Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArkle Res Regulatory News (ARK)

Share Price Information for Arkle Res (ARK)

Share Price is delayed by 15 minutes
Get Live Data
0.70    0.05 (7.69%)
Bid:
0.65
Ask:
0.75
Spread: 0.10 (15.385%)
Market Cap: £11.17m
ARK Live PriceLast checked at - London Stock Exchange

Intraday Arkle Res Share Chart

Namibia Uranium Exploration Update

Today 07:00

RNS Number : 6560J
Arkle Resources PLC
25 June 2026
 

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF THE MARKET ABUSE REGULATION (EU) 596/2014 (AS AMENDED) AS IT FORMS PART OF THE DOMESTIC LAW OF THE UNITED KINGDOM BY VIRTUE OF THE EUROPEAN UNION (WITHDRAWAL) ACT 2018 (AS AMENDED). UPON PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

25 June 2026

Arkle Resources PLC

("Arkle" or the "Company")

Namibia Uranium Exploration Update

Uranium Identified in Trenching and Legacy Drillholes; Drilling to Commence Imminently at the Erongo Uranium Project, Namibia

 

Arkle Resources PLC (LSE:ARK), the energy metals explorer focused on uranium, is pleased to announce that field work, including geological mapping and trench sampling, is progressing on schedule at its Erongo Uranium Project in Namibia, ahead of Arkle's imminent maiden drill programme.

Highlights

Downhole GRS Survey Complete: 106 legacy drillholes have been surveyed across EPLs 8995 and 8298. 16 holes returned intercepts exceeding 50 ppm eU₃O₈ over one metre or more, of which seven exceeded 100 ppm eU₃O₈, with peak intercepts of 1 m at 303 ppm eU₃O₈ from 6.5 m (RC28) and 2 m at 215 ppm eU₃O₈ from 15.5 m (RC27).

Trenching and Sampling Underway: Seven trenches have been excavated so far, with lengths between 70 m and 170 m, to depths between 0.5 m and 2 m across a large ULG target of the centre-north area on EPL 8995 extending approximately 1Km by 700m. Excavations continue to expose bedrock geology, including uraniferous leucogranites for sampling. Trenching has exposed multiple stacked leucogranite sheets interleaved with metasediment, with the secondary uranium mineral carnotite logged in fractures; field radiometric readings indicate uranium across these zones, subject to confirmation by laboratory assay.

Geological Mapping Ongoing: Mapping is in its second week and continues to improve on the 1:250K resolution Geological Survey of Namibia Map sheets (2114 Omaruru and 2214 Walvis Bay). The work continues to add surface information that will inform and improve understanding of the ULG geological setting.

1,500 m of RC Drilling: A initial programme of approximately 42 RC drillholes is planned to test surface and legacy downhole radiometric anomalies across the Eastern and Central paleochannel target area of EPL 8995; the drill contractor has been engaged, with the drill-site inspection and pad preparation carried out this week and rig mobilisation to site set for Monday, 29 June 2026.

Q3 2026 planned activities: Fully funded c. 2,500 m additional RC drilling programme to commence on the ULG target, subject to the results of the trenching and sampling work.

Q3 and Q4 2026 planned activities: Additional HLEM survey lines, mapping and sampling across further paleochannel and ULG targets on EPLs 8290, 8298 and 8995, to develop the next generation of drill targets.

 

Rory Harding, Chief Executive Officer, commented:

"We are now firmly into the field, and the early signs from the ground are encouraging. Within weeks of completing the Phase 1 interpretation, our team in Namibia has trenches open across the centre-north leucogranite target on EPL 8995 and has exposed exactly the style of stacked leucogranite sheets we hoped to see, along with carnotite in the fractures, which is a clear visual marker of uranium. Grades will be confirmed by laboratory assay, and the first samples are already with the laboratory."

"The completed downhole gamma ray survey of the legacy drillholes across EPLs 8995 and 8298 complements our surface and airborne geophysics and has given us real subsurface confidence. Several legacy holes in the eastern paleochannel target returned narrow but encouraging uranium intercepts that are directly guiding the design of our first 1,500-metre drill programme. On the central-east channel, the survey points to broader mineralisation, with over 100 ppm eU₃O₈ indicated across 9.4 metres. These are radiometric indications rather than laboratory assays, but they guide us where to drill."

