The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0675
Bid: 0.065
Ask: 0.07
Change: 0.00 (0.00%)
Spread: 0.005 (7.692%)
Open: 0.0675
High: 0.0675
Low: 0.0675
Prev. Close: 0.0675
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

30 Sep 2019 07:01

RNS Number : 0527O
Alba Mineral Resources PLC
30 September 2019
 

Alba Mineral Resources plc

("Alba" or the "Company")

 

Horse Hill-1 and Horse Hill-2/2z Operational Update

Alba Mineral Resources plc (AIM: ALBA), the diversified mineral exploration and development company, announces that it has been informed by UK Oil & Gas Plc ("UKOG"), the majority owner of Horse Hill Developments Limited ("HHDL"), the operator of Horse Hill licences PEDL 137 and PEDL 246 in which Alba has an 11.765% interest, of the following operational update:

 

- Drilling operations for the new Horse Hill-2/2z ("HH-2/2z") Portland Sandstone well commenced ("spudded") on Sunday morning, 29 September.

 

- HH-2/2z, the first of two new horizontal wells in the field's Portland oil pool, is designed to be retained as a future production well, capable of delivering flow rates significantly higher than the results obtained from the extended well test of the HH-1 vertical Portland Sandstone discovery well.

 

- Following a planned extensive HH-2z production flow-testing campaign, both the HH-2z Portland Sandstone well and the HH-1 Kimmeridge Limestone well are expected to be put into long term production by the end of 2019.

 

- The HH-2 pilot, designed to acquire key geological data to ensure the horizontal is correctly positioned within the Portland Sandstone reservoir, will drill ahead in 12¼" diameter hole down to around 2,000 ft below surface and will then be cased back to surface. Drilling of 8½" diameter hole and conventional coring over the full vertical extent of the Portland Sandstone oil pool will then follow.

 

- Upon reaching a total depth of approximately 3,000 ft, the well will be electric logged and then plugged back in preparation for the immediate start of HH-2z. The planned HH-2z trajectory, of a total of approximately 5,800 ft from surface, will contain a horizontal section of approximately 3,200 ft wholly within the Portland Sandstone reservoir's most oil-productive zone.

 

- Following last Monday's shut-in, necessary to ensure safe rig assembly, test production from the HH-1 Kimmeridge Limestone oil pool was restarted on Saturday at initial half hourly rates of between 302-473 bopd. Kimmeridge Limestone test production is planned to continue throughout the drilling campaign.

 

- Further drilling and testing updates will be issued in due course.

 

George Frangeskides, Alba Executive Chairman, commented: "I am pleased to report on the rapid operational progress that is being made in this next phase of drilling at Horse Hill. We look forward to providing further updates as the project moves forward towards the goal of long-term commercial production by the end of 2019."

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events. Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

 

Qualified Person's Statement

The technical information contained in this announcement has been reviewed and approved by Feroz Sultan (B.Sc (Hons) Geology, M.Sc, Petroleum and Structural Geology, Karachi and M.Sc Petroleum Geology, Imperial College London), a petroleum geologist with over 45 years' experience in the management, exploration, development and production of oil and gas.

 

Glossary

flow test or well test: a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

 

horizontal well: a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

 

oil field: an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface.

 

For further information, please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman +44 20 3907 4297

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray +44 20 7213 0880

 

First Equity Limited (Broker)

Jason Robertson +44 20 7374 2212

 

Yellow Jersey PR (Financial PR/ IR)

Sarah Hollins/Harriet Jackson/Henry Wilkinson +44 20 3004 9512

alba@yellowjerseypr.com

 

 

Alba's Project & Investment Portfolio

 

Project (commodity)

Location

Ownership

Mining Projects

Amitsoq (graphite)

Greenland

90%

Clogau (gold)

Wales

90%

Inglefield (copper, cobalt, gold)

Greenland

100%

Limerick (zinc-lead)

Ireland

100%

Melville Bay (iron ore)

