trenching results from exploration programmes undertaken at the Leopard Rock gold target, the south eastern extension of the Ndablama prospect, on its 100% owned Archaen Gold exploration Licence in Liberia. Leopard Rock is 40 km ENE of Aureus's flagship New Liberty Gold Project.

 

·; Results from the first 9 diamond drill holes of a 24 hole programme (3,691 metres) returned multiple gold intercepts which include high grade highlights of:

 

- 17.6 g/t over 4 metres

- 9.4 g/t over 6 metres

- 9.5 g/t over 3 metres

- 9.2 g/t over 2 metres

- 5.5 g/t over 4 metres

 

·; Drilling to date has been designed to test a North West trending, gold bearing shear zone over a strike length of 800 metres. Results from 15 holes are still pending.

 

·; A systematic soil geochemistry, trenching, channel sampling and geological mapping programme over the same target area has outlined that the mineralised system extends over at least 1.2km and is still open to the NE and SW. Highlights of the trenching and channel sampling programme include:

 

- 6.4 g/t over 11 metres

- 6.9 g/t over 4 metres

- 5.6 g/t over 7 metres

- 4.0 g/t over 7 metres

- 2.0 g/t over 13 metres

- 1.3 g/t over 27 metres

 

·; Regional exploration programmes have outlined a gold corridor greater than 13km in strike length, which is defined by gold in soil anomalies and reconnaissance trenching and drilling. Diamond drilling undertaken on three targets within the gold corridor has intersected gold mineralisation in primary rock: at Leopard Rock, Ndablama and Gondoja. Only 15% of the gold corridor has been drill tested to date. Future drilling programmes will now focus on the Ndablama target and the area around Gondoja, as defined by gold in soil anomalies.

 

Commenting on the results, David Reading, Chief Executive Officer of Aureus, said:

"The drilling and trenching results from Leopard Rock are very encouraging and demonstrate the highly prospective nature of our licence area in Liberia. It highlights the value in the Company additional to the exciting New Liberty Project, where civil construction is expected to start in Q4 of this year and production in Q4 2013. To date we have only explored 10% of our 546km2 total licence area with soil geochemistry, and outside of New Liberty we have only undertaken reconnaissance drilling programmes on four targets. However, this work has already outlined an extensive 13km gold corridor. Between now and the end of the field season, in July, we will be pushing hard to cover more ground and drill test additional targets."

 

 

Leopard Rock gold target - soil geochemistry, reconnaissance trenching and diamond drilling programmes outline a +1.5km shear zone target which is still open to the NW and SE.

 

The Leopard Rock gold target is located approximately 40km ENE of the New Liberty deposit within the Archaen Gold exploration license. Exploration work has been in progress on this target area over the last five months and includes programmes of soil geochemistry, geological mapping, rock chip channel sampling, trenching and diamond drilling. This work has outlined a +1.5km, NW-SE trending gold in soil anomaly which is associated with sheared ultramafic and meta-basalt rocks.

 

A trenching and channel programme within the shear zone has confirmed bedrock gold mineralisation over a least 1.2km of the soil anomaly and further trenching results are pending to the south west. All of the trench and channel sample results are given in table one below:

 

Table 1: Leopard Rock trench and channel sample results

Trench ID

From (m)

To (m)

Length (m)

Au Grade g/t

Including g/t

LT01

24

33

9

1.0

LT02

15

28

13

1.0

4m @ 0.6

LT06

71

79

8

0.7

LT08

25

33

8

1.3

LT09

18

45

27

1.3

13m @ 2.0

LT010

6

31

25

1.8

4m @ 6.9

34

50

16

0.5

95

97

2

1.4

LT012

0

5

5

0.5

17

29

12

1.0

32

38

6

0.8

64

82

18

0.7

7m @ 1.0

LT013

113

121

8

1.7

LT016A

28

46

18

0.7

LT017A

58

63

5

0.7

76

88

12

0.5

LT018

53

59

6

1.6

LT019

78

86

8

0.6

94

96

2

1.7

LT020

41

49

8

0.7

61

63

2

1.8

LT021

54

63

9

0.8

LT022

0

12

12

0.6

33

35

2

7.0

LCS1

0

7

7

4.0

9

15

6

1.8

LCS2

0

11

11

6.4

13 

20

7

5.6

LCS3

20

29

9

1.6

Assay grade data is un-cut.

