The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.25
Bid: 1.20
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.10 (8.333%)
Open: 1.25
High: 1.275
Low: 1.25
Prev. Close: 1.25
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Sustainable Power Solution for BKM Copper Project

27 Mar 2024 07:00

RNS Number : 4224I
Asiamet Resources Limited
27 March 2024
 

27 March 2024

 

Sustainable Power Solution for Remote Mining: KSK Biomass Feedstock Study Highlights

 

Asiamet Resources Limited ("Asiamet" or the "Company") is pleased to announce the successful completion of the KSK Biomass Feedstock Study, a crucial milestone in progressing a power solution for the Company's BKM copper cathode project in Central Kalimantan, Indonesia ("BKM" or the "BKM Copper Project"). Undertaken in collaboration with Britmindo Mining Services Singapore Pte Ltd, the study is a comprehensive assessment aimed at establishing a sustainable power solution for the BKM Copper Project within and/or proximal to Asiamet's KSK licence area, in which BKM is located.

The study, emphasising Asiamet's commitment to a renewable energy solution for the proposed greenfield BKM Copper Mine, addressed key parameters crucial for the development of a biomass power station in a remote mining region. All aspects referenced below will be developed in further detail once project execution and project development partners for the biomass power station are locked in, which are expected to be achieved in Q2 2024.

Highlights

· Abundant Biomass Feedstock Resources: Through an extensive in-field investigation, data collection and analysis, the study has identified ample biomass feedstock sourced primarily from palm oil mills within a 100km radius of the proposed power plant location that could feed a biomass power station dedicated to the BKM Copper Project. Robust feedstock supply not only ensures operational sustainability but also aligns with Asiamet's commitment to a renewable energy solution for BKM.

 

· Remote Mining Power Solution: The biomass power station offers a reliable, renewable energy solution for producing copper cathode at BKM. By leveraging local biomass resources, the project contributes to increased economic empowerment in the direct project area.

 

· Power Plant Location Assessment: Comprehensive evaluation concluded, proposing a unique cost-effective and lower carbon footprint transportation solution optimising available biomass transportation routes and significantly reducing the distance of the High-Voltage transmission line.

 

· Partnership model: Following the framework outlined in the 2023 Feasibility Study, the biomass power plant will be operated by a third party who will be responsible for its construction, operation and maintenance. Asiamet is actively engaged in advanced discussions with potential partners interested in fully financing the dedicated biomass power plant for the BKM Copper Project and will make a further announcement relating to an MOU or similar agreement once this is complete.

 

· Sustainability Focus: The study underscores Asiamet's commitment to sustainable development by prioritising the use of renewable energy solutions to power BKM. Biomass feedstock sourcing from palm oil mills promotes circular economy principles and reduces reliance on fossil fuels.

  

Biomass Feedstock Study Scope of Work

The scope of work for the KSK Biomass Feedstock Study encompassed several key components aimed at establishing a sustainable power solution for the BKM Copper Project; these were as follows:

Identification of Palm Oil Mills

Initial efforts focused on identifying and evaluating biomass feedstock sources, with a particular emphasis on palm oil mills located within a 100km radius of the proposed power plant location. Rigorous field investigations and data analysis were conducted to assess the suitability and availability of biomass feedstock, ensuring a robust supply chain for the biomass power station. The palm oil derived biomass material is of value for its energy content however it remains a stranded asset due to its location. This opens the opportunity for use in power generation for the BKM Copper Project at relatively low cost.

Optimal Power Plant Location

Simultaneously, the study optimised biomass transportation routes by evaluating existing infrastructure and potential transport networks. This entailed detailed assessments to minimise transportation distances and associated costs while maximising logistical efficiency.

Site evaluations were then undertaken to identify suitable locations for the biomass power station, considering factors such as accessibility, environmental impact, and proximity to biomass feedstock sources.

Cost Analysis of Feedstock Transportation

Thorough analysis of transportation costs considers distance, terrain challenges, and environmental sustainability. Strategies to minimise carbon footprint and optimise logistical efficiency are integrated into transportation planning models.

Viability of Transmission Line Construction

Detailed assessments of transmission line route feasibility addressed terrain complexities and potential cost implications. Emphasis was placed on minimising environmental impacts and optimising energy transmission efficiency. Moreover, the feasibility of constructing high-voltage transmission lines to connect the biomass power station to the BKM Copper Project site was thoroughly assessed. This involved conducting detailed surveys to identify potential routes, evaluate terrain challenges, and assess environmental impact and regulatory requirements.

Integration of Sustainability Principles

Throughout the study, sustainability principles were paramount, with a focus on the use of renewable biomass feedstock and minimising environmental disruption aligning with Asiamet's commitment to responsible resource development and environmental stewardship.

 

Darryn McClelland, Chief Executive Officer, commented:

"In addition to our other ongoing workstreams and corporate development activity, the KSK Power Study exemplifies Asiamet's commitment to sustainable mining practices and renewable energy initiatives. By prioritising environmental stewardship and community engagement, Asiamet aims to set a benchmark for responsible resource development in remote mining regions.

"Securing a consistent, sustainable power supply is paramount for any mining project, and the proposed Biomass Power Station enhances the environmental sustainability of the BKM Copper Project. We are particularly encouraged by substantial interest from potential partners in financing the power plant. Further details will be shared in due course.