Greenland

51%

TBS (ilmenite)

Greenland

100%

Oil & Gas Investments

Brockham (oil)

England

5%

Horse Hill (oil)

England

11.765%

 

Web: www.albamineralresources.com

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDSEFEEUFUSESU
Date   Source Headline
18th Sep 20204:36 pmRNSPrice Monitoring Extension
18th Sep 20202:06 pmRNSSecond Price Monitoring Extn
18th Sep 20202:00 pmRNSPrice Monitoring Extension
16th Sep 202012:38 pmRNSExercise of Share Warrants
15th Sep 20202:00 pmRNSPrice Monitoring Extension
15th Sep 202011:06 amRNSSecond Price Monitoring Extn
15th Sep 202011:00 amRNSPrice Monitoring Extension
15th Sep 20209:05 amRNSSecond Price Monitoring Extn
15th Sep 20209:00 amRNSPrice Monitoring Extension
14th Sep 202011:05 amRNSSecond Price Monitoring Extn
14th Sep 202011:00 amRNSPrice Monitoring Extension
8th Sep 20202:52 pmRNSExercise of Share Warrants
7th Sep 20204:41 pmRNSSecond Price Monitoring Extn
7th Sep 20204:36 pmRNSPrice Monitoring Extension
7th Sep 20201:52 pmRNSOperational Update
1st Sep 20207:47 amRNSIssue of Share Warrants, Share Options and Shares
28th Aug 20207:00 amRNSHalf-year Report
21st Aug 20203:23 pmRNSInvestor Webinar
19th Aug 202011:48 amRNSIssue of Equity and Exercise of Conversion Rights
14th Aug 202012:57 pmRNSClogau Gold Mine: Update on Field Activities
7th Aug 20207:00 amRNSUpdated Corporate Presentations
3rd Aug 20207:00 amRNSShare Placing
22nd Jul 20207:00 amRNSClogau Gold Mine: Bulk Sampling Programme
30th Jun 20204:41 pmRNSSecond Price Monitoring Extn
30th Jun 20204:35 pmRNSPrice Monitoring Extension
30th Jun 20202:43 pmRNSHorse Hill Update
30th Jun 20202:06 pmRNSSecond Price Monitoring Extn
30th Jun 20202:00 pmRNSPrice Monitoring Extension
30th Jun 202011:05 amRNSSecond Price Monitoring Extn
30th Jun 202011:00 amRNSPrice Monitoring Extension
24th Jun 20204:41 pmRNSSecond Price Monitoring Extn
24th Jun 20204:37 pmRNSPrice Monitoring Extension
24th Jun 20202:06 pmRNSSecond Price Monitoring Extn
24th Jun 20202:00 pmRNSPrice Monitoring Extension
15th Jun 20209:35 amRNSPublication of Broker Research Note
5th Jun 20207:00 amRNSIssue of Equity and Exercise of Conversion Rights
12th May 20204:40 pmRNSSecond Price Monitoring Extn
12th May 20204:35 pmRNSPrice Monitoring Extension
12th May 20207:00 amRNSIssue of Equity and Exercise of Conversion Rights
28th Apr 20205:06 pmRNSDeparture of Technical Director
28th Apr 20204:42 pmRNSSecond Price Monitoring Extn
28th Apr 20204:35 pmRNSPrice Monitoring Extension
28th Apr 202012:00 pmRNSResult of AGM
22nd Apr 20207:00 amRNSIssue of Equity and Exercise of Conversion Rights
20th Apr 20204:41 pmRNSSecond Price Monitoring Extn
20th Apr 20204:36 pmRNSPrice Monitoring Extension
7th Apr 20204:29 pmRNSUpdate Re: Admission Date
7th Apr 20207:00 amRNSIssue of Equity and Exercise of Conversion Rights
3rd Apr 202010:05 amRNSPublication of Annual Report and Notice of AGM
31st Mar 202011:19 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.