"With the contractor engaged and making preparations, we expect to be drilling within days."

"This is the start of a sustained, fully funded drilling campaign of around 4,000 metres across both of our principal uranium styles, with multiple further targets behind it. Shareholders should expect steady news flow through the second half of the year as assays return and drilling gets underway."

 

 

Figure 1: Trenching programme underway on EPL 8995.

 

 

 

Further Details

Legacy Downhole GRS survey complete

The downhole probe programme completed in June 2026 was planned by Arkle to gather subsurface radiometric data, and successfully executed by Terratec Geophysical Services, Namibia. A total of 106 holes were surveyed by a four-channel spectrometer tool, and sixteen of these holes returned intercepts of >50 ppm eU₃O₈ over one-metre or more, seven surveyed holes have intercepts of >100 ppm eU₃O₈. Exceptional intercepts include 1 m of 303 ppm eU₃O₈ from 6.5 m in RC28 and 2 m of 215 ppm eU₃O₈ from 15.5 m in RC27. Elsewhere on EPL 8995, the survey indicates broader mineralisation, with over 100 ppm eU₃O₈ over 9.4 m returned from the central-east of the licence. Mineralised intercepts in historical drillholes have provided useful guidance to Arkle's planned exploration drill campaign, which commences in the coming weeks at the eastern paleochannel target of EPL 8995.

Eastern EPL 8995 Paleochannel

 

Figure 2: Zoomed view of EPL 8995, showing the distribution of surveyed historical holes, processed airborne radiometric data, HLEM profiles and the current interpreted extent of paleochannels. HLEM profiles indicate a potential max depth for paleochannels of 12.5 m.

ULG Target - EPL 8995 - Trenching, Mapping and Sampling and Follow-On Drilling

The primary ULG target on EPL8995 is being explored through a trenching programme, which currently exposes target rocks in seven trenches excavated perpendicular to the prevailing metamorphic fabric. Approximately 700 m of strike length have been exposed in the seven trenches; work is ongoing and aims to provide representative sampling material from the subsurface across a target area of 1 km by 700 m.

Trenching has exposed three styles of uranium-associated mineralisation within the target: a large central leucogranite within the core of the fold structure; a sequence of multiple stacked leucogranite sheets interleaved with schist and gneiss; and a leucogranite zone developed against the carbonate (marble) contact, the last of these analogous to the high-grade leucogranite bodies developed beneath the marble at the Rössing mine. The secondary uranium mineral carnotite has been logged in fractures within both the leucogranites and the adjacent metasediments. Field scintillometer and spectrometer readings recorded elevated radiometric responses across these zones, consistent with the presence of uranium; these are preliminary field measurements and are subject to confirmation by laboratory assay.

Systematic sampling of the trenches, to characterise the extent, grade and continuity of the ULG-hosted mineralisation, is underway. 62 samples have been collected to date, with a first batch of 45 submitted to ACT Labs in Windhoek, Namibia, on 19 June 2026, together with certified reference materials and blanks for quality control. Assay results are awaited and, once received and validated, will be reported in due course, with multi-element assays to follow. The results of this work will support the design and refinement of a fully funded additional c. 2,500 metre RC drilling programme, designed to provide initial vertical control on the ULG sequence and to test grade and continuity at depth.

Figure 3: Snapshots of the trench and sample programme underway on the central ULG target area of EPL 8995; (a) ULG exposure showing smoky quartz characteristic of radioactive mineralisation (b) K, Th, and U field assay of a ULG by GS Instruments VB6 spectrometer (c) Fabric-parallel ULG sheet in schistose country rock in one of the trenches, and (d) Secondary uranium minerals (uranophane and/or carnotite on a fracture surface of ULG.

Surface Mapping

Surface mapping progress to date has identified ULG outcrop, and outcropping carbonate, calcsilicate, and pelitic rocks that represent metasedimentary packages of the Arandis Formation, a cyclic package of carbonates and reduced-facies siliciclastic rocks with similarities to the older Rössing Formation that typifies the uranium-prospective ground in the vicinity of the Rössing and Husab mines and active exploration projects in the surrounding region. Refinement of the Geological Survey Map data will be informed by the ongoing geological mapping underway on EPLs 8995, 8290 and 8298.

