Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0675
Bid: 0.065
Ask: 0.07
Change: 0.00 (0.00%)
Spread: 0.005 (7.692%)
Open: 0.0675
High: 0.0675
Low: 0.0675
Prev. Close: 0.0675
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

9 Mar 2020 10:07

RNS Number : 4278F
Alba Mineral Resources PLC
09 March 2020
 

 

 

Alba Mineral Resources plc

("Alba" or the "Company")

 

Dry Oil Flows to Surface Following Horse Hill-2z Water Shut-Off Programme

 

Alba Mineral Resources plc (AIM: ALBA), the diversified mineral exploration and development company, announces that it has received the following update from UK Oil & Gas Plc ("UKOG"), the majority owner of Horse Hill Developments Limited ("HHDL"), the operator of Horse Hill licences PEDL 137 and PEDL 246 in which Alba has an 11.765% interest:

 

- The intervention to shut off significant formation water ingress into the Horse Hill-2z ("HH-2z") horizontal production well has been successful.

 

- Following the identification of the water ingress source via production logging, a rigid setting Thermatek® plug was set over a zone of open natural fractures clustered at the deepest part or "toe" of the wellbore. Initial testing of HH-2z post-Thermatek® has demonstrated a flow of dry oil to surface, confirming that the plug was successfully set.

 

- Dry oil flow rates during the initial 48-hour period to date are encouraging, with metered daily rates during periods of flow averaging 223 barrels of oil per day ("bopd"). However, as is to be expected in the very early "clean-up" stage of such a horizontal wellbore, both oil and associated gas rates have been very variable. Half hourly measured rates have thus ranged from a high of 778 bopd to a low of around 10 bopd.

 

- The water ingress problem meant that HH-2z remained shut-in for almost three months, with spent drilling and completion fluids within the near wellbore. Consequently, it is expected that the full clean-up process is likely to take a number of weeks of aggregate flow. As part of the clean-up process, to ensure the full remaining horizontal section contributes towards aggregate oil flow, further interventions are planned to help fine-tune and optimise flow from the well.

 

- HH-2z clean-up operations are planned to continue over the coming week, after which essential maintenance and a planned upgrade of well test and production facilities will occur. These operations, designed primarily to enable simultaneous production from HH-1 and HH-2z, will require both HH-1 and HH-2 to be shut-in for a period of up to ten days.

 

- Full extended well test operations with simultaneous multi-well production are planned to resume directly after the shut-in.

 

George Frangeskides, Alba's Executive Chairman, commented:

 

"We are very pleased to learn of the completion of the well intervention involving HH-2z and that, for the first time since completion of the drilling of the well in late 2019, a significant amount of dry oil has flowed to surface. We look forward to hearing of the outcome of the further works now planned to optimise and stabilise flow from the well."

 

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events. Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

 

Qualified Person's Statement

The technical information contained in this announcement has been reviewed and approved by Feroz Sultan (B.Sc (Hons) Geology, M.Sc, Petroleum and Structural Geology, Karachi and M.Sc Petroleum Geology, Imperial College London), a petroleum geologist with over 45 years' experience in the management, exploration, development and production of oil and gas.

 

Glossary

 

horizontal well a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon;

 

oil field an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface; and

 

 

Thermatek® a Halliburton trademarked rigid setting fluid plug designed to isolate zones within a completed wellbore

 

well test or "flow test", involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate and volumes.

 

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

For further information, please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman

+44 20 3907 4297

 

 

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray

+44 20 7213 0880

 

 

 

First Equity Limited (Broker)

Jason Robertson

+44 20 7374 2212

 

 

 

 

 

Alba's Project and Investment Portfolio

Project (commodity)

Location

Ownership

Mining Projects

Amitsoq (graphite)

Greenland

90%

Clogau (gold)

Wales

90%

Inglefield (copper, cobalt, gold)

Greenland

100%

Limerick (zinc-lead)

Ireland

100%

Melville Bay (iron ore)

Greenland

51%

TBS (ilmenite)

Greenland

100%

Oil & Gas Investments

Brockham (oil)

England

5%

Horse Hill (oil)

England

11.765%

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDFLFIIVSIAIII
Date   Source Headline
29th Apr 201912:30 pmRNSClogau Sampling Results
11th Apr 20197:00 amRNSHorse Hill Update
10th Apr 201910:00 amRNSBrockham Update
3rd Apr 20197:00 amRNSBrockham Update
27th Mar 20194:35 pmRNSAlba to Attend UK Investor Show on 30 March 2019
22nd Mar 201910:41 amRNSSubscription of Shares by Directors
21st Mar 201912:00 pmRNSBrockham Update
21st Mar 20199:30 amRNSAssay Results at Thule Black Sands, Greenland
15th Mar 20197:10 amRNSHorse Hill Update
1st Mar 20197:00 amRNSAttendance at PDAC convention
26th Feb 20194:45 pmRNSBrockham Update
18th Feb 20197:00 amRNSHorse Hill Update
11th Feb 20192:00 pmRNSPrice Monitoring Extension
11th Feb 201911:05 amRNSSecond Price Monitoring Extn
11th Feb 201911:00 amRNSPrice Monitoring Extension
11th Feb 20197:00 amRNSMining Projects Update
4th Feb 20197:00 amRNSBrockham Update
16th Jan 20197:00 amRNSHorse Hill Update
10th Jan 20199:43 amRNSBrockham Operations Update
19th Dec 20187:00 amRNSBrockham Update
10th Dec 20187:00 amRNSShareholder update meeting and presentation
29th Nov 20187:00 amRNSMining Capital Conference Presentation
23rd Nov 20187:00 amRNSShareholder update meeting and presentation
15th Nov 20187:00 amRNSHorse Hill Update
13th Nov 20182:51 pmRNSCorporate Presentation
9th Nov 20183:30 pmRNSIssue of Equity
31st Oct 20187:00 amRNSInglefield Land Update
18th Oct 20187:00 amRNSHorse Hill Update
17th Oct 20187:00 amRNSClogau Field Work Results
10th Oct 20181:55 pmRNSHorse Hill Update
5th Oct 201811:30 amRNSHorse Hill Update
20th Sep 20187:00 amRNSClogau Gold Exploration Update
10th Sep 201812:30 pmRNSHorse Hill Update
24th Aug 20183:32 pmRNSHalf-year Report
24th Aug 20182:32 pmRNSCompletion of Acquisition of Further Stake in GMOW
8th Aug 20181:26 pmRNSSCC Approves Planning Application for Brockham
3rd Aug 201811:30 amRNSHorse Hill Update
18th Jul 20182:00 pmRNSHorse Hill Update
16th Jul 20187:00 amRNSConditional Acquisition of Further Stake in GMOW
9th Jul 201811:44 amRNSHolding(s) in Company
5th Jul 20187:00 amRNSNotice of Shareholder Conference Call
5th Jul 20187:00 amRNSGreenland Exploration Update
28th Jun 20187:00 amRNSNotice of Shareholder Conference Call
27th Jun 20187:00 amRNSHolding(s) in Company
27th Jun 20187:00 amRNSHorse Hill Update
20th Jun 20184:00 pmRNSAppointment of Technical Director
14th Jun 201812:30 pmRNSHorse Hill Update
29th May 20182:16 pmRNSHolding(s) in Company
25th May 201810:50 amRNSResult of AGM
24th May 20183:45 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.