 

The trenching and surface channel sampling work has outlined multiple gold zones over widths of 2 to 27 metres which have returned grades ranging from 0.5 g/t to 7 g/t. All trenches were excavated to a depth of two metres and channel sampled at continuous one metre intervals along the base of the trench.

 

A diamond drilling programme designed to test the 800m strike of the target zone commenced in December 2011. To date 24 holes have been completed for 3,691m. Results have been received for the first 9 holes and are tabulated as follows:

 

Table 2: Leopard Rock Diamond drill hole results

Borehole ID

From (m)

 

To (m)

 

Core Length (m)

Au Grade g/t

Including g/t

LDD001

2

22

20

1.9

52

61

9

1.9

3m @ 5.0

LDD002

52

54

2

1.7

LDD003

NSV

LDD004

79

83

4

5.5

87

91

4

17.6

LDD005

2

10

8

1.0

42

44

2

9.2

LDD006

24

35

11

1.7

39

43

4

1.0

56

59

3

9.5

LDD007

27.5

33

5.5

1.0

45

46

1

1.4

LDD008

40.4

45

4.6

0.7

51

54

3

0.7

74

78

4

1.9

LDD009

107

113

6

9.4

4m @ 13.9

Assay grade data is un-cut.

NSV - No Significant Value

 

The diamond drilling cores demonstrate that the gold mineralisation is associated with disseminated pyrite, pyrhotite and arsenopyrite locating within sheared and altered ultramafic and metabasalt rocks which have been intruded by granitic dykes. Gold zones vary from thin (1-4 metres) higher grade (+5 g/t) bodies to wider intercepts (8-20 metres) grading 0.7 to 2.0 g/t. Further diamond drilling is planned along the north-west extension of the mineralised system as defined by gold in soil anomalies and trenching.

 

 

Exploration programmes highlight +13km gold corridor extending from Leopard rock to Gondoja

 

Regional exploration work has been undertaken within the Leopard Rock, Ndablama and Gondoja areas involving soil geochemistry, channel sampling, trenching and diamond drilling. The gold in soil anomalies define a zone of continuous anomalism over 13km in length and widths of over 1km. The gold in soil anomalies have been drill tested and trenched at the Ndablama, Leopard Rock and Gondoja targets and in all cases this work has returned gold mineralisation within the bedrock confirming the source of the soil anomalies. To date only 15% of the gold corridor has been drill tested. Once the Leopard Rock drilling has been completed the company intends to move the diamond rigs to Ndablama to complete another 3,500 metres of drilling and then onto the Gondoja targets to complete a further 4,000 metres of drilling.

 

The location of the Leopard Rock target, the gold corridor and the diamond drilling and trench results are illustrated in the following links:

http://aureus-mining.com/wp-content/uploads/2012/02/Image-1.png

http://aureus-mining.com/wp-content/uploads/2012/02/Image-2.png

http://aureus-mining.com/wp-content/uploads/2012/02/Image-3.png

http://aureus-mining.com/wp-content/uploads/2012/02/Image-4.png

 

 

 

 

 

 

 

 

Contact Information

 

Aureus Mining Inc.

David Reading / Jeremy Cave

Tel: +44(0) 20 7257 2930

 

Buchanan

Bobby Morse / James Strong

Tel: +44(0) 20 7466 5000

RBC Capital Markets

Nominated Advisor and Joint Broker

Martin Eales / Richard Hughes / Jonathan Hardy

Tel: +44(0) 20 7653 4000

 

 

GMP Securities Europe LLP

Joint Broker

Richard Greenfield / Alexandra Carse

Tel: +44(0) 20 7647 2800

Qualified Person

The Company's Qualified Person responsible for preparing this release is David Reading, who holds a MSc in Economic Geology from University of Waterloo, Canada and is a Fellow of the Institute of Materials, Minerals and Mining. David Reading is the President and CEO of Aureus Mining Inc. and consents to the inclusion in the announcement of the matters based on their information in the form and context in which it appears and confirms that this information is accurate and not false or misleading.

