Blencowe Resources: Aspiring to become one of the largest graphite producers in the world. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0675
Bid: 0.065
Ask: 0.07
Change: 0.00 (0.00%)
Spread: 0.005 (7.692%)
Open: 0.0675
High: 0.0675
Low: 0.0675
Prev. Close: 0.0675
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

30 Sep 2019 07:01

RNS Number : 0527O
Alba Mineral Resources PLC
30 September 2019
 

Alba Mineral Resources plc

("Alba" or the "Company")

 

Horse Hill-1 and Horse Hill-2/2z Operational Update

Alba Mineral Resources plc (AIM: ALBA), the diversified mineral exploration and development company, announces that it has been informed by UK Oil & Gas Plc ("UKOG"), the majority owner of Horse Hill Developments Limited ("HHDL"), the operator of Horse Hill licences PEDL 137 and PEDL 246 in which Alba has an 11.765% interest, of the following operational update:

 

- Drilling operations for the new Horse Hill-2/2z ("HH-2/2z") Portland Sandstone well commenced ("spudded") on Sunday morning, 29 September.

 

- HH-2/2z, the first of two new horizontal wells in the field's Portland oil pool, is designed to be retained as a future production well, capable of delivering flow rates significantly higher than the results obtained from the extended well test of the HH-1 vertical Portland Sandstone discovery well.

 

- Following a planned extensive HH-2z production flow-testing campaign, both the HH-2z Portland Sandstone well and the HH-1 Kimmeridge Limestone well are expected to be put into long term production by the end of 2019.

 

- The HH-2 pilot, designed to acquire key geological data to ensure the horizontal is correctly positioned within the Portland Sandstone reservoir, will drill ahead in 12¼" diameter hole down to around 2,000 ft below surface and will then be cased back to surface. Drilling of 8½" diameter hole and conventional coring over the full vertical extent of the Portland Sandstone oil pool will then follow.

 

- Upon reaching a total depth of approximately 3,000 ft, the well will be electric logged and then plugged back in preparation for the immediate start of HH-2z. The planned HH-2z trajectory, of a total of approximately 5,800 ft from surface, will contain a horizontal section of approximately 3,200 ft wholly within the Portland Sandstone reservoir's most oil-productive zone.

 

- Following last Monday's shut-in, necessary to ensure safe rig assembly, test production from the HH-1 Kimmeridge Limestone oil pool was restarted on Saturday at initial half hourly rates of between 302-473 bopd. Kimmeridge Limestone test production is planned to continue throughout the drilling campaign.

 

- Further drilling and testing updates will be issued in due course.

 

George Frangeskides, Alba Executive Chairman, commented: "I am pleased to report on the rapid operational progress that is being made in this next phase of drilling at Horse Hill. We look forward to providing further updates as the project moves forward towards the goal of long-term commercial production by the end of 2019."

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events. Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

 

Qualified Person's Statement

The technical information contained in this announcement has been reviewed and approved by Feroz Sultan (B.Sc (Hons) Geology, M.Sc, Petroleum and Structural Geology, Karachi and M.Sc Petroleum Geology, Imperial College London), a petroleum geologist with over 45 years' experience in the management, exploration, development and production of oil and gas.

 

Glossary

flow test or well test: a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

 

horizontal well: a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

 

oil field: an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface.

 

For further information, please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman +44 20 3907 4297

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray +44 20 7213 0880

 

First Equity Limited (Broker)

Jason Robertson +44 20 7374 2212

 

Yellow Jersey PR (Financial PR/ IR)

Sarah Hollins/Harriet Jackson/Henry Wilkinson +44 20 3004 9512

alba@yellowjerseypr.com

 

 

Alba's Project & Investment Portfolio

 

Project (commodity)

Location

Ownership

Mining Projects

Amitsoq (graphite)

Greenland

90%

Clogau (gold)

Wales

90%

Inglefield (copper, cobalt, gold)

Greenland

100%

Limerick (zinc-lead)

Ireland

100%

Melville Bay (iron ore)

Greenland

51%

TBS (ilmenite)

Greenland

100%

Oil & Gas Investments

Brockham (oil)

England

5%

Horse Hill (oil)

England

11.765%

 

Web: www.albamineralresources.com

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDSEFEEUFUSESU
Date   Source Headline
16th Mar 20202:06 pmRNSSecond Price Monitoring Extn
16th Mar 20202:01 pmRNSPrice Monitoring Extension
13th Mar 20207:00 amRNSHorse Hill Update
9th Mar 202010:07 amRNSHorse Hill Update
3rd Mar 20201:04 pmRNSRelated Party Transaction
3rd Mar 202010:15 amRNSIssue of Convertible Security
24th Feb 20207:00 amRNSInvestment Facility
19th Feb 202012:30 pmRNSHorse Hill Update
19th Feb 20207:00 amRNSAmitsoq Update
28th Jan 202012:29 pmRNSClogau Drilling Results
28th Jan 20207:00 amRNSHorse Hill Update
16th Jan 20207:00 amRNSMining Projects Update
23rd Dec 20197:00 amRNSHorse Hill Update
29th Nov 20191:30 pmRNSClogau Drilling Completion
27th Nov 20197:00 amRNSHorse Hill Update
14th Nov 20197:00 amRNSClogau Drilling Mobilisation
12th Nov 20197:00 amRNSHorse Hill Update
6th Nov 20192:54 pmRNSIssue of Equity
4th Nov 20197:34 amRNSHorse Hill Update
1st Nov 20197:00 amRNSUpdated Corporate Presentation
31st Oct 20192:06 pmRNSAmitsoq Update
22nd Oct 20197:00 amRNSHorse Hill Update
15th Oct 20199:00 amRNSHorse Hill Update
11th Oct 20192:28 pmRNSUpdated Corporate Presentation
11th Oct 201910:23 amRNSHorse Hill Update
9th Oct 20198:38 amRNSHorse Hill Update
8th Oct 20197:00 amRNSHorse Hill Update
30th Sep 20197:01 amRNSHorse Hill Update
24th Sep 20197:00 amRNSHorse Hill Update
12th Sep 20197:00 amRNSHorse Hill Update
11th Sep 201912:54 pmRNSHorse Hill Update
30th Aug 20197:00 amRNSHalf-year Report
21st Aug 20191:55 pmRNSOperational Update and Portfolio Review
6th Aug 201911:30 amRNSClogau Update and Change of Adviser (Broker)
1st Aug 20197:00 amRNSHorse Hill Update
28th Jun 20194:12 pmRNSBrockham Update - Alba Comment
28th Jun 201910:15 amRNSBrockham Update
18th Jun 20197:00 amRNSProject and Investment Update
11th Jun 20197:00 amRNSHorse Hill Update
4th Jun 20197:00 amRNSPlacing and Appointment of Joint Broker
3rd Jun 20197:00 amRNSBrockham Update
31st May 20192:00 pmRNSResult of AGM
29th May 20197:00 amRNSExpanded Areas of Gold Mineralisation at Clogau
17th May 20199:15 amRNSDrilling Commences at Limerick Project
17th May 20197:00 amRNSHorse Hill Update
14th May 20194:30 pmRNSCorporate Presentation
14th May 20193:55 pmRNSMaiden Mineral Resource Estimate for TBS Project
10th May 201910:35 amRNSBrockham Update
9th May 201912:00 pmRNSNatural Resources Investor Briefing
9th May 201911:00 amRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.