The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAvesoro Resources Regulatory News (ASO)

  • There is currently no data for ASO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Gold Recovery at New Liberty Confirmed

28 Jan 2013 07:00

RNS Number : 4581W
Aureus Mining Inc.
28 January 2013
 



 

28 January 2013

 

Aureus Mining Inc.

 

TSX : AUE

 

AIM : AUE

NEWS RELEASE

 

FURTHER METALLURGICAL TESTING ON NEW LIBERTY ORE CONFIRMS GOLD RECOVERY AND REDUCES REAGENT CONSUMPTION AND CIL RESIDENCE TIME

 

Aureus Mining Inc. ("Aureus" or the "Company")is pleased to announce that the metallurgical optimization test work programme undertaken as part of the on-going New Liberty Project ("New Liberty" or the "Project") optimization phase confirms a substantial improvement on the results in the original Technical Report published in October 2012. Key highlights include:

·; Improved leach kinetics allows for halving the leach residence time

·; Cyanide consumption has been reduced to one-third

·; Potential gold recovery increase to over 93%

·; Cyanide destruction process - sodium metabisulphite addition could be reduced from 2.0kg/t to 0.5kg/t

 

Metallurgical test work has shown encouraging results with improved leach kinetics indicating that the recovery of 93% modelled in the Technical Report is achievable at a reduced carbon in leach ("CIL") residence time of 24 hours (previously 48 hours), with significantly lower reagent consumption. These improvements will impact positively on both the capital and operating costs. Overall plant recovery will be defined when an economic trade-off has been completed to quantify the recovery benefit associated with the inclusion of a regrind mill.

 

The extensive optimization test work was completed on a 240kg representative bulk composite sample and six variability composite samples from the New Liberty deposit and has produced the following key results:

·; Improved leach kinetics allows for halving the leach residence time - The inclusion of high shear and oxygen addition resulted in improved leached kinetics. The improved leach kinetics allow for a reduction in leach residence time to 24 hours.

·; Cyanide consumption has been reduced to one-third - CIL reagent optimization test work indicated that cyanide consumption could be reduced from 1.5kg/t to 0.5kg/t with the inclusion of lead nitrate addition of 25g/t.

·; Potential gold recovery increase to over 93% - The evaluation of CIL recovery as a function of grind size on the bulk master composite sample at a head grade of 4.23g/t indicated that at a grind of 90% passing 75 micron CIL recovery increased recovery to 91.7% as compared to 91.2% for a mill grind of 80% passing 75 micron. A further increase in mill grind to 95% passing 75 micron resulted in an increase in CIL recovery to 94.5%.

·; Continuous tests using a Hybrid SO2/Air process indicated that a weak acid dissociable cyanide ("CN (WAD)") concentration of less than 20ppm could be achieved in the effluent stream. This CN (WAD) concentration is below the target level of 50ppm as stipulated by the International Cyanide Code of Practice. This test work also indicated that for the Hybrid SO2/Air process (cyanide destruction process) sodium metabisulphite addition could be reduced from 2.0kg/t to 0.5kg/t.

·; Variability test work was conducted on five core samples with a head grade value ranging from 4.26g/t - 10.44g/t at an average of 5.9g/t. It was found that for a grind size of 93% passing 75 micron, the overall gold extraction ranged from 92.6% - 97.9% of the gold present in the feed sample as measured by screen fire assay, with an average test work recovery of 94.3%.

·; The results of the metallurgical test work is the first of a number of initiatives which are part of the re-optimization programme announced in November 2012 after completion of the feasibility study. Initiatives include remodelling the creek diversion,, the optimum location of the processing plant, and further improvements in the infrastructure at New Liberty. The full results will be announced at the end of Q1 2013.

 

Commenting on the metallurgical test results, David Reading stated:

 

"These metallurgical results, which indicate significantly lower operating costs due to factors which include a shorter CIL residence time and lower consumption of reagents, further demonstrate the strong economics of New Liberty. This is the first set of results for what is an on-going optimization programme, the full results of which will be available towards the end of the first quarter of this year. We are confident the results of this programme will further enhance the returns for all stakeholders on what will be Liberia's first commercial gold mine."