Key deposits occur along the NE-SW corridor "alaskite alley" within the Damara Orogen. Structural features on Arkle's licences are analogous to known mineralising pathways, supporting both ULG and palaeochannel targets that remain central to exploration. The alaskite-alley corridor is characterised by ULG intrusives that were emplaced within a stratigraphic interval between the Etuis Formation and the Chuos Formation, with much of the mineralised sheets occurring within the Khan Formation and Rossing Formation interval between. This interval is part of the upper Nosib Group and lower Swakop Group sequence.

In the locale of Arkle's exploration endeavours the country rocks are predominantly of the Swakop Group, where the role of the Arandis Formation is a reasonable analogue to the role played by the Rössing Formation as a REDOX control that focusses uranium mineralisation during ULG emplacement. In this regard the Arandis Formation is viewed as a worthwhile mapping and sampling target for ground work, trenching, and drill programme design.

Encouraging Progress on Exploration Campaign

Arkle has commenced a campaign of focussed activities across its Namibian uranium licences, commencing with a systematic trenching and sampling programme on a primary ULG target supplemented by geological mapping and surface sampling and a 1,500 m initial drill programme on its eastern paleochannel target, all advancing in parallel on EPL8995. The Company looks forward to reporting trench and surface sample assay results; progress and outcome of the imminent 1,500 m paleochannel drilling programme; and continued progress across its wider portfolio of paleochannel and ULG targets across EPL8995 and to the north on EPLs 8290 and 8298 through the second half of 2026.

Further announcements will be made as and when appropriate.

Enquiries

Arkle Resources

Rory Harding, CEO

John Teeling, Chairman

 

+44 (0)20 3051 5348

+353 (0)1 833 2833

Strand Hanson Limited

Ritchie Balmer / Imogen Ellis

Nominated & Financial Adviser

+44 (0)20 7409 3494

First Equity Limited

Jason Robertson

Joint Broker

+44 (0)20 7374 2212

Vigo Consulting

Ben Simons / Seb Weller

UK Media & IR

+44 (0)20 7390 0234

arkle.ir@vigoconsulting.com

Teneo

Luke Hogg / Molly Mooney

Ireland Media

+353 (0)1 661 4055

About Arkle Resources

Arkle Resources PLC (AIM: ARK) is a multi-commodity exploration company focused on metals which are essential for the generation and storage of clean energy: uranium, lithium and zinc. Its projects are in tier-1 mining jurisdictions in Namibia, Botswana and Ireland, adjacent to world-class deposits.

Founded in 2004 by John Teeling and Jim Finn, the Company co-discovered the Stonepark zinc deposit in County Limerick, now Ireland's second largest undeveloped resource, in joint venture with Teck Ireland. Teck's interest was acquired by Group Eleven Resources (TSX-V: ZNG), who continue to advance the project alongside Arkle.

In January 2026, the Company announced a transformative deal to acquire Namibia Uranium Pty Ltd, which has introduced four highly prospective uranium licences contiguous to major producing and development assets in what is a world-class uranium jurisdiction. This acquisition, alongside the Company's existing licence portfolio and the introduction of new management, repositions Arkle to become a leading explorer in energy metals.

For more information visit: www.arkleresources.com

 

Follow us on social media:

www.x.com/ArkleResources

www.linkedin.com/company/arkle-resources-plc

Competent Person Statement

The technical and scientific information contained in this announcement has been reviewed and approved by Dr Guy Freemantle, an independent consultant to the Company through The MSA Group (Pty) Ltd., Johannesburg, South Africa. Dr Freemantle holds a Bachelor of Science in Geology and a PhD in Geology, both at the University of the Witwatersrand. He is a member of the Society of Economic Geologists (892905) and current Vice President for the Africa Region; a Fellow of the Geological Society of South Africa (965392); and is registered with SACNASP (Registration 117527). Dr Freemantle has practised his profession continuously for 16 years and has sufficient experience and knowledge that is relevant to the style of mineralisation and type of deposits under consideration as well as to the activity that is being undertaken to fulfil requirements of a Qualified Person as per NI 43-101 / PERC Reporting Standard (2021). Dr Freemantle consents to the inclusion in this announcement of the technical and scientific information in the form and context in which it appears.

