Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArc Minerals Regulatory News (ARCM)

Share Price Information for Arc Minerals (ARCM)

Share Price is delayed by 15 minutes
Get Live Data
0.515    0.00 (0.00%)
Bid:
0.48
Ask:
0.55
Spread: 0.07 (14.583%)
Market Cap: £12.67m
ARCM Live PriceLast checked at - London Stock Exchange

Intraday Arc Minerals Share Chart

Exploration Update

14 Apr 2008 09:42

Templar Minerals Limited14 April 2008 14 April 2008 Templar Minerals Limited ("Templar Minerals" or "the Company") Exploration Update Further positive results from the Adjaria Project, Georgia Templar Minerals, the gold and base-metal exploration and production companywith operations in Fiji and the Republic of Georgia, is pleased to announce thefollowing exploration update for its Adjaria Gold Project in the Republic ofGeorgia. Historic non-JORC compliant Russian resource estimates indicated atotal mineral resource for the Adjaria Project of: Copper 74,800 tonnes, Lead15,000 tonnes, Zinc 11,000 tonnes, Gold 0.652 tonnes and Silver 15.1 tonnes. Highlights • Phase 1 diamond drilling completed on Vaio orebody and detailedresults awaited • Further positive results on rock chip samples for the Varazza andTskalbokela target orebodies in the South of the licence area show values for upto 11.10 g/t for gold (Au), 95.70 g/t for silver (Ag), 3.32% for copper (Cu),4.60% for lead (Pb) and 7.28% for zinc (Zn) mineralisation David Lenigas, Chairman of Templar, said: "These interim result from our ongoing drill and exploration programme increaseour confidence in the reliability of the Non-JORC compliant Russian resourceestimates derived from work previously undertaken and underline the potential ofthe Project in Georgia. The full results of this Phase 1 drilling programme and an update on our plansfor the Phase 2 infill drilling programme will be announced as soon as ispracticable." Phase 1 drilling of the Vaio Au-Ag-Zn orebody has been completed along a strikelength of approximately 500 metres. The historically-defined strike of thetargeted orebody is approximately 900 metres. Mineralised intersections havebeen sampled and are to be submitted to ALS Chemex for analysis. Development ofadditional access roads for the upcoming Phase 2 infill drilling is ongoing. In addition to the gold and zinc exploration results on the Vaio Projectannounced on 5 March 2008, further surface rock chip samples from the Varazzaand Tskalbokela areas have yielded the following assay results: • 11.1 g/t Au over 1 m • 5.38 g/t Au over 1 m • 2.91 g/t Au over 1 m • 1.25 % Cu average over 4m, maximum 4.4 % over 1 m • 2.06 % Cu over 1 m • 3.32 % Cu over 1 m • 0.90 % Cu average over 3 m • 1.69 % Cu average over 4m, maximum 6.24 % over 1 m • 1.07 % Cu 1 m • 1.29 % Cu average over 3 m • 1.10 % Cu average over 7m, maximum 4.57 % over 1 m • 2.25 % Pb average over 2 m • 4.60 % Pb over 1 m • 7.28 % Zn average over 2 m • 6.99 % Zn over 1 m • 1.14 % Zn over 1 m • 95.70 g/t Ag over 1 m • 30.90 g/t Ag over 1 m • 29.70 g/t Ag over 1 m • 18.95 g/t average over 2m These results confirm the earlier work undertaken by Russian and Georgiangeologists and will assist in targeting the best mineralization within theVarazza and Tskalbokela areas. The geochemical data suggests that a number ofpotentially economic, polymetallic mineralized zones may exist in the southerntarget areas. The geochemistry indicates the presence of elevated gold, silvercopper, lead and zinc over a broad area within the licence area. It isanticipated that the drilling will indentify a series of continous structurallycontrolled orebodies that can be developed into a tangible mineral resource. Historic exploration by Russian and Georgian geologists on the Adjaria licencearea included the excavation of a system of adits that will be re-opened. All samples are being submitted to the ISO certified ALS Chemex laboratories inRosia Montana, Romania, Izmir, Turkey and Vancouver, Canada for Gold and BaseMetal analysis. Contacts: Templar MineralsDavid Lenigas, Chairman Tel:+44 (0) 7881 825378 Beaumont CornishRoland Cornish Tel: +44 (0) 20 7628 3396Rosalind Abrahams Financial Dynamics Tel + 44 (0) 20 7831 3113Ben Brewerton The information contained in this announcement has been reviewed by Keith KenyonAUS IMM, Geochemical Consultant to Templar Minerals. He is the Qualified Personoverseeing the geochemical exploration at the Adjaria Gold Project. Mr. Kenyonhas 36 years experience in gold exploration and geochemistry and he isundertaking to act as a Qualified Person for