Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArkle Res Regulatory News (ARK)

Share Price Information for Arkle Res (ARK)

Share Price is delayed by 15 minutes
Get Live Data
0.725    -0.025 (-3.33%)
Bid:
0.65
Ask:
0.80
Spread: 0.15 (23.077%)
Market Cap: £11.49m
ARK Live PriceLast checked at - London Stock Exchange

Intraday Arkle Res Share Chart

Drilling Update

4 Sep 2009 07:00

RNS Number : 5066Y
Connemara Mining Company plc
04 September 2009
 



4th September 2009 

Connemara Mining Company PLC

Drilling Results, Stonepark, Limerick

First drill hole of the 2009 programme hits high grade zinc-lead mineralisation - the best hole to date on the project

Significantly the hole is located 1.5 km northwest of the earlier discovery at Stonepark and could represent a new and potentially higher-grade mineralised zone

The planned 2009 exploration programme will include a further 5000 metres plus of diamond drilling - drilling is ongoing with two drill rigs currently onsite

Connemara Mining, the AIM listed Irish zinc explorer, is pleased to report a successful start to the 2009 drilling programme in Limerick. The programme is being operated by Teck Ireland Ltd., a subsidiary of Teck Resources Limited - Canada's largest diversified mining company.

The first drill hole of the current programme (TC-2638-026) intersected 7.2 metres grading 13.07% zinc and 2.23% lead from 216.05 metres depth, including 3.75m grading 17.06% zinc and 3.5% lead. The mineralisation consists of massive sphalerite, galena and pyrite and the ore-textures are typical of an "Irish-type" deposit such as Lisheen or Galmoy.

Hole ID

Hole 

Angle (degrees)

From

(m)

To

(m)

Thickness (m)

Zinc (%)

Lead (%)

TC-2638-026

-90

216.05

223.25

7.2

13.07

2.23

including:

TC-2638-026

-90

216.05

219.80

3.75

17.06

3.50

Hole 26 was drilled 1.5 km northwest of the Stonepark zone, in an area referred to as Stonepark North. This is the second hole at Stonepark North and is located 280 metres southeast of TC-2638-012, which in mid-2008, intersected a zone of colloform-textured limonite (after sulphideand returned 0.95m grading 2.73% zinand 4.73% lead from 203.15m. This weathered sulphide zone (referred to as a "gossan") was intersected beneath deep overburden and within karstically weathered limestone/dolostone that was characterised by low core recovery in the hole

Both intersections are at a similar depth and stratigraphic level within the host Waulsortian Limestone and together define what appears to be a new, and shallower, zone of mineralisation on the Limerick project. 

The planned 2009 exploration programme will include a further 5000 metres plus of diamond drilling and is being co-funded by Teck (75%) and Connemara Mining (25%). Drilling is ongoing with two drill rigs currently on site. A number of geophysical surveys are also ongoing with the aim of defining additional drill targets outside the Stonepark and Stonepark North zones.

The Stonepark North zone is located approximately 4.5 km west of the Tobermalug discovery at Minco/Xstrata's Pallas Green project. In July 2009, Minco announced a JORC-compliant resource of 11,300,000 tonnes grading 10.2% zinc and 1.9% lead in the "Inferred" resource category at Tobermalug.

John Teeling, Chairman of Connemara Mining, said - 

"This is a very positive result. The discovery has almost everything one would want - high grade, the right type of mineralisation, shallow depth and is located a good distance from the earlier discovery".

This release has been approved by Graham Reid, P. Geo., Director BRG Technical Services, consultants to Connemara. Mr. Reid has 30 years mineral exploration and evaluation experience.

Enquiries:

Connemara Mining Company Plc

John Teeling, Chairman

+353 (0)1 833 2833

Jim Finn, Financial Director

Smith & Williamson Corporate Finance

Nick Reeve

+44 (0) 117 376 2213

Barrie Newton

College Hill

Nick Elwes

+44 (0) 20 7457 2020

www.connemaramining.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLILFSSATIVIIA
Date   Source Headline
17th Jul 201412:00 pmRNSResult of AGM
18th Jun 20147:00 amRNSFinal Results for the Year Ended 31 December 2013
14th Apr 20147:00 amRNSExploration on Thurles & Donegal Blocks
11th Apr 20143:59 pmRNSExploration on Thurles & Donegal Blocks
21st Nov 20137:00 amRNSOldcastle Block Exploration Update
4th Nov 20137:00 amRNSTen Prospecting Licences Awarded in Ireland
20th Sep 20137:00 amRNSInterim Statement
26th Jul 20133:00 pmRNSResult of AGM
25th Jun 20137:00 amRNSFinal Results
10th May 20134:14 pmRNSHigh Court Ruling
30th Apr 20137:00 amRNSTotal Voting Rights
26th Apr 20132:16 pmRNSHolding(s) in Company
24th Apr 20139:48 amRNSHolding(s) in Company
22nd Apr 20137:00 amRNSFundraising and Issue of Equity
8th Apr 20133:16 pmRNSHolding(s) in Company
8th Apr 20133:14 pmRNSHolding(s) in Company
8th Apr 20137:00 amRNSExercise of options / PDMR Holdings
5th Apr 20133:45 pmRNSHolding(s) in Company
5th Apr 20133:37 pmRNSHolding(s) in Company
11th Dec 20127:00 amRNSWicklow and Wexford Gold
20th Nov 20127:00 amRNSExploration Update
24th Sep 20127:00 amRNSInterim Results
19th Sep 20128:20 amRNSOldcastle Block Exploration Update
26th Jul 20124:10 pmRNSResult of AGM
24th Jul 20127:00 amRNSPositive Results from Wicklow Gold Survey
20th Jul 20129:20 amRNSAgreement with Teck Ireland
5th Jul 20127:00 amRNSDrilling on Thurles Block
27th Jun 20127:00 amRNSAnnual Report and Accounts
19th Jun 20127:00 amRNSFinal Results
1st Jun 20127:00 amRNSDrilling on Thurles Block
18th May 20129:36 amRNSHolding(s) in Company
16th May 20127:00 amRNSCompletion of airborne survey
30th Apr 20122:25 pmRNSHolding(s) in Company
24th Feb 20127:00 amRNSLimerick Zinc Discovery Update
15th Feb 201211:27 amRNSHolding(s) in Company
6th Feb 20123:51 pmRNSHolding(s) in Company
2nd Feb 20127:00 amRNSJoint Venture Agreement
1st Feb 20127:00 amRNSRe-organisation of Nomad and Joint Broker
20th Dec 20117:00 amRNSDrilling Update
11th Nov 20113:59 pmRNSConnemara/Boliden joint undertaking not to proceed
19th Oct 20118:16 amRNSJoint Venture Agreement
22nd Sep 20117:00 amRNSInterim Report
8th Sep 20117:00 amRNSExploration Update
28th Jul 20113:52 pmRNSResult of AGM
30th Jun 20117:00 amRNSAnnual Report and Accounts
28th Jun 20117:00 amRNSChange of Adviser
22nd Jun 20117:00 amRNSFinal Results
25th May 20117:00 amRNSDrilling Update
31st Mar 201111:19 amRNSTotal Voting Rights
14th Mar 20117:00 amRNSDrilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.