 

Assay and sampling information are taken from the Company's database as prepared on New Liberty site by the project geologists. Drill core is split on site and sent under custody to the Alex Stewart-OMAC sample preparation facility in Monrovia where pulps are prepared and dispatched to the OMAC laboratory in Ireland for analysis by fire assay with an atomic absorption finish.

 

Quality control and quality assurance procedures include the regular and methodical implementation of field duplicates, blank samples, standards and laboratory repeats as well as regular and specific programmes of re-assaying and umpire laboratory assaying.

 

About Aureus Mining

The Company's assets include the New Liberty gold deposit in Liberia (the "New Liberty Gold Project"), which has an estimated Reserve of 873,000 ounces of gold grading 3.1 g/t and an estimated Measured and Indicated Mineral Resource of 1,086,000 ounces of gold grading 3.6 g/t and an estimated Inferred Mineral Resource of 483,000 ounces of gold grading 3.5 g/t. A technical update for the New Liberty gold project was released in February 2012, de-risking and building on the robust preliminary economic assessment ("PEA"), filed in December 2010. This update outlined an improved pre-tax NPV of US$ 260 million based on a US$ 1,350/oz. average gold price and a discount rate of 8 %, with an 8 year mine life and an average production of 123,000 ounces per year modelled for the first four years.

The New Liberty Gold Project is located within the Bea Mountain mining license which covers 457 km2 and has a 25 year, renewable, mineral development agreement. The Bea Mountain mining license also hosts the proximal gold targets of Ndablama, Gondoja and Weaju, which are the focus of exploration programs during 2012 along with the Company's Archaen Gold exploration license contiguous with and immediately south of the Bea Mountain mining license and containing the Leopard Rock target.

 

The Company also has gold assets within exploration properties in Cameroon.

 

 

Forward-Looking Information

This press release contains certain forward-looking information. All information, other than information regarding historical fact that addresses activities, events or developments that Aureus Mining believes, expects or anticipates will or may occur in the future is forward-looking information. Forward-looking information contained in this press release includes, but may not be limited to, the future plans and objectives of Aureus Mining and their anticipated future growth, mineral resource estimates and the anticipated exploration and development activities of Aureus Mining. The foregoing and any other forward-looking information contained in this press release reflects the current expectations, assumptions or beliefs of Aureus Mining based on information currently available to Aureus Mining. With respect to the forward-looking information contained in this press release, Aureus Mining has made assumptions regarding, among other things: general business, economic and mining industry conditions; and it has also been assumed that no material adverse change in the price of precious and/or base metals occurs, no unusual geological or technical problems occur and no significant events occur outside of the normal course of Aureus Mining's respective business.

 

Such forward-looking information is subject to a number of risks and uncertainties that may cause actual results or events to differ materially from current expectations, including: risks normally incidental to exploration and development of mineral properties; uncertainties in the interpretation of results from drilling and test work; the possibility that future exploration, development or mining results will not be consistent with expectations; uncertainty of mineral resources estimates; adverse changes in precious and/or base metal prices; and future unforeseen liabilities and other factors including, but not limited to, those listed under "Risk Factors" in the Preliminary Prospectus of Aureus Mining Inc. dated April 20, 2011, a copy of which is available on SEDAR at www.sedar.com, and in the Aureus Mining Admission Document, a copy of which is available at www.aureus-mining.com.

 

Any mineral resource figures referred to in this press release are estimates and no assurances can be given that the indicated levels of minerals will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While Aureus Mining believes that the mineral resource estimates in respect of their respective properties are well established, by their nature mineral resource estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. If such mineral resource estimates are inaccurate or are reduced in the future, this could have a material adverse impact on Aureus Mining, as applicable. Due to the uncertainty that may be attached to inferred mineral resources, it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of continued exploration.