the purposes of this announcement. GLOSSARY Geochemistry The study of the chemistry of geological materials Adit An adit is a type of horizontal or nearly horizontal excavation, generally developed for exploration or mining into the side of a mountain Au Gold Ag Silver Zn Zinc Base Metals A metal which oxidises when heated in air, e.g. lead, nickel, copper, tin, zinc, as opposed to noble metals such as gold and platinum. g/t Grams per tonne HQ Core Core from a Diamond drill hole that is 63.5 mm in diameter Polymetallic Mineral A mineral deposit consisting of polymetallic ore is the Deposit source of more than one metal suitable for recovery Forward-Looking Statements: This press release contains statements that are "forward-looking". Generally,the words "expect," "intend," "estimate," "will" and similar expressionsidentify forward-looking statements. By their very nature, forward-lookingstatements are subject to known and unknown risks and uncertainties that maycause our actual results, performance or achievements, or that of our industry,to differ materially from those expressed or implied in any of ourforward-looking statements. Statements in this press release regarding theCompany's business or proposed business, which are not historical facts, are"forward looking" statements that involve risks and uncertainties, such asestimates and statements that describe the Company's future plans, objectives orgoals, including words to the effect that the Company or management expects astated condition or result to occur. Since forward-looking statements addressfuture events and conditions, by their very nature, they involve inherent risksand uncertainties. Actual results in each case could differ materially fromthose currently anticipated in such statements. Investors are cautioned not to place undue reliance on forward-lookingstatements, which speak only as of the date they are made. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
28th May 20268:51 amRNSHolding(s) in Company
27th May 20267:00 amRNSComprehensive Settlement Agreement in Zambia
27th Apr 20267:00 amRNSPDMR Dealing
24th Apr 20267:00 amRNSResult of Placing and Subscription
23rd Apr 20264:45 pmRNSProposed Placing and Subscription
16th Apr 20265:46 pmRNSHolding(s) in Company
9th Apr 20267:00 amRNSQ1 Investor Summary
9th Mar 20267:00 amRNSCommencement of Geophysical Programme in Botswana
22nd Jan 20267:00 amRNS-RInvestor Presentation via Investor Meet Company
19th Dec 20257:00 amRNSManagement Change
19th Dec 20257:00 amRNSManagement Change
18th Nov 20253:13 pmRNSZambia Legal Update
3rd Nov 20257:00 amRNSAvanti Settlement Received
20th Oct 20257:00 amRNSCessation Of Anglo American / Arc Joint Venture
25th Sep 20257:00 amRNSInterim Results
8th Sep 20257:00 amRNSDirectorate Change
15th Aug 202511:19 amRNSZambia Legal Update
30th Jul 202510:16 amRNSDirectorate Change
23rd Jul 20259:10 amRNSZambia Licence Renewals
21st Jul 20252:37 pmRNSZambia Legal Update
11th Jul 20257:00 amRNSSettlement Agreement Reached
27th Jun 20257:00 amRNSAnnual Report for Year Ended 31 December 2024
14th May 20257:00 amRNSGeneral Update
7th Apr 20257:30 amRNSIssuance of LTIPs
7th Apr 20257:00 amRNSAcquisition of Chingola Project
4th Feb 20258:45 amRNSAssay Results Extends Copper Mineralisation
16th Jan 20252:50 pmRNSZambia Interim Injunction Secured
15th Jan 202512:25 pmRNSZambia Licence Update
29th Nov 20244:21 pmRNSResults of AGM
28th Nov 20247:00 amRNSAnglo JV Payment
18th Nov 20245:53 pmRNSZambia – JV Subsidiary Legal Case
14th Nov 20247:00 amRNSDrilling Results Confirm Copper Mineralisation
11th Nov 20245:04 pmRNSNotice of AGM
7th Nov 20247:00 amRNSZambia Exploration Update
5th Nov 202412:00 pmRNSZambia Licence Update and Investor Call
9th Oct 20247:00 amRNSBotswana License Extensions
25th Sep 20247:01 amRNSBotswana Drilling Update
25th Sep 20247:00 amRNSInterim Results
17th Sep 20247:39 amRNSBlock Listing Six-Monthly Return
17th Sep 20247:38 amRNSBlock Listing Six-Monthly Return
12th Aug 20242:53 pmRNSIssue of Shares
7th Aug 202412:59 pmRNSZambia Drilling Commenced
1st Aug 20247:00 amRNSBotswana Drilling Update
15th Jul 20247:00 amRNSChange of Nominated Adviser and Joint Broker
1st Jul 20244:41 pmRNSPDMR Dealing
27th Jun 20247:00 amRNSAnnual Report for Year Ended 31 December 2023
19th Jun 20248:16 amRNSRestoration of Trading on AIM
19th Jun 20248:15 amRNSAIM Restoration - Arc Minerals Limited
17th Jun 20244:22 pmRNSSuspension
17th Jun 20243:57 pmRNSSuspension - ARC Minerals Limited

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.