Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArc Minerals Regulatory News (ARCM)

Share Price Information for Arc Minerals (ARCM)

Share Price is delayed by 15 minutes
Get Live Data
0.515    0.00 (0.00%)
Bid:
0.48
Ask:
0.55
Spread: 0.07 (14.583%)
Market Cap: £12.67m
ARCM Live PriceLast checked at - London Stock Exchange

Intraday Arc Minerals Share Chart

Brazil Iron Ore Project

24 Aug 2009 07:00

RNS Number : 8549X
Templar Minerals Limited
24 August 2009
 



 

24 August 2009 

FOR IMMEDIATE RELEASE

Templar Minerals Ltd

('Templar' or 'the Company')

Initial Drill Results - Brazil Iron Ore Project

Templar Minerals Limited (AIM: TMP) is pleased to announce initial drilling and exploration results at the 390 square kilometre Rio Paranaiba project in the Brazilian State of Minas Gerais ('the Project'). 

The Project represents a new iron ore discovery in the Brazilian State of Minas Gerais. It is located 210km from the city of Divinopolis, a key manufacturing hub and steel production centre. The Project is 90km on paved road from the township of Patos De Minas and has excellent infrastructure including power and water access.

The Company's Consultant, Mr L.D.S. Winter, P.Geo. Reports that:

The 390 square kilometre Rio Paranaiba Project Area in Minas Gerais, Brazil is within the Tocantins Geotectonic Province of the Brasilia Fold Belt. This area is the type locality for the Araxa, Ibian and Canastra Groups of Neo Proterozoic age and they are now present as three stacked thrust sheets. The Lower Thrust Sheet hosts the Canastra Group metasedimentary sequence which in turn contains the iron-bearing units of interest. The iron-rich unit (or hematite-rich unit) is a hematite-rich phyllite which in turn rests on a quartzite horizon.

The work to date has indicated the presence of hematite-rich sediments over an east-west distance of approximately 40 km, a significant distance, and with thicknesses up to at least 40 m in surface exposures in a newly identified area.

Sampling by the Company at 20 locations,, within the Project area have been analyzed at the SGS Geosol Laboratory in Belo Horizonte. These samples gave iron ("Fe") grades in the range from 17% to over 65% with an average of 43% with low phosphorous grades in the 0.05% range. Thirty-two samples taken by A.L. Fleming averaged 65.2% Fe, 0.07% Phosphorous and Sulphur 

A preliminary drilling program has been carried out through late June and July 2009.  A number of significant intercepts have already been recorded, with drill hole Number 8 at the Corral da Estrada prospect intersecting 6 metre interval between 16 metres and 22 metres of hematite-rich sediment Two further holes at the Perfis prospectNumbers 4 and 7 have also intersected intervals of hematite-rich sediments. Hole Number 4 has intersected an 8 metre interval between 42 metres and 50 metres and hole Number 7 intersected a 17 metre interval, from 1.5 metres to 18.5 metres, of hematite-rich units. Drilling will continue based on the positive results to date. 

Three surface samples also showed enrichment in silver, cobalt, copper and zinc with one sample FRP144 reporting 14.8 parts per million (grams per tonne) of Silver, 0.3% Cobalt, 0.08% Copper and 0.09% Zinc. Further work is planned in this area to ascertain the significance of this anomaly.

Drilling to date has indicated that the iron rich mineralization sits within a structurally complex environment and significant faulting is evident in the areas drilled and appears to be disrupting some of the continuity of the hematite-rich sediments. It is considered that the objective of additional work is to determine the distribution of the iron-rich sediments and to clarify the structural situation.

The iron-rich sediments appear to be distributed over a very large area which is mainly soil, laterite and vegetation covered. To "look through" this cover, an airbourne and ground based magnetometer surveys are being commissioned to cover the high priority areas

 

Within the Rio Paranaiba Project area of influence and approximately 60 km north of Rio Paranaiba, Templar's joint venture partner holds 4 mining concessions covering approximately 80 square km. Within these concessions, a moderately hard hematite-rich sedimentary unit in the order of 25 m thick has been found to outcrop over a strike length of about 3 km.

Chairman David Lenigas commented;

'The initial results of the exploration program at Rio Parnaiba has confirmed the existence of hematite-rich iron mineralization below surface. The potential strike length of the iron rich mineralization has now been extended to some 40 kilometres and work programmes going forward will attempt to prioritise exploration targets over this significant distance.'

Competent Person

The technical information contained in this announcement has been reviewed by Mr Stewart Winter, Consulting Geologist, B.A.Sc., M.Sc., P.Geo. He is the Qualified

Person who has reviewed the field data. Mr. Winter has worked for over 50 years as a

geologist and has sufficient experience relevant to the style of mineralisation and type

of deposit under consideration and to the activity which he is undertaking, to qualify

as a Qualified Person for the purposes of this announcement.