 

Introduction

Subsequent to the feasibility study the Company initiated optimization phase for the Project. The objective of the optimization phase test work was to finalize the flowsheet and optimize reagent consumption while achieving an overall test work recovery of 93%.

 

Metallurgical Testwork Programme

A metallurgical test work programme has been completed as part of the optimization phase. The test work programme was undertaken by the Australian, Perth based, ALS Laboratories ('ALS').

 

In October 2012, 800kg of pre-crushed (12.7mm) core sample material was delivered to ALS's mineral progressing facility for metallurgical characterization test work. This material was the product material from comminution test work conducted on core samples at JKtech in September 2012. The sample material received from JKtech was composited to produce a 240kg bulk master composite sample for test work aimed at finalizing the flowsheet and optimizing reagent consumption. This bulk sample was comprised of pre-crushed core samples from the western and central portions of the deposit at various depths. The master composite had a gold grade of 4.23g/t. In addition to the test work conducted on the master composite sample, further variability test work was conducted using the optimized flowsheet and reagent consumptions. Six (6) variability samples were prepared from the pre-crushed core samples as received from JKtech and four (4) additional ½ drill core samples which were delivered to ALS in December 2012. The four additional ½ drill core sample mass totalled 136kg. The variability samples had a measured gold grade ranging from 4.26 g/t - 10.44g/t.

 

The scope of work of the test work programme included:

·; Sample preparation, bulk mineralogy and chemical analysis

·; Evaluation of preg-robbing

·; Comparison of kinetic leach performance for the feasibility study flowsheet which was based on a 24 hour leach followed by a 24 hour CIP process as compared to an flowsheet that includes high shear pre-oxidation followed by a 24 hour CIL process with oxygen addition

·; Gravity recoverable gold (GRG) test work and modelling by Consep for further GRG verification

·; Grind on gravity tails to various target sizes namely; 80%,90%, 95% and greater than 95% passing 75 micron

·; Optimization of reagent consumptions for the carbon in leach (CIL) process and

·; Continuous cyanide destruction test work to determine the most suitable flowsheet and optimize reagent consumption

·; Levin test work to determine energy requirements, for a regrind milling application

 

The test work schedule was designed with the objective of finalizing the process flowsheet and optimizing reagent consumption while achieving a test work recovery of 93%. The results received from the test work program will provide engineering data to be utilized for finalizing the process flowsheet and refining the process plant operating costs.

 

 

Flowsheet Finalization and Reagent Optimization Test work Outcomes

Flowsheet Finalization and Reagent Optimization Test work were carried out on the master bulk composite sample. The results of this test work are as follows:

 

Evaluation of Preg-robbing

 

·; The testwork showed that gold extraction was similar for tests conducted with both carbon and diesel present as compared to leach tests conducted with no carbon present

·; Based on the similarity in overall extraction it can be inferred that there is no evidence of preg-robbing

 

 

Figure 1: Results for testing conducted to evaluate preg-robbing

http://aureus-mining.com/wp-content/uploads/2013/01/Evaluation-of-Pregrobbing.png

 

Evaluation of Leach Kinetics with the Inclusion of High Shear

 

·; The testwork showed that a flowsheet with the inclusion of high shear and oxygen addition at a dissolved oxygen level maintained above 16ppm would allow for improved leached kinetics and improved overall recovery

·; The improved leach kinetics allow for a reduction in leach residence time to 24 hours

 

Figure 2: Kinetic curves for testing conducted to evaluate the inclusion of high shear Pre-oxidation on CIL residence time requirements

http://aureus-mining.com/wp-content/uploads/2013/01/Effect-of-Shear.png

 

 

Optimization of Reagent Consumption

 

·; CIL Reagent optimization test work indicated that cyanide consumption could be reduced from 1.5kg/t to 0.5kg/t with the inclusion of lead nitrate addition at 25g/t without negatively impacting on overall recovery

 

 

Figure 3: Kinetic curves for testing conducted to determine optimum CIL Cyanide addition requirements

http://aureus-mining.com/wp-content/uploads/2013/01/Cyanide-Consumption-Optimization.png

 

 

