Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAngus Energy Regulatory News (ANGS)

Share Price Information for Angus Energy (ANGS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.45
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.10 (25.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.45
ANGS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Angus Energy Commences Production from Lidsey-X2

17 Nov 2017 07:00

RNS Number : 7727W
Angus Energy PLC
17 November 2017
 

17 November 2017

 

 

Angus Energy Plc

("Angus Energy" or the "Company")

 

 

Angus Energy Commences Production from Lidsey-X2

 

 

Angus Energy Plc, a conventional oil and gas production and development company, is pleased to announce it has commenced production at Lidsey Oil Field from the well, Lidsey-X2.

 

Following the drilling and completion of the Lidsey-X2 horizontal production well, which was drilled on time and within budget, the Company is working through the production start-up and production has now been initiated. Initial start-up rates of production from the Great Oolite reservoir are coming in at forty barrels of 38.5 API of dry oil per day. The fluid column (oil) extends to 322m from surface (bottom hole depth of 1,009.3m) with a measured static bottom hole pressure of 764 psi. The Great Oolite is the first of three reservoirs with potential viability in Lidsey-X2 as per the Company RNS of 6 November 2017.

 

Compared to pre-drill assessments set forth in the Competent Person's Report ("CPR") of the 7 November 2016 Admission Document, flow rates from the Great Oolite reservoir are below expectations, and work is continuing to clean up the well. The Company is investigating the new geological and borehole information to update its understanding of the reservoir. In addition, the Company is currently examining evidence that suggests a partial flow reduction is the result of a hole in the production tubing, therefore not allowing the well to be fully drawn down. The Company is conducting further analysis and if confirmed, the Company will undertake operations to repair the tubing which will allow maximum draw from the reservoir. This is the priority for the Company over the coming weeks.

 

In addition to any necessary repair, industry information and technical guidance on analogous wells in the region suggest initial flow rates can be improved. Angus Energy believes its initial flow rates from Lidsey-X2 have similar potential for increased yield. Therefore, the Company is conducting a thorough study to optimise and enhance production levels from the Great Oolite.

 

Further to the Company RNS of 6 November 2017, Angus Energy will submit an FDP Addendum to the Oil and Gas Authority ("OGA") to begin production appraisal of the Kimmeridge and Oxford layers at Lidsey.

 

Operations Update: Lidsey-X1

 

The Lidsey-X1 well, first drilled in 1987, will now resume production from the Great Oolite reservoir in addition to production from Lidsey-X2. The Company expects to achieve the historic production levels of 15-20 barrels of oil per day ("bopd") before the well was shut in nearly 2 years ago in January 2016.

 

Given the encouraging geochemical analysis of Lidsey-X2's Kimmeridge and Oxford Layers, disclosed in the Company RNS of 6 November 2017, the above-mentioned FDP Addendum will include a submission to conduct analysis of the production potential from the Kimmeridge layer and Lias source rock from Lidsey-X1. The Lidsey-X1 exploration well was previously drilled through all the aforementioned layers.

 

The Lias source rock, positioned beneath the Great Oolite, has a comparable composition to the interbedded limestones / shales found in the hybrid Kimmeridge reservoir at the Company's Brockham Oil Field, located on the northern end of the Weald Basin. The deeper depth of the Lias source rock in the Lidsey-X1 indicates an increased maturity as compared to layers above the Great Oolite such as the component Kimmeridge and Oxford layers of the Lidsey-X2, as outlined in the Company RNS of 6 November 2017.

 

Paul Vonk, Manging Director of Angus Energy, commented: 

 

"Production has now commenced from Lidsey-X2. This project was delivered on time and on budget. Even with these initial flow rates, Lidsey-X2 provides commercial production and cash flow. We will continue to optimise production from the Great Oolite reservoir at Lidsey as we work to increase flow rates and we look forward to developing its additional reservoirs to enhance long run value for our shareholders."

 

Qualified Person's Statement:

 

Chris de Goey, a Non-Executive Director of the Company, who has over 20 years of relevant experience in the oil and gas industry, has approved the information contained in this announcement. Mr de Goey is a member of the Petroleum Exploration Society of Great Britain and the Society of Petroleum Engineers.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

END.

About Angus Energy plc.

Angus Energy plc. is a UK AIM quoted independent onshore oil and gas production and development company focused on leveraging its expertise to advance its portfolio of UK assets as well as acquire, manage and monetise select projects. Angus Energy majority owns and operates conventional oil production fields at Brockham (PL 235) and Lidsey (PL 241) and has a 12.5% interest in the Holmwood licence (PEDL143).