Enquiries

Templar Minerals LimitedDavid Lenigas Tel: +44 (0)20 7016 5100 

Charles Wood Tel: +44 (0) 7971444326

Beaumont Cornish Limited

Roland Cornish / Rosalind Hill Abrahams Tel: +44 (0)20 7628 3396 

Commercial Terms on the Rio Paranaiba Iron Ore Project

The Project area is contained within 21 Mineral Licences and applications for Mineral Licenses covering approximately 39000 ha (390 km2) held in the name of Fernando Pereira da Rocha Thomsen ("Thomsen").

Pursuant to a Letter Agreement ("LA") dated 4 December 2008, Templar's 100% subsidiary, Paranaiba Minerals Ltd. ("Paranaiba" or the "Company") has the right to earn up to a 77% interest in the Project by making certain exploration expenditures over a 2 year period. All expenditures are in Canadian dollars.

The Company can earn a 50% undivided interest in the Project by making minimum expenditures of C$200,000 within 180 days of entering into a definitive Exploration and Option Agreement. The Company can earn an additional 27% interest for a total 77% interest in the Project by making additional expenditures of C$600,000 within 2 years of entering into the Exploration and Option Agreement. The total expenditures of a minimum of C$800,000 would earn the Company a 77% interest in the Project. To date, the Company has made exploration expenditures of over $C300,000 on geological mapping, sampling and drilling there meeting the requirements to own a 50% interest in the Project.

Upon successful completion of the Exploration and Option Agreement, a Joint Venture, Paranaiba 77%, Thomsen 23% would be formed.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSEWFIFSUSEEA
Date   Source Headline
28th May 20268:51 amRNSHolding(s) in Company
27th May 20267:00 amRNSComprehensive Settlement Agreement in Zambia
27th Apr 20267:00 amRNSPDMR Dealing
24th Apr 20267:00 amRNSResult of Placing and Subscription
23rd Apr 20264:45 pmRNSProposed Placing and Subscription
16th Apr 20265:46 pmRNSHolding(s) in Company
9th Apr 20267:00 amRNSQ1 Investor Summary
9th Mar 20267:00 amRNSCommencement of Geophysical Programme in Botswana
22nd Jan 20267:00 amRNS-RInvestor Presentation via Investor Meet Company
19th Dec 20257:00 amRNSManagement Change
19th Dec 20257:00 amRNSManagement Change
18th Nov 20253:13 pmRNSZambia Legal Update
3rd Nov 20257:00 amRNSAvanti Settlement Received
20th Oct 20257:00 amRNSCessation Of Anglo American / Arc Joint Venture
25th Sep 20257:00 amRNSInterim Results
8th Sep 20257:00 amRNSDirectorate Change
15th Aug 202511:19 amRNSZambia Legal Update
30th Jul 202510:16 amRNSDirectorate Change
23rd Jul 20259:10 amRNSZambia Licence Renewals
21st Jul 20252:37 pmRNSZambia Legal Update
11th Jul 20257:00 amRNSSettlement Agreement Reached
27th Jun 20257:00 amRNSAnnual Report for Year Ended 31 December 2024
14th May 20257:00 amRNSGeneral Update
7th Apr 20257:30 amRNSIssuance of LTIPs
7th Apr 20257:00 amRNSAcquisition of Chingola Project
4th Feb 20258:45 amRNSAssay Results Extends Copper Mineralisation
16th Jan 20252:50 pmRNSZambia Interim Injunction Secured
15th Jan 202512:25 pmRNSZambia Licence Update
29th Nov 20244:21 pmRNSResults of AGM
28th Nov 20247:00 amRNSAnglo JV Payment
18th Nov 20245:53 pmRNSZambia – JV Subsidiary Legal Case
14th Nov 20247:00 amRNSDrilling Results Confirm Copper Mineralisation
11th Nov 20245:04 pmRNSNotice of AGM
7th Nov 20247:00 amRNSZambia Exploration Update
5th Nov 202412:00 pmRNSZambia Licence Update and Investor Call
9th Oct 20247:00 amRNSBotswana License Extensions
25th Sep 20247:01 amRNSBotswana Drilling Update
25th Sep 20247:00 amRNSInterim Results
17th Sep 20247:39 amRNSBlock Listing Six-Monthly Return
17th Sep 20247:38 amRNSBlock Listing Six-Monthly Return
12th Aug 20242:53 pmRNSIssue of Shares
7th Aug 202412:59 pmRNSZambia Drilling Commenced
1st Aug 20247:00 amRNSBotswana Drilling Update
15th Jul 20247:00 amRNSChange of Nominated Adviser and Joint Broker
1st Jul 20244:41 pmRNSPDMR Dealing
27th Jun 20247:00 amRNSAnnual Report for Year Ended 31 December 2023
19th Jun 20248:16 amRNSRestoration of Trading on AIM
19th Jun 20248:15 amRNSAIM Restoration - Arc Minerals Limited
17th Jun 20244:22 pmRNSSuspension
17th Jun 20243:57 pmRNSSuspension - ARC Minerals Limited

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.