Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAngus Energy Regulatory News (ANGS)

  • This share is currently suspended. It was suspended at a price of 0.213

Share Price Information for Angus Energy (ANGS)

Share Price is delayed by 15 minutes
Get Live Data
0.213    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £10.62m
ANGS Live PriceLast checked at - London Stock Exchange

Intraday Angus Energy Share Chart

Brockham Field Update

26 Jun 2017 12:00

RNS Number : 1595J
Angus Energy PLC
26 June 2017
 

26 June 2017

Angus Energy plc

("Angus Energy")

Update on Brockham oil field operations

Angus Energy plc. (the "Company") is pleased to announce that Surrey County Council has now confirmed that the planning application to regularise the upgraded surface infrastructure at the Brockham Oil Field (PL235) will not require an Environmental Impact Assessment.

The Brockham site has undergone extensive modification and upgrade works (including new site cabins, fencing, concrete bunding works for high rate production equipment and associated surface structures) in preparation for the new oil production planned from the recent Brockham operations. This work is separate to the subsurface work undertaken by Angus and in this regard, the Company's guidance on 10 March 2017 and reiterated since then, remains unchanged.

Previous guidance for oil production to commence from the Kimmeridge at Brockham in the summer 2017 remains unchanged.

In addition, the Company notes the RNS published last week, 'Oil Seeps from Kimmeridge Limestone Core Samples' by UK Oil & Gas Investments plc. at Broadford Bridge.

The initial coring results at the Broadford Bridge exploratory site, approximately 30km southwest of the Brockham Oil Field and approximately 22km northeast of the Lidsey Oil Field, reported on Friday are supplementary confirmation of Angus Energy's RNS of 3 March 2017 outlining the detailed maturity analysis and fracture analysis of the Brockham-X4Z well's Kimmeridge reservoir utilising the Weatherford Ultra Wave Acoustic Borehole Imaging Tool.

Results of Angus Energy's published analysis on the Brockham-X4Z side track confirmed the reservoir consists of numerous interbedded layers of limestone and shale with abundant natural fracturing. The gross thickness of the Kimmeridge reservoir in Brockham-X4Z is calculated to be 385 meters. Further analysis strengthens our hypothesis that the Kimmeridge reservoir in that flank of the Weald Basin (covering Brockham, Horse Hill etc.) is a single reservoir which may even extend as far south as Angus Energy's field at Lidsey although maturity may not be adequate for hydrocarbon production (to be evaluated during upcoming Lidsey well). This Kimmeridge reservoir is naturally fractured and can be produced via conventional production methods (i.e. no fracking). The production of the Kimmeridge oil will be realised via the natural fracture system present in the interbedded limestone and shale layers in the reservoir.

A 200-meter band of the reservoir in Brockham-X4Z is naturally fractured and will be placed into production following final consent from the OGA.

 

Paul Vonk, the Company's Managing Director, commented:

"All are very encouraging results for the ultimate potential of Angus Energy's assets in the Weald Basin. Our analysis along with the reported results from Broadford Bridge last week, further reduce the operational risk of our planned production from the Kimmeridge at Brockham this summer."

 

Qualified Person's Statement:

Chris de Goey, a Non-Executive Director of the Company, who has over 20 years of relevant experience in the oil and gas industry, has approved the information contained in this announcement. Mr de Goey is a member of the Petroleum Exploration Society of Great Britain and the Society of Petroleum Engineers.

 

END.

Enquiries:

Angus Energy Plc

Jonathan Tidswell-Pretorius / Paul Vonk

Tel: +44 (0) 208 899 6380

Beaumont Cornish (NOMAD)

James Biddle/ Roland Cornish

Tel: +44 (0) 207 628 3396

www.beaumontcornish.com

Optiva Securities Limited (BROKER)

Jeremy King/ Ed McDermott

Tel: +44 (0) 203 137 1902

Abchurch

Tim Thompson

Tel: +44 (0) 20 7398 7700

 

About Angus Energy plc.

