REMINDER: Our user survey closes on Friday, please submit your responses here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAngus Energy Regulatory News (ANGS)

Share Price Information for Angus Energy (ANGS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.425
Bid: 0.40
Ask: 0.45
Change: -0.025 (-5.56%)
Spread: 0.05 (12.50%)
Open: 0.45
High: 0.45
Low: 0.425
Prev. Close: 0.45
ANGS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Angus Energy Commences Production from Lidsey-X2

17 Nov 2017 07:00

RNS Number : 7727W
Angus Energy PLC
17 November 2017
 

17 November 2017

 

 

Angus Energy Plc

("Angus Energy" or the "Company")

 

 

Angus Energy Commences Production from Lidsey-X2

 

 

Angus Energy Plc, a conventional oil and gas production and development company, is pleased to announce it has commenced production at Lidsey Oil Field from the well, Lidsey-X2.

 

Following the drilling and completion of the Lidsey-X2 horizontal production well, which was drilled on time and within budget, the Company is working through the production start-up and production has now been initiated. Initial start-up rates of production from the Great Oolite reservoir are coming in at forty barrels of 38.5 API of dry oil per day. The fluid column (oil) extends to 322m from surface (bottom hole depth of 1,009.3m) with a measured static bottom hole pressure of 764 psi. The Great Oolite is the first of three reservoirs with potential viability in Lidsey-X2 as per the Company RNS of 6 November 2017.

 

Compared to pre-drill assessments set forth in the Competent Person's Report ("CPR") of the 7 November 2016 Admission Document, flow rates from the Great Oolite reservoir are below expectations, and work is continuing to clean up the well. The Company is investigating the new geological and borehole information to update its understanding of the reservoir. In addition, the Company is currently examining evidence that suggests a partial flow reduction is the result of a hole in the production tubing, therefore not allowing the well to be fully drawn down. The Company is conducting further analysis and if confirmed, the Company will undertake operations to repair the tubing which will allow maximum draw from the reservoir. This is the priority for the Company over the coming weeks.

 

In addition to any necessary repair, industry information and technical guidance on analogous wells in the region suggest initial flow rates can be improved. Angus Energy believes its initial flow rates from Lidsey-X2 have similar potential for increased yield. Therefore, the Company is conducting a thorough study to optimise and enhance production levels from the Great Oolite.

 

Further to the Company RNS of 6 November 2017, Angus Energy will submit an FDP Addendum to the Oil and Gas Authority ("OGA") to begin production appraisal of the Kimmeridge and Oxford layers at Lidsey.

 

Operations Update: Lidsey-X1

 

The Lidsey-X1 well, first drilled in 1987, will now resume production from the Great Oolite reservoir in addition to production from Lidsey-X2. The Company expects to achieve the historic production levels of 15-20 barrels of oil per day ("bopd") before the well was shut in nearly 2 years ago in January 2016.

 

Given the encouraging geochemical analysis of Lidsey-X2's Kimmeridge and Oxford Layers, disclosed in the Company RNS of 6 November 2017, the above-mentioned FDP Addendum will include a submission to conduct analysis of the production potential from the Kimmeridge layer and Lias source rock from Lidsey-X1. The Lidsey-X1 exploration well was previously drilled through all the aforementioned layers.

 

The Lias source rock, positioned beneath the Great Oolite, has a comparable composition to the interbedded limestones / shales found in the hybrid Kimmeridge reservoir at the Company's Brockham Oil Field, located on the northern end of the Weald Basin. The deeper depth of the Lias source rock in the Lidsey-X1 indicates an increased maturity as compared to layers above the Great Oolite such as the component Kimmeridge and Oxford layers of the Lidsey-X2, as outlined in the Company RNS of 6 November 2017.

 

Paul Vonk, Manging Director of Angus Energy, commented: 

 

"Production has now commenced from Lidsey-X2. This project was delivered on time and on budget. Even with these initial flow rates, Lidsey-X2 provides commercial production and cash flow. We will continue to optimise production from the Great Oolite reservoir at Lidsey as we work to increase flow rates and we look forward to developing its additional reservoirs to enhance long run value for our shareholders."

 

Qualified Person's Statement:

 

Chris de Goey, a Non-Executive Director of the Company, who has over 20 years of relevant experience in the oil and gas industry, has approved the information contained in this announcement. Mr de Goey is a member of the Petroleum Exploration Society of Great Britain and the Society of Petroleum Engineers.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

END.

About Angus Energy plc.

Angus Energy plc. is a UK AIM quoted independent onshore oil and gas production and development company focused on leveraging its expertise to advance its portfolio of UK assets as well as acquire, manage and monetise select projects. Angus Energy majority owns and operates conventional oil production fields at Brockham (PL 235) and Lidsey (PL 241) and has a 12.5% interest in the Holmwood licence (PEDL143).