 

Interest in Lidsey Oil Field (PL 241):

 

Following completion of the acquisition of a 10% interest from Terrain Energy (RNS 4 May 2017) the Group will own a 60% direct interest in the Lidsey Oil Field and a 50% economic interest in the Lidsey-X2 well which is held under UK Production Licence PL 241.

 

Enquiries:

Angus Energy Plc

Jonathan Tidswell-Pretorius / Paul Vonk

Tel: +44 (0) 208 899 6380

Beaumont Cornish (NOMAD)

James Biddle/ Roland Cornish

Tel: +44 (0) 207 628 3396

Optiva Securities Limited (BROKER)

Jeremy King/ Ed McDermott

Tel: +44 (0) 203 137 1902

Yellow Jersey

Tim Thompson

Tel: +44 (0) 203 735 8825

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFIFLFLRLID
Date   Source Headline
24th Jun 20197:00 amRNSHalf-year Report
19th Jun 201910:01 amRNSAcquisition of Interest in Saltfleetby Gas Field
3rd Jun 20192:05 pmRNSSecond Price Monitoring Extn
3rd Jun 20192:00 pmRNSPrice Monitoring Extension
3rd Jun 20197:00 amRNSBrockham Operations Update
29th May 20197:00 amRNSResults of Open Offer
10th May 20199:30 amRNSBrockham Operations Update
10th May 20197:00 amRNSOpen Offer Circular published
3rd May 20197:00 amRNSBrockham Operations Update
30th Apr 20199:26 amRNSResult of Placing
30th Apr 20197:00 amRNSProposed Placing and Open Offer
25th Apr 20196:30 pmRNSBrockham Operations Update
18th Apr 20197:00 amRNSCompletion of Acquisition of Lidsey interest
10th Apr 201910:00 amRNSOperations Update: Brockham
5th Apr 20194:45 pmRNSOperations Update: Brockham
3rd Apr 20197:00 amRNSOperations Update & Schedule of Works at Brockham
2nd Apr 20194:49 pmRNSTotal Voting Rights
29th Mar 201911:53 amRNSResult of AGM
21st Mar 201912:00 pmRNSOperations Update: Rig Contract for Brockham
18th Mar 20194:41 pmRNSSecond Price Monitoring Extn
18th Mar 20194:36 pmRNSPrice Monitoring Extension
14th Mar 20197:00 amRNSSPA signed regarding additional interest in Lidsey
14th Mar 20197:00 amRNSUpdate on PEDL 143 (Holmwood)
7th Mar 20197:00 amRNSNotice of AGM
6th Mar 20193:15 pmRNSBoard Changes
6th Mar 20197:00 amRNSAnnual Financial Report
26th Feb 20194:45 pmRNSOperations and Lidsey Field Interest Update
19th Feb 201910:27 amRNSVariation to Planning Consent at Lidsey
15th Feb 20197:00 amRNSEquity Placing
14th Feb 20197:00 amRNSUpdate to Financing Arrangement
8th Feb 20195:27 pmRNSBalcombe Update and Holdings in Company
8th Feb 20194:41 pmRNSSecond Price Monitoring Extn
8th Feb 20194:35 pmRNSPrice Monitoring Extension
4th Feb 20197:00 amRNSBrockham Well Test Update
29th Jan 20194:40 pmRNSSecond Price Monitoring Extn
29th Jan 20194:35 pmRNSPrice Monitoring Extension
29th Jan 20197:00 amRNSRetraction of Requisition of GM & Board Changes
10th Jan 20194:41 pmRNSSecond Price Monitoring Extn
10th Jan 20194:35 pmRNSPrice Monitoring Extension
10th Jan 20192:06 pmRNSSecond Price Monitoring Extn
10th Jan 20192:00 pmRNSPrice Monitoring Extension
10th Jan 201911:05 amRNSSecond Price Monitoring Extn
10th Jan 201911:00 amRNSPrice Monitoring Extension
10th Jan 20197:00 amRNSOperations update, Financing, GM requisition
19th Dec 20187:00 amRNSOperations update
21st Nov 201812:19 pmRNSReplacement: Result of General Meeting
21st Nov 201811:57 amRNSResult of General Meeting
5th Nov 20189:05 amRNSSecond Price Monitoring Extn
5th Nov 20189:00 amRNSPrice Monitoring Extension
5th Nov 20187:00 amRNSProposed placing to raise £2.0 million

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.