Glossary

EPL

Exclusive Prospecting Licence

eU₃O₈

Equivalent (U₃O₈). eU₃O₈ is a uranium grade derived from downhole gamma ray spectrometry rather than chemical assay and is reported as parts per million (ppm). All eU₃O₈ values are radiometric estimates and remain subject to confirmation by laboratory assay.

HLEM

Horizontal Loop Electromagnetic

K

Potassium

Ppm

Parts per million

RC

Reverse Circulation

Th

Thorium

U

Uranium

ULG

Uraniferous Leucogranite

 

 

 

 

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSELFULEMSEDM
Date   Source Headline
24th Jul 20197:00 amRNSSignificant Gold Anomalies at Mine River Project
27th Jun 20197:00 amRNSPosting of Annual Report and Notice of AGM
24th Jun 20197:00 amRNSFinal Results for the Year Ended 31 December 2018
7th May 20191:00 pmRNSNew Mineralisation at Stonepark Zinc Project
1st Apr 20194:14 pmRNSTotal Voting Rights
21st Mar 20194:10 pmRNSChange of Name and Update
12th Mar 20193:24 pmRNSHolding(s) in Company
12th Mar 201912:37 pmRNSResult of EGM
5th Mar 201912:31 pmRNSFundraising of £230,000
12th Feb 20197:00 amRNSProposed Change of Name
24th Jan 20191:00 pmRNSExploration Update at Stonepark Zinc Project
21st Jan 20197:00 amRNSChange of Nominated Adviser and Broker
24th Oct 20181:00 pmRNSFurther Drilling at Stonepark Zinc Project
26th Sep 20187:00 amRNSInterim Report
30th Jul 20187:00 amRNSHolding(s) in Company
25th Jul 20181:32 pmRNSResults of Annual General Meeting
5th Jul 20187:00 amRNSDirector/PDMR shareholding
4th Jul 20187:00 amRNSDrilling Recommences at Oldcastle Zinc Project
29th Jun 20187:00 amRNSPosting of Annual Report and Notice of AGM
25th Jun 201811:23 amRNSMine River Exploration Update
22nd Jun 20187:00 amRNSFinal Results for the Year Ended 31 December 2017
18th Jun 20181:01 pmRNS32.2% Zinc + Lead combined over 5.4m at Stonepark
17th Apr 20182:58 pmRNSMaiden Resource at Stonepark Zinc Project
17th Apr 20187:00 amRNSUK Investor Show 21st April 2018
28th Mar 20187:00 amRNSDrilling Commences at Mine River Gold Project
26th Mar 20187:00 amRNSBusiness Strategic Update
21st Mar 201810:50 amRNSHolding(s) in Company
16th Mar 20182:14 pmRNSInvestor Presentation
15th Mar 20184:23 pmRNSHolding(s) in Company
15th Mar 20189:44 amRNSHolding(s) in Company
9th Mar 20187:00 amRNSDrilling to Commence at the Stonepark Zinc Project
26th Feb 20187:00 amRNSStrategic Financing and Board Restructuring
11th Jan 20187:13 amRNSProspecting Update - Wicklow/Wexford Gold Project
2nd Jan 20182:55 pmRNSHolding(s) in Company
21st Dec 20177:00 amRNSUpdate on Gold Drilling and Field Exploration
16th Nov 20179:52 amRNSGold Drilling to Commence at Mine River
9th Nov 20171:37 pmRNSHolding(s) in Company
9th Nov 20178:52 amRNS14.25g/t gold over 0.5m at Inishowen
27th Oct 20177:00 amRNSDrilling Completed at Inishowen
25th Oct 20172:29 pmRNSHolding(s) in Company
19th Oct 201711:50 amRNSHolding(s) in Company
19th Oct 20177:00 amRNSAcquisition Increases Wicklow Gold Strike Length
17th Oct 201710:14 amRNSReport On Stonepark Zinc Published
13th Oct 201712:16 pmRNSHolding(s) in Company
3rd Oct 20171:29 pmRNSHolding(s) in Company
26th Sep 20177:00 amRNSInterim Statement for the period ended 30 June 17
20th Sep 20179:42 amRNSFurther Drilling to Commence at Inishowen Project
13th Sep 20177:00 amRNSGroup Eleven Acquires Teck Stake in Stonepark
7th Sep 20179:54 amRNSHolding(s) in Company
6th Sep 20173:10 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.