 

Interest in Lidsey Oil Field (PL 241):

 

Following completion of the acquisition of a 10% interest from Terrain Energy (RNS 4 May 2017) the Group will own a 60% direct interest in the Lidsey Oil Field and a 50% economic interest in the Lidsey-X2 well which is held under UK Production Licence PL 241.

 

Enquiries:

Angus Energy Plc

Jonathan Tidswell-Pretorius / Paul Vonk

Tel: +44 (0) 208 899 6380

Beaumont Cornish (NOMAD)

James Biddle/ Roland Cornish

Tel: +44 (0) 207 628 3396

Optiva Securities Limited (BROKER)

Jeremy King/ Ed McDermott

Tel: +44 (0) 203 137 1902

Yellow Jersey

Tim Thompson

Tel: +44 (0) 203 735 8825

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFIFLFLRLID
Date   Source Headline
20th Oct 20213:29 pmRNSExtension of Convertible Loan Note Maturity Date
18th Oct 20212:05 pmRNSSecond Price Monitoring Extn
18th Oct 20212:00 pmRNSPrice Monitoring Extension
5th Oct 20214:40 pmRNSSecond Price Monitoring Extn
5th Oct 20214:35 pmRNSPrice Monitoring Extension
24th Sep 20212:50 pmRNSRe-evaluation of Lidsey Field (PL 241)
10th Sep 20219:55 amRNSInvestor Call
16th Aug 20211:22 pmRNSDirector/PDMR Shareholding
11th Aug 20212:30 pmRNSUpdate on Saltfleetby Gas Field
2nd Aug 20217:00 amRNSGeneral Operations Update
26th Jul 20213:30 pmRNSSaltfleetby Planning Update
22nd Jul 20214:01 pmRNSDirector/PDMR Shareholding
15th Jul 20215:14 pmRNSHolding(s) in Company
2nd Jul 20212:06 pmRNSSecond Price Monitoring Extn
2nd Jul 20212:00 pmRNSPrice Monitoring Extension
1st Jul 20217:00 amRNSTotal Voting Rights
29th Jun 20213:44 pmRNSHalf-year Report
18th Jun 20217:00 amRNSAngus presentation at the Proactive One2One Forum
15th Jun 20217:00 amRNSAngus to present at the Proactive One2One Forum
15th Jun 20217:00 amRNSAlignment of Brockham and Lidsey Licence holdings
9th Jun 20214:29 pmRNSApproval of Saltfleetby Field Development Plan
3rd Jun 20217:00 amRNSSaltfleetby Field Finance and Operations Update
13th May 20217:00 amRNSSaltfleetby Finance Facility Signed
9th Apr 202112:43 pmRNSHolding(s) in Company
8th Apr 202110:48 amRNSHolding(s) in Company
1st Apr 20217:00 amRNSIssue of Equity and TVR
31st Mar 20213:37 pmRNSResult of AGM
29th Mar 20217:00 amRNSUpdate re. Saltfleetby Finance Facility
15th Mar 202110:17 amRNSHolding(s) in Company
9th Mar 20217:00 amRNSFinal Results
4th Mar 20217:00 amRNSInvestor Presentation
2nd Mar 20212:05 pmRNSBalcombe Oil Field- Planning Update
24th Feb 202112:00 pmRNSShareholder Update Presentation
22nd Feb 202112:03 pmRNSRe-evaluation of Lidsey Field & Update
22nd Feb 20218:30 amRNSSaltfleetby Loan Facility Update
22nd Feb 20217:00 amRNSBalcombe Field–Planning Recommendation and Meeting
4th Feb 20215:54 pmRNSIssue of Options
4th Feb 20211:52 pmRNSHolding(s) in Company
1st Feb 20213:59 pmRNSFurther Equity Placing
27th Jan 20212:06 pmRNSSecond Price Monitoring Extn
27th Jan 20212:00 pmRNSPrice Monitoring Extension
27th Jan 202112:24 pmRNSEquity Placing
27th Jan 202111:00 amRNSPrice Monitoring Extension
26th Jan 20218:44 amRNSHolding(s) in Company
25th Jan 202110:30 amRNSHolding(s) in Company
25th Jan 20217:00 amRNSSaltfleetby & Debt Funding Update
22nd Jan 20214:41 pmRNSSecond Price Monitoring Extn
22nd Jan 20214:35 pmRNSPrice Monitoring Extension
6th Jan 202112:38 pmRNSHolding(s) in Company
5th Jan 20212:36 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.