Evaluation of CIL recovery as a function of grind size

 

·; The evaluation of CIL recovery as a function of grind size indicated that at a grind of 90% passing 75 micron CIL recovery improved by 0.48% as compared to a mill grind of 80% passing 75 micron

·; Further evaluation of CIL recovery as a function of grind size indicated that at a grind of 95% passing 75 micron CIL recovery improved by 2.69% as compared to a mill grind of 90% passing 75 micron

·; It was found that a mill grind size in excess of 95% passing 75 micron did not show any further recovery benefit when compared to a mill grind of 95% passing 75 micron

·; The target mill grind size of 95% passing 75 micron can be achieved with the inclusion of a regrind mill. Based on Levin test work, the regrind milling circuit has a power requirement of 6.8kwh/t and an estimated steel media consumption rate of 0.05kWh/t

 

 

Figure 4: Kinetic curves for testing conducted to evaluate CIL recovery as a function of grind size

http://aureus-mining.com/wp-content/uploads/2013/01/Effect-of-Grind.png

 

 

Continuous Cyanide Destruction Testing

 

·; Continuous SO2/Air cyanide destruction test work revealed that the target CN (WAD) concentration of less than 50ppm in the effluent stream could not be achieved even at a reagent addition ratio of 4:1 or 2.0kg/t Sodium metabisulphite

·; Continuous tests using a Hybrid SO2/Air process indicated that a CN (WAD) concentration of less than 20ppm could be achieved in the effluent stream with the addition of 0.5kg/t Sodium metabisulphite

 

Variability Test work Outcomes

Variability test work was carried out on five (5) variability core samples at a target grind of 90% passing 75 micron. Further variability test work was carried out on six (6) variability core samples at a target grind of 100% passing 75 micron. All variability test work was carried out using the optimized flowsheet configuration (as shown in Figure 1) and reagent consumptions in order to give an estimate of the expected range for recovery.

The results of the variability test work are as follows:

 

·; Variability test work was carried out on five (5) core samples with a head grade value ranging from 4.26g/t - 10.44g/t at an average of 5.9g/t. These tests were carried out at a grind of 93% passing 75 micron and indicated that a CIL gold residue grade of 0.22g/t - 0.36g/t could be achieved

·; For a grind size of 93% passing 75 micron, the overall gold extraction ranged from 92.6% - 97.9% of the gold present in the feed sample as measured by screen fire assay. At the time of publication the back calculated feed grades based on the test work results were not yet available

·; The average CIL residue grade for all variability tests conducted at 93% passing 75 micron was 0.31g/t with an average test work recovery of 94.3%

·; Further variability test work was conducted on six (6) core samples at a grind size in excess of 96% passing 75 micron. These tests produced overall recoveries in excess of 95%. This test work is to be re-evaluated using a different regrind testing strategy with a target grind of 95% passing 75 micron in order to replicate the expected feed to the mill by scalping the coarse size fraction for regrind. This will eliminate overgrinding of finer size fractions

 

Summary of Test work Results

 

A summary of the test work results for testing conducted on the master bulk composite and all variability samples are presented in Table 1 and Table 2 below:

 

 

Table 1: Summary of results for testing conducted on the master bulk composite sample (head grade of 4.23 g/t)

http://aureus-mining.com/wp-content/uploads/2013/01/Table-1.png

 

Table 2: Summary of results for testing conducted on the variability samples

http://aureus-mining.com/wp-content/uploads/2013/01/Table-2.png

 

 

New Liberty Flow Sheet

 

In the optimized flowsheet for New Liberty as presented in Figure 5, high shear oxygen addition has been added to the pre-oxidation tank and the leach tanks have been removed. The CIL circuit has been re-sized to allow for a 24 hour residence time. The optimized circuit also includes second stage cycloning and a regrind mill.

 

 

Figure 5: Optimized Process Flow Sheet

http://aureus-mining.com/wp-content/uploads/2013/01/Process-Flow-Sheet.png

 

 

 

 

Contact Information

Aureus Mining Inc.