Angus Energy plc. is an AIM quoted independent onshore oil and gas development company focused on leveraging its expertise to advance its portfolio of UK assets as well as acquire, manage and monetise select projects. Angus Energy owns the majority interest and operates conventional oil production fields in Brockham (PL 235) and Lidsey (PL 241).

 

Full details on the PL 235 and PL 241 licences are set out in the Company's AIM Admission document dated 12 November 2016.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCMMGZVGVGGNZM
Date   Source Headline
23rd Jun 20267:00 amRNSInterim Results
4th Jun 20267:00 amRNSFinancial Restructuring Update
8th May 20267:00 amRNSResults of Annual General Meeting
20th Apr 20267:00 amRNSCorporate Update
9th Apr 20267:00 amRNSAnnual Report and Accounts and Notice of AGM
26th Mar 20267:00 amRNSUpdate on Audit and Expected Timing of Results
19th Mar 20267:00 amRNSCompany Update
10th Mar 20267:00 amRNSHedging Update
19th Feb 20267:00 amRNSOperations and Finance Update
22nd Jan 20267:00 amRNSFourth Quarter 2025 Company Update
19th Dec 20257:00 amRNSSaltfleetby Gas Field Workover
19th Dec 20257:00 amRNSSaltfleetby Gas Field Workover
20th Nov 20252:27 pmRNSCompany Update
3rd Nov 20257:00 amRNSProduction, Operations, Corporate, Finance Update
13th Oct 20257:00 amRNSFinance, Potential Acquisition Update
8th Aug 20257:00 amRNSNon-Executive Director Appointments
30th Jul 20257:00 amRNS2025 Annual Maintenance Shutdown Completed
21st Jul 202511:49 amRNSQ2 2025 Production, Operations and Finance Update
11th Jul 20257:00 amRNSForum Energy Deferred Consideration Board Changes
30th Jun 20257:00 amRNSInterim Results for Six Months ended 31 March 2025
19th Jun 20257:00 amRNSBoard Change
6th Jun 20257:00 amRNSFinance Update
27th May 20252:51 pmRNSFinance Update
19th May 202512:42 pmRNSPotential Reverse Takeover and Suspension
19th May 202512:10 pmRNSSuspension - Angus Energy plc
7th May 20257:00 amRNSOperations and Finance Update
16th Apr 20257:10 amRNSQ1 2025 Production and Operations Update
1st Apr 20257:00 amRNSBooster Compressor Update
31st Mar 20252:53 pmRNSResults of Annual General Meeting
27th Mar 20253:39 pmRNSHolding(s) in Company
19th Mar 20257:00 amRNSDeferred Consideration and New Compressor Update
6th Mar 20257:00 amRNSAnnual Report and Accounts and Notice of AGM
25th Feb 20256:25 pmRNSHolding(s) in Company
25th Feb 20256:24 pmRNSHolding(s) in Company
25th Feb 20256:23 pmRNSHolding(s) in Company
3rd Feb 20257:00 amRNS-RSaltfleetby Field Booster Compressor
16th Jan 20257:00 amRNSQ4 2024 Production and Operations Update
7th Oct 20247:00 amRNSQ3 2024 Production and Operations Update
2nd Sep 20247:00 amRNSLaunch of New Website and Brand Refresh
23rd Jul 20247:00 amRNSChange of Advisor
17th Jul 20247:00 amRNS2024 Annual Maintenance Shutdown Completed
8th Jul 20247:00 amRNSQ2 2024 Production and Operations Update
3rd Jul 20247:00 amRNSHolding(s) in Company
28th Jun 20247:00 amRNSInterims Results to 31 March 2024
19th Jun 20247:00 amRNSNon-Executive Director Appointment
5th Jun 20247:00 amRNSBrockham Oilfield Start-up
14th May 202412:21 pmRNSOverriding Royalty Interest Payment and TVR
30th Apr 20247:00 amRNSBoard and Advisor Change
17th Apr 202411:55 amRNSDirector/PDMR Shareholding
11th Apr 20243:30 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.