 

Forward-looking information speaks only as of the date on which it is made and, except as may be required by applicable law, Aureus Mining disclaims any obligation to update or modify such forward-looking information, either as a result of new information, future events or for any other reason.

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUCCPUPPGRQ
Date   Source Headline
31st Jan 20179:30 amRNSStatement re Revised Finance Facility
31st Jan 20177:00 amRNSStatement re Revised Finance Facility
27th Jan 20177:00 amRNSAppointment of Hannam & Partners as Joint Broker
26th Jan 20177:00 amRNS2017 Production Guidance
24th Jan 20177:00 amRNSStatement re Arbitration Claim
12th Jan 20177:00 amRNSQ4 Production and Operations Update
30th Dec 20167:00 amRNSTOTAL VOTING RIGHTS
15th Dec 20167:00 amRNSBank waiver extension
9th Dec 20163:19 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
9th Dec 20167:00 amRNSChange in TIDM, ISIN, SEDOL and Company Website
7th Dec 20165:10 pmRNSGRANT OF STOCK OPTIONS TO DIRECTORS AND EMPLOYEES
6th Dec 20169:30 amRNSCompany Update
29th Nov 201611:30 amRNSRESULTS OF SPECIAL MEETING OF SHAREHOLDERS
14th Nov 20167:00 amRNSQ3 2016 RESULTS AND OPERATIONAL UPDATE
7th Nov 20167:00 amRNSNOTICE OF SPECIAL MEETING
28th Oct 20165:30 pmRNSFundraising update
14th Oct 201610:30 amRNSUS$72 million equity fundraise
13th Oct 201610:20 amRNSEXTENSION OF WAIVER AND STANDSTILL AGREEMENT
3rd Oct 201611:35 amRNSBLOCK LISTING SIX MONTHLY RETURN
6th Sep 20167:00 amRNSTRANSITION TO OWNER-OPERATOR MINING MODEL
22nd Aug 201611:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
15th Aug 20165:10 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
10th Aug 201610:29 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
9th Aug 20164:26 pmRNSCORRECTION - GRANT OF STOCK OPTIONS
9th Aug 20163:05 pmRNSGRANT OF OPTIONS
8th Aug 20167:00 amRNSQ2 2016 RESULTS AND OPERATIONAL UPDATE
1st Aug 20169:00 amRNSTOTAL VOTING RIGHTS
20th Jul 201611:52 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
15th Jul 20166:30 pmRNSFINAL TRANCHE OF US$30M EQUITY FINANCING
1st Jul 20167:00 amRNSTotal Voting Rights
23rd Jun 201611:32 amRNSResults of AGM
23rd Jun 20167:00 amRNSApproval by MLME for plant restart
21st Jun 20167:00 amRNSFirst tranche equity financing
15th Jun 20167:00 amRNSEquity Financing
14th Jun 201611:22 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
9th Jun 20167:00 amRNSUpdate on New Liberty Gold Mine
1st Jun 20167:00 amRNSDEBT REPAYMENT DEFERRAL
24th May 201610:00 amRNSNotice of AGM and Posting of Annual Accounts
23rd May 20167:00 amRNSNEW LIBERTY OPERATIONS UPDATE
13th May 20167:00 amRNSFINANCIAL RESULTS FOR Q1 2016
12th May 20165:02 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
10th May 20167:00 amRNSNew Liberty temporarily suspends plant operations
5th May 20162:55 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
3rd May 20167:00 amRNSDEBT REPAYMENT DEFERRAL AND MINE PLAN UPDATE
12th Apr 20164:51 pmRNSBLOCK LISTING SIX MONTHLY RETURN
5th Apr 20167:00 amRNSDEBT DEFERRAL APPROVAL AND MINE PLAN UPDATE
30th Mar 20167:00 amRNSFINANCIAL RESULTS FOR YEAR ENDED DECEMBER 31, 2015
17th Mar 20167:00 amRNSNew Liberty gold production update
2nd Mar 20167:00 amRNSCOMMERCIAL PRODUCTION DECLARED AT NEW LIBERTY MINE
1st Mar 20167:00 amRNSDEBT DEFERRAL APPROVAL

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.