David Reading / Jeremy Cave

Tel: +44(0) 20 7010 7690

 

Buchanan

Bobby Morse / Gordon Poole

Tel: +44 (0) 20 7466 5000

RBC Capital Markets (Nominated Adviser and Joint Broker)

Martin Eales / Richard Hughes

Tel: +44(0) 20 7653 4000

GMP Securities Europe LLP (Joint Broker)

Richard Greenfield / Alexandra Carse

Tel: +44(0) 20 7647 2800

 

About Aureus Mining Inc.

The Company's assets include the New Liberty gold deposit in Liberia (the "New Liberty Gold Project" or the "Project"), which has an estimated proven and probable reserve of 910,000 ounces of gold grading 3.3 g/t and an estimated measured and indicated mineral resource of 1,143,000 ounces of gold grading 3.6 g/t and an estimated inferred mineral resource of 593,000 ounces of gold grading 3.2 g/t. A feasibility study has been completed on the Project and construction has commenced with initial earthworks. The Project is expected to have an eight and a half year mine life and annual production of 120,000 ounces for the first five years of production. The Company has financed the Project's equity funding requirement and is in advanced discussions with interested parties to fund the balance.

The New Liberty Gold Project is located within the Bea Mountain mining licence, which covers 457 km² and has a 25 year, renewable, mineral development agreement. The Bea Mountain mining license also hosts the proximal gold targets of Ndablama, Gondoja and Weaju, which are the focus of exploration programs during 2013. The contiguous Archaen Gold exploration licence, which covers 89 km², is also a focus of exploration for 2013, with Leopard Rock being the main target.

The Company also has gold exploration permits in Cameroon.

Qualified Person

Information in this report that relates to Metallurgical Test Work Results is based on information compiled by Glenn Bezuidenhout of [DRA Mineral Projects. Glenn Bezuidenhout is a Fellow of SAIMM, and has sufficient experience, which is relevant to the style of mineralization and type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined by the NI-43-101 (National Instrument Code for the TSX) . Glenn Bezuidenhout consents to the inclusion in this report of the statements based on his information in the form and context in which it appears.

 

Forward-looking Statements 

This press release contains certain forward-looking information. All information, other than information regarding historical fact, that addresses activities, events or developments that Aureus Mining believes, expects or anticipates will or may occur in the future is forward-looking information. Forward-looking information contained in this press release includes, but may not be limited to, the future plans and objectives of Aureus Mining and their anticipated future growth, mineral resource estimates and the anticipated exploration and development activities of Aureus Mining. The foregoing and any other forward-looking information contained in this press release reflects the current expectations, assumptions or beliefs of Aureus Mining based on information currently available to Aureus Mining. With respect to the forward-looking information contained in this press release, Aureus Mining has made assumptions regarding, among other things: general business, economic and mining industry conditions; and it has also been assumed that no material adverse change in the price of precious and/or base metals occurs, no unusual geological or technical problems occur and no significant events occur outside of the normal course of Aureus Mining's respective business.

Such forward-looking information is subject to a number of risks and uncertainties that may cause actual results or events to differ materially from current expectations, including: risks normally incidental to exploration and development of mineral properties; uncertainties in the interpretation of results from drilling and test work; the possibility that future exploration, development or mining results will not be consistent with expectations; uncertainty of mineral resources estimates; adverse changes in precious and/or base metal prices; and future unforeseen liabilities and other factors including, but not limited to, those listed under "Risk Factors" in the Preliminary Prospectus of Aureus Mining Inc. dated April 20, 2011, a copy of which is available on SEDAR at www.sedar.com, and in the Aureus Mining Admission Document, a copy of which is available at www.aureus-mining.com.

Any mineral resource figures referred to in this press release are estimates and no assurances can be given that the indicated levels of minerals will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While Aureus Mining believes that the mineral resource estimates in respect of their respective properties are well established, by their nature mineral resource estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. If such mineral resource estimates are inaccurate or are reduced in the future, this could have a material adverse impact on Aureus Mining, as applicable. Due to the uncertainty that may be attached to inferred mineral resources, it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of continued exploration.

Forward-looking information speaks only as of the date on which it is made and, except as may be required by applicable law, Aureus Mining disclaims any obligation to update or modify such forward-looking information, either as a result of new information, future events or for any other reason.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDXGDBSXDBGXR
Date   Source Headline
10th Oct 20137:00 amRNSEXPECTED CLOSING OF US$16 MILLION OFFERING
3rd Oct 20137:00 amRNSUNDERWRITTEN FUND RAISE OF US$16.0 M
2nd Oct 20135:04 pmRNSAUREUS ANNOUNCES OFFERING TO RAISE APPROX US$15M
27th Sep 20139:00 amRNSBLOCK LISTING SIX MONTHLY RETURN
24th Sep 20137:00 amRNSRestated and Amended Mineral Development Agreement
23rd Sep 20137:00 amRNSECIC approves Project Debt Facility
13th Sep 201310:02 amRNSGrant of Stock Options
12th Sep 20137:00 amRNSAureus Mining Secures Debt Financing
6th Aug 20137:00 amRNSQ2 Financial Results and Operational Update
11th Jul 20137:00 amRNSNDABLAMA DELIVERS FURTHER HIGH GRADE GOLD
4th Jul 20137:00 amRNSTECHNICAL REPORT FILED FOR THE NEW LIBERTY PROJECT
1st Jul 20137:00 amRNSTotal Voting Rights
11th Jun 20133:00 pmRNSAnnual Meeting Results
11th Jun 20137:00 amRNSWEAJU DELIVERS FURTHER HIGH GRADE INTERCEPTS
22nd May 201312:47 pmRNSTR-1 Notification
20th May 20133:48 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
20th May 20137:00 amRNSNEW LIBERTY CONFIRMS STRONG FINANCIAL RETURNS
14th May 20137:00 amRNSNotice of Annual Meeting of Shareholders
9th May 20137:00 amRNSPublication of Q1 2013 Results
7th May 20137:00 amRNSBALL MILL ORDER FOR THE NEW LIBERTY GOLD PROJECT
26th Apr 20132:59 pmRNSTR-1 Notification
3rd Apr 20137:00 amRNSRelocation & Community Development Plans Approved
2nd Apr 20135:22 pmRNSTR-1: Notification of Major Interest in Shares
27th Mar 201310:00 amRNSBLOCK LISTING SIX MONTHLY RETURN
20th Mar 20137:00 amRNSFinancial Results For The Year Ended 31 December
20th Mar 20137:00 amRNSFINANCING FOR THE NEW LIBERTY GOLD PROJECT
18th Mar 20137:00 amRNSNotice of Preliminary Results
12th Mar 20137:00 amRNSHigh Grade Intercepts at Weaju Gold Target
1st Mar 201310:06 amRNSTotal Voting Rights
31st Jan 201310:00 amRNSTotal Voting Rights
31st Jan 20137:00 amRNSDevelopment Update for New Liberty
28th Jan 20137:00 amRNSGold Recovery at New Liberty Confirmed
22nd Nov 201211:39 amRNSNotification of major interest
22nd Nov 201211:38 amRNSNotification of major interest
19th Nov 20127:00 amRNSOperational Update
16th Nov 20122:29 pmRNSClosing Announcement
16th Nov 20127:00 amRNSExpected closure of offering
15th Nov 20127:00 amRNSResults for the Quarter ended 30 September 2012
5th Nov 20127:00 amRNSUnderwriting Agreement
2nd Nov 20127:00 amRNSAureus announces offering to raise US$80m
31st Oct 20127:00 amRNSTotal Voting Rights
22nd Oct 20122:00 pmRNSTECHNICAL REPORT FILED FOR THE NEW LIBERTY PROJECT
15th Oct 20127:00 amRNSENVIRONMENTAL PERMIT GRANTED
1st Oct 20127:00 amRNSNEW LIBERTY FEASIBILITY STUDY
28th Sep 20123:17 pmRNSBLOCK LISTING SIX MONTHLY RETURN
10th Sep 20127:00 amRNSExploration Drilling/Trenching Results
22nd Aug 201210:33 amRNSIssue of new common shares
15th Aug 20123:44 pmRNSGrant of Stock Options
13th Aug 20127:00 amRNSQ2 financial results for period ended 30 June 2012
2nd Aug 20127:00 amRNSAppointment of General Manager

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.