"Considering the recent material uplift in the copper price, our projects are being increasingly recognised for their strategic importance. According to analyst reports copper supply will be constrained for years to come necessitating the fast-tracking or acquisition of new projects to meet global demand; the lack of exploration in copper and new discoveries will mean copper prices will likely be at new higher levels for a prolonged period. With a defined power solution now coupled with its high-quality resources, Asiamet has a clear pathway to production at BKM and is well-positioned to capitalise on these trends. The Board and management remain highly committed to delivering value from our asset base for all stakeholders.

"We also look forward to providing a further update this quarter, specifically regarding the appointment of partners for the BKM front end engineering design ("FEED") and project execution. We believe that early engagement of our project execution partners will be key to BKM's success and underscores our focus on efficient and effective advancement of the BKM copper mine development."

 

ON BEHALF OF THE BOARD OF DIRECTORS

Darryn McClelland, Chief Executive Officer

-Ends-

 

For further information, please contact:

 

Darryn McClelland Chief Executive Officer, Asiamet Resources LimitedEmail: darryn.mcclelland@asiametresources.com

 

Tony Manini Executive Chairman, Asiamet Resources LimitedEmail: tony.manini@asiametresources.com

 

Investor Enquiries

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha.sethi@flowcomms.com / info@asiametresources.com

Nominated & Financial Adviser Strand Hanson Limited

James Spinney / James Dance / Rob Patrick

Telephone: +44 20 7409 3494

Email: asiamet@strandhanson.co.uk

  

Broker

Optiva Securities Limited Christian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

 

Follow us on twitter @AsiametTweets

 

FORWARD-LOOKING STATEMENT

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEAADKAFXLEAA
Date   Source Headline
18th Oct 201811:45 amRNSPlans Additional Drilling to Enhance BKM BFS
25th Sep 201811:00 amRNSInterim Results
29th Aug 20187:00 amRNSDrilling Expands Beutong West Copper Deposit
21st Aug 201810:00 amRNSAppointment of Berenberg as Joint Corporate Broker
10th Aug 201810:00 amRNSBankable Feasibility Study Update
7th Aug 20187:15 amRNSDrilling Extends Beutong Copper Mineralisation
19th Jul 20184:30 pmRNSExercise of Options
12th Jul 20188:03 amRNSAppointment of Executive VP - External Relations
2nd Jul 20186:00 pmRNSExercise of Options and Warrants - Replacement
2nd Jul 201812:40 pmRNSExercise of Options and Warrants
26th Jun 20187:00 amRNSAppointment of Director
25th Jun 201810:30 amRNSResult of AGM
25th Jun 20187:00 amRNSLifts Beutong Copper-Gold Project Interest to 80%
22nd Jun 201810:57 amRNSAttendance at Mining Journal Select Conference
14th Jun 201810:21 amRNSIntersects 456m of Cu mineralisation at Beutong
6th Jun 201812:00 pmRNSExercise of Options
1st Jun 201811:45 amRNSDirector Appointment
25th May 20185:00 pmRNSNotice of Annual General Meeting
24th May 20188:00 amRNSDirector Changes
16th May 20187:00 amRNSInitial Mineral Resource Estimate for BKZ Deposit
2nd May 20182:30 pmRNSExercise of Options
27th Apr 20189:00 amRNS2017 Annual Report & Financial Statements
18th Apr 20183:30 pmRNSBroker Warrants Exercised
16th Apr 20183:10 pmRNSAsiamet April Investor Events - Birmingham, London
16th Apr 201811:15 amRNSIntersects High Grade Mineralisation at Beutong
3rd Apr 201811:19 amRNSReports BKM Geotech Results - Replacement
3rd Apr 20187:30 amRNSReports Assay Results for BKM Geotech Holes
29th Mar 20185:00 pmRNSExercise of Options
28th Mar 201810:25 amRNSBKZ Delivers Outstanding Mineralisation
26th Mar 20189:35 amRNSSecures long term tenure for BKM Copper Project
19th Mar 201812:49 pmRNSBKZ Drilling Intersects High Grade Mineralisation
13th Mar 20186:15 pmRNSSuccessful Placing of £7.2 Million
13th Mar 201812:15 pmRNSPlacing to Raise up to £7.2 Million
9th Mar 201810:30 amRNSExercise of Options
1st Mar 201812:00 pmRNSCorporate Broker Appointment
1st Mar 20187:30 amRNSCommences Drilling Beutong Copper-Gold Deposit
28th Feb 20187:20 amRNSmetallurgical tests confirm positive results
22nd Feb 20181:35 pmRNSIntersects Further High-Grade Zinc, Lead, Copper
13th Feb 20181:00 pmRNSExercise of Options
6th Feb 20187:00 amRNSIntersects High Grade Copper Mineralisation at BKZ
31st Jan 20187:00 amRNSBKZ Delineation Drilling and Plans for Beutong
17th Jan 201811:45 amRNSDirector Resignation
11th Jan 201811:15 amRNSGrant of Options
11th Jan 20189:15 amRNSCommences Resource Drilling at BKZ
8th Jan 20187:00 amRNSProduction Licence for Beutong Project
19th Dec 201710:15 amRNSPositive Metallurgical Test-work Results
29th Nov 20177:00 amRNSIntersects 115.5m at 1% Cu at BK44 Zone
24th Nov 201712:15 pmRNSAppointment of James Deo as CFO
21st Nov 201712:15 pmRNSFurther High-Grade Zn-Pb-Ag at BKZ Deposit
13th Nov 20178:40 amEQSAsiamet Extends High Grade Copper Mineralisation Beneath BKZ Zn-Pb-Cu-Ag-